Gsr City
GONE · Mancherial · RERA P01200007049
GSR CITY is a plotted development / tentative residential layout beside Srilaxmi Layout, in Mancherial Revenue Village, Mancherial mandal, Mancherial district. The registered promoter is Gone Shyam Sundar Rao. The project has a registered site extent of 18175.71 sq. m and the tentative layout identifies 58 plots; plot configurations are not provided. Its TG-RERA registration is P01200007049, and the proposed completion date is 11/10/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | GSR CITY RERA record |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | Not identified as a separate phase in the supplied record; the registration and plan refer to the plotted project on Survey No. 11/1/2. Approvals record |
| TG-RERA registration | P01200007049 RERA record |
| Registration validity | 04/10/2023 to 11/10/2024; the certificate says one year, and the supplied record does not show an extension. This is registration validity, not a completion date. Approvals record |
| Registered promoter | Gone Shyam Sundar Rao, as named on the registration certificate; entity type is not identified in the supplied record. Corporate record |
| RERA status | The supplied certificate records registration. Current portal status is not established by the supplied evidence. Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | BESIDE SRILAXMI LAYOUT RERA record RERA filing |
| Revenue village | Mancherial Revenue Village RERA record |
| Mandal / district / PIN | Mancherial / Mancherial / 504208 RERA record RERA filing |
| Project survey number and subdivision | 11/1/2 RERA record Land records |
| Registered site extent | 18175.71 sq. m RERA filing |
| Net / total area | 18175.71 sq. m net area and 18175.71 sq. m total area in the RERA land details. RERA filing |
| Boundaries | East: OTHERS LAND; West: ROAD; North: APPROVED LAYOUT 64 BY 97; South: OTHERS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Mancherial Municipality/Municipal Corporation; the RERA filing identifies DTCP as the authority name. Approvals record |
| Principal layout approval | Tentative Layout Plan No. 0019/LO/3026/2022, dated 10/11/2022; application No. 004240/LO/DTCP/3026/0025/2022. Approvals record |
| Layout extent and plotted area | The approval drawing states 4 Acer 19.65 Gts 21739 Sq. Yds and identifies 58 No's plots. |
| Approved built-up area | 10335.03 sq. m is recorded in the RERA land/build-up details; a separate built-up-area breakdown is not supplied. RERA filing |
| Buildings, floors and parking levels | Not applicable to the supplied plotted-layout plan; no building count, floor configuration or parking levels are recorded. |
| Unit counts | The tentative layout plan identifies 58 plots. The supplied RERA evidence does not provide a separate unit-inventory or booked/available count. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Offering | Plots in a proposed residential layout; RERA-filed plot sizes, unit inventory and booked/available counts are not provided in the supplied evidence. RERA record RERA unit table |
| Registration validity | 04/10/2023–11/10/2024; no extension is shown in the supplied certificate. |
| Completion date | The RERA record gives 11/10/2024 as the proposed completion date. RERA record RERA filing |
| Construction / development stage | The supplied record gives 80% completeness, but does not specify the measurement date, activities completed, or whether this is independently verified. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The approval is for a tentative layout, not an occupancy certificate. Document index |
2. The project story
GSR CITY is registered as a plotted-development project in Mancherial village, Mancