Modern City
RAJEEV · Mahabubnagar · RERA P01400008175
MODERN CITY is a plotted development in Malleboinpalle, Jadcherla Mandal, Mahabubnagar District. The registered promoter is Rajeev Kumar Gupta. The project has a registered site extent of 12,673.73 sq m and a tentative layout approval for 49 plots; plot configurations are 82.69–249.62 sq m (98.9–298.5 sq yd). It is registered under TG-RERA **P01400008175**, with a promoter-declared completion before 09th February 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MODERN CITY RERA record |
| Project type | Plotted development / layout; the RERA-filed layout drawing describes open plots RERA record RERA filing |
| Phase / registered portion | Phase not disclosed; registration is for MODERN CITY. The registration record identifies the project as a plotted development RERA record |
| TG-RERA registration | P01400008175 RERA record |
| Registration validity | 05/05/2024 to 09/02/2025; certificate records no extension RERA record |
| Registered promoter | Rajeev Kumar Gupta; the header gives the legal promoter as RAJEEV RERA record Corporate record |
| RERA status | New Project; registration validity ended 09/02/2025 on the supplied certificate. Current registration status is not established by the supplied record RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Malliboinpalle / Malleboinpalle RERA record |
| Revenue village | Malleboinpalle (also rendered Malleboinpally in the approval record) RERA record |
| Mandal / district / PIN | Jadcherla / Mahabubnagar / 509001 RERA record |
| All project survey numbers and subdivisions | 34/AA/LUU, 34/AA/RUU, 34/AA/A, 34/AA/A2. The tentative layout approval spells one reference 34/AA/RUUU; retain this spelling when tracing that approval RERA record |
| Registered site extent | 12,673.73 sq m, as stated in the project land details RERA filing |
| Total / net area in layout record | The layout drawing states “Total Layout Area 13348.85,” “Net Layout Area 12673.63” and “Total net layout 12673.62 100.00”; units are not explicitly supplied for these extracted fields. The layout land-use table separately totals 12,673.62 sq m Layout record |
| Boundaries | North: ROAD; South, East and West: LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | MUDA (tentative layout approval); the filed drawing also identifies TS-bPASS permit number TS/083233/2022 Approvals record |
| Principal approval | Tentative Layout Plan 245703/LP/GP/205286/0001/2022, approved 09-02-2023 |
| Approved built-up area | 0.00 in the filed layout drawing, both excluding and including parking; the project is a plotted layout, not a filed multi-storey building scheme |
| Plot count | 49 plots in the tentative layout approval |
| Buildings / floors | No building, floor configuration or building count is disclosed for this plotted development |
| Parking | Layout drawing records 0 proposed parkings and 0.00 common parking area; plot-specific parking allocations are not supplied |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots; plot count is 49 in the tentative layout approval |
| Plot-size range | Software-measured from the drawing: 82.69–249.62 sq m (98.9–298.5 sq yd); verify against the drawing schedule Layout record |
| Booked / available | Not disclosed in the supplied project data |
| Construction / development stage | The RERA file records a tentative layout approval and a promoter completion undertaking; no independently verified site-progress assessment is supplied |
| Completion date | Promoter-declared completion undertaking: before 09th February 2025 |
| Occupancy / completion certificate | Not disclosed. The supplied approval is a tentative layout plan, and the record does not establish a final layout approval or project completion certificate |
2. The project story
MODERN CITY is registered as a plotted development in Malleboinpalle Revenue Village, Jadcherla Mandal, Mahabubnagar District. Its RERA-filed layout drawing depicts 49 open plots and allocates land to plots, internal roads, open space/park, social infrastructure and utilities. The tentative layout approval requires infrastructure and amenity works and a work-completion certificate before approval of the final layout plan. RERA record Layout record
The promoter’s Form B declaration undertakes completion before 09th February 2025. That is a promoter declaration, not independent evidence that works were completed by that date. No current construction inspection, final layout approval or occupancy/completion certificate is included in the supplied evidence.
3. Master plan, architecture & building design
This is a plotted layout, rather than a multi-storey building project. The tentative layout approval identifies 49 plots across survey references 34/AA/LUU, 34/AA/RUUU, 34/AA/A and 34/AA/A2. It specifies roads of 10.00 MT and 18.00 MT in the drawing-derived record. No building footprint, tower height, floor arrangement, lift or staircase design is disclosed; the drawing records total proposed built-up area as 0.00.
The layout drawing’s software-read area schedule reports 12,673.62 sq m as its land-use-table base:
| Layout use | Area | Share of stated base |
|---|---|---|
| Plots | 7,369.33 sq m | 58.15% |
| Roads | 3,639.91 sq m | 28.72% |
| Parks / open space | 1,201.24 sq m | 9.48% |
| Utilities | 128.26 sq m | 1.01% |
| Social infrastructure | 334.88 sq m | 2.64% |
| Amenities | 0.00 sq m | 0.00% |
Layout record
The drawing-derived area readings are software-extracted and should be checked against the signed layout drawing. The approval record also requires public-use land—including roads, open space, social infrastructure and utilities—to be developed and handed over as specified, with a work-completion certificate submitted for final layout approval.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The tentative layout approval states 49 plots. The plot schedule was software-read from two drawing sheets; the extracted size range is 82.69–249.62 sq m (98.9–298.5 sq yd), with a median of 146.07 sq m (174.7 sq yd). Check individual plot dimensions and availability against the approved drawing and current promoter inventory. Layout record
| Plot information | Supplied value |
|---|---|
| Plot count in tentative layout approval | 49 |
| Drawing-measured plots with sizes | 49 |
| Smallest measured plot | 82.69 sq m / 98.9 sq yd |
| Median measured plot | 146.07 sq m / 174.7 sq yd |
| Largest measured plot | 249.62 sq m / 298.5 sq yd |
| Booked / available counts | Not disclosed |
Layout record
The plot measurements are software-measured from drawing text, not RERA-filed carpet or saleable areas. No apartment floor plans or plot-specific saleable-area schedule is supplied. Layout record Floor plans
5. Parking & vehicle circulation
The filed layout drawing records 0 proposed parkings and 0.00 common parking area. It does not provide a parking count by plot, visitor or accessible parking provision, or individual parking-allocation terms. The layout approval calls for roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site under the stated conditions.
6. Amenities, recreation & open spaces
The tentative layout approval requires infrastructure and public-use areas to be developed. The listed works and provisions are requirements in the approval record, not evidence that they are complete. No independent completion verification is supplied.
| Description / size | Layout drawing: 1,201.24 sq m; approval record: Ac 0.297 cents, 9.4782631337667266600019095% |
|---|---|
| Declared progress / verified status | Approval requires development and handover; completion not independently verified |
| Description / size | Layout drawing: 334.88 sq m; approval record states 2.6423368837499595617041053% and that the area is saleable |
|---|---|
| Declared progress / verified status | Approval requirement; completion not independently verified |
| Description / size | Layout drawing: 128.26 sq m; approval record: Ac 0.032 cents |
|---|---|
| Declared progress / verified status | Approval requires utility provision and handover; completion not independently verified |
| Description / size | Layout drawing: 3,639.91 sq m; approval record: Ac 0.899 cents; drawing-derived road widths include 10.00 MT and 18.00 MT |
|---|---|
| Declared progress / verified status | Approval requires formation and access; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied project records.
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, septic tank / sewerage treatment plant, electric transformer and solid-waste management among the utility works. It also requires protected water supply, sewerage disposal, drains and nala channelisation, rainwater-harvesting pits, street lighting and related development works. These are approval conditions or specified works; the supplied evidence does not establish their construction, capacity or operational status.
The project records do not specify water sources or storage capacity, sewage-treatment capacity or reuse arrangements, electrical load or backup, fire-safety systems, security/CCTV, or accessibility features. No claim of statutory compliance or completed utility service can be established from the supplied material.
8. Location, access & connectivity
The registered location is Malleboinpalle, Jadcherla Mandal, Mahabubnagar District, Telangana, PIN 509001. The supplied cadastral parcel centroid is 16.75624, 78.10196. The project boundary schedule identifies a road on the north side and land on the other three sides. RERA record RERA filing Location record Cadastral map
The nearest sampled Outer Ring Road interchange is listed at approximately 63.2 km. No other measured approach-road, public-transport or landmark distances are supplied. Location record
9. Developer & development status
The TG-RERA registration certificate names Rajeev Kumar Gupta as promoter; the project header records the legal promoter as RAJEEV. Entity type and corporate identifiers are not established in the supplied data. The promoter’s Form B is a self-declaration by Rajeev Kumar Gupta, Kammari Narsim hulu and Kummari Masaiah, including the undertaking to complete the project before 09th February 2025. RERA record Corporate record
The approval record identifies Rajeev Kumar Gupta, K Narsim hulu and K Masaiah as applicants and requires the layout developer to complete infrastructure and amenity works within two years from approval, submit a licensed technical person’s work-completion certificate, and obtain final layout approval. The supplied evidence does not establish the current physical progress or completion of those works.
10. Approvals, official records & documents
| Evidence supplied | Registration certificate, P01400008175, issued 05/05/2024; validity stated through 09/02/2025 |
|---|---|
| What it establishes | Registration of MODERN CITY as a project under section 5; certificate states the 70% separate-account condition and quarterly-update requirement |
| Evidence supplied | MUDA approval 245703/LP/GP/205286/0001/2022, approved 09-02-2023 |
|---|---|
| What it establishes | Tentative approval for a 49-plot layout, subject to listed development conditions; the approval expressly says it is not proof of title |
| Evidence supplied | TS-bPASS permit number TS/083233/2022, dated 02-01-2023 in the drawing extraction |
|---|---|
| What it establishes | A permit number appears on the filed layout drawing; the supplied drawing extraction describes it as a draft technical layout pattern |
| Evidence supplied | Promoter declaration, including completion undertaking before 09th February 2025 |
|---|---|
| What it establishes | Promoter’s filed statements and undertakings; not independent verification of completion |
| Evidence supplied | Not supplied |
|---|---|
| What it establishes | The evidence provided does not establish final layout approval or completed development works |
The supplied documents do not include an occupancy certificate or project completion certificate. The approval record calls for a work-completion certificate before final layout approval.
1. Project at a glance
Project identity
Registered name: MODERN CITY
Project type: Plotted development / layout; the RERA-filed layout drawing describes open plots
Phase / registered portion: Phase not disclosed; registration is for MODERN CITY. The registration record identifies the project as a plotted development
TG-RERA registration: P01400008175
Registration validity: 05/05/2024 to 09/02/2025; certificate records no extension
Registered promoter: Rajeev Kumar Gupta; the header gives the legal promoter as RAJEEV
RERA status: New Project; registration validity ended 09/02/2025 on the supplied certificate. Current registration status is not established by the supplied record
Land and geographic identity
Locality: Malliboinpalle / Malleboinpalle
Revenue village: Malleboinpalle (also rendered Malleboinpally in the approval record)
Mandal / district / PIN: Jadcherla / Mahabubnagar / 509001
All project survey numbers and subdivisions: 34/AA/LUU, 34/AA/RUU, 34/AA/A, 34/AA/A2. The tentative layout approval spells one reference 34/AA/RUUU; retain this spelling when tracing that approval
Registered site extent: 12,673.73 sq m, as stated in the project land details
Total / net area in layout record: The layout drawing states “Total Layout Area 13348.85,” “Net Layout Area 12673.63” and “Total net layout 12673.62 100.00”; units are not explicitly supplied for these extracted fields. The layout land-use table separately totals 12,673.62 sq m
Boundaries: North: ROAD; South, East and West: LAND
Development identity
Sanctioning authority: MUDA (tentative layout approval); the filed drawing also identifies TS-bPASS permit number TS/083233/2022
Principal approval: Tentative Layout Plan 245703/LP/GP/205286/0001/2022, approved 09-02-2023
Approved built-up area: 0.00 in the filed layout drawing, both excluding and including parking; the project is a plotted layout, not a filed multi-storey building scheme
Plot count: 49 plots in the tentative layout approval
Buildings / floors: No building, floor configuration or building count is disclosed for this plotted development
Parking: Layout drawing records 0 proposed parkings and 0.00 common parking area; plot-specific parking allocations are not supplied
Offering and status
Unit type: Plots; plot count is 49 in the tentative layout approval
Plot-size range: Software-measured from the drawing: 82.69–249.62 sq m (98.9–298.5 sq yd); verify against the drawing schedule
Booked / available: Not disclosed in the supplied project data
Construction / development stage: The RERA file records a tentative layout approval and a promoter completion undertaking; no independently verified site-progress assessment is supplied
Completion date: Promoter-declared completion undertaking: before 09th February 2025
Occupancy / completion certificate: Not disclosed. The supplied approval is a tentative layout plan, and the record does not establish a final layout approval or project completion certificate
2. The project story
MODERN CITY is registered as a plotted development in Malleboinpalle Revenue Village, Jadcherla Mandal, Mahabubnagar District. Its RERA-filed layout drawing depicts 49 open plots and allocates land to plots, internal roads, open space/park, social infrastructure and utilities. The tentative layout approval requires infrastructure and amenity works and a work-completion certificate before approval of the final layout plan.
The promoter’s Form B declaration undertakes completion before 09th February 2025. That is a promoter declaration, not independent evidence that works were completed by that date. No current construction inspection, final layout approval or occupancy/completion certificate is included in the supplied evidence.
3. Master plan, architecture & building design
This is a plotted layout, rather than a multi-storey building project. The tentative layout approval identifies 49 plots across survey references 34/AA/LUU, 34/AA/RUUU, 34/AA/A and 34/AA/A2. It specifies roads of 10.00 MT and 18.00 MT in the drawing-derived record. No building footprint, tower height, floor arrangement, lift or staircase design is disclosed; the drawing records total proposed built-up area as 0.00.
The layout drawing’s software-read area schedule reports 12,673.62 sq m as its land-use-table base:
| Layout use | Area | Share of stated base |
|---|---|---|
| Plots | 7,369.33 sq m | 58.15% |
| Roads | 3,639.91 sq m | 28.72% |
| Parks / open space | 1,201.24 sq m | 9.48% |
| Utilities | 128.26 sq m | 1.01% |
| Social infrastructure | 334.88 sq m | 2.64% |
| Amenities | 0.00 sq m | 0.00% |
The drawing-derived area readings are software-extracted and should be checked against the signed layout drawing. The approval record also requires public-use land—including roads, open space, social infrastructure and utilities—to be developed and handed over as specified, with a work-completion certificate submitted for final layout approval.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The tentative layout approval states 49 plots. The plot schedule was software-read from two drawing sheets; the extracted size range is 82.69–249.62 sq m (98.9–298.5 sq yd), with a median of 146.07 sq m (174.7 sq yd). Check individual plot dimensions and availability against the approved drawing and current promoter inventory.
Plot count in tentative layout approval: 49
Drawing-measured plots with sizes: 49
Smallest measured plot: 82.69 sq m / 98.9 sq yd
Median measured plot: 146.07 sq m / 174.7 sq yd
Largest measured plot: 249.62 sq m / 298.5 sq yd
Booked / available counts: Not disclosed
The plot measurements are software-measured from drawing text, not RERA-filed carpet or saleable areas. No apartment floor plans or plot-specific saleable-area schedule is supplied.
5. Parking & vehicle circulation
The filed layout drawing records 0 proposed parkings and 0.00 common parking area. It does not provide a parking count by plot, visitor or accessible parking provision, or individual parking-allocation terms. The layout approval calls for roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site under the stated conditions.
6. Amenities, recreation & open spaces
The tentative layout approval requires infrastructure and public-use areas to be developed. The listed works and provisions are requirements in the approval record, not evidence that they are complete. No independent completion verification is supplied.
| Description / size | Layout drawing: 1,201.24 sq m; approval record: Ac 0.297 cents, 9.4782631337667266600019095% |
|---|---|
| Declared progress / verified status | Approval requires development and handover; completion not independently verified |
| Description / size | Layout drawing: 334.88 sq m; approval record states 2.6423368837499595617041053% and that the area is saleable |
|---|---|
| Declared progress / verified status | Approval requirement; completion not independently verified |
| Description / size | Layout drawing: 128.26 sq m; approval record: Ac 0.032 cents |
|---|---|
| Declared progress / verified status | Approval requires utility provision and handover; completion not independently verified |
| Description / size | Layout drawing: 3,639.91 sq m; approval record: Ac 0.899 cents; drawing-derived road widths include 10.00 MT and 18.00 MT |
|---|---|
| Declared progress / verified status | Approval requires formation and access; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied project records.
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, septic tank / sewerage treatment plant, electric transformer and solid-waste management among the utility works. It also requires protected water supply, sewerage disposal, drains and nala channelisation, rainwater-harvesting pits, street lighting and related development works. These are approval conditions or specified works; the supplied evidence does not establish their construction, capacity or operational status.
The project records do not specify water sources or storage capacity, sewage-treatment capacity or reuse arrangements, electrical load or backup, fire-safety systems, security/CCTV, or accessibility features. No claim of statutory compliance or completed utility service can be established from the supplied material.
8. Location, access & connectivity
The registered location is Malleboinpalle, Jadcherla Mandal, Mahabubnagar District, Telangana, PIN 509001. The supplied cadastral parcel centroid is 16.75624, 78.10196. The project boundary schedule identifies a road on the north side and land on the other three sides.
The nearest sampled Outer Ring Road interchange is listed at approximately 63.2 km. No other measured approach-road, public-transport or landmark distances are supplied.
9. Developer & development status
The TG-RERA registration certificate names Rajeev Kumar Gupta as promoter; the project header records the legal promoter as RAJEEV. Entity type and corporate identifiers are not established in the supplied data. The promoter’s Form B is a self-declaration by Rajeev Kumar Gupta, Kammari Narsim hulu and Kummari Masaiah, including the undertaking to complete the project before 09th February 2025.
The approval record identifies Rajeev Kumar Gupta, K Narsim hulu and K Masaiah as applicants and requires the layout developer to complete infrastructure and amenity works within two years from approval, submit a licensed technical person’s work-completion certificate, and obtain final layout approval. The supplied evidence does not establish the current physical progress or completion of those works.
10. Approvals, official records & documents
| Evidence supplied | Registration certificate, P01400008175, issued 05/05/2024; validity stated through 09/02/2025 |
|---|---|
| What it establishes | Registration of MODERN CITY as a project under section 5; certificate states the 70% separate-account condition and quarterly-update requirement |
| Evidence supplied | MUDA approval 245703/LP/GP/205286/0001/2022, approved 09-02-2023 |
|---|---|
| What it establishes | Tentative approval for a 49-plot layout, subject to listed development conditions; the approval expressly says it is not proof of title |
| Evidence supplied | TS-bPASS permit number TS/083233/2022, dated 02-01-2023 in the drawing extraction |
|---|---|
| What it establishes | A permit number appears on the filed layout drawing; the supplied drawing extraction describes it as a draft technical layout pattern |
| Evidence supplied | Promoter declaration, including completion undertaking before 09th February 2025 |
|---|---|
| What it establishes | Promoter’s filed statements and undertakings; not independent verification of completion |
| Evidence supplied | Not supplied |
|---|---|
| What it establishes | The evidence provided does not establish final layout approval or completed development works |
The supplied documents do not include an occupancy certificate or project completion certificate. The approval record calls for a work-completion certificate before final layout approval.
Frequently asked questions
Is MODERN CITY registered with Telangana RERA?
Yes. MODERN CITY is registered with the Telangana Real Estate Regulatory Authority as P01400008175; the registration status is New Project.
Who is the developer of MODERN CITY?
The promoter named in the RERA registration is RAJEEV.
Where is MODERN CITY located?
MODERN CITY is in Malliboinpalle, Malleboinpalle, Jadcherla, Mahabubnagar, Telangana (509001).
When will MODERN CITY be completed?
The promoter's proposed date of completion filed with RERA is 09/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Malleboinpalle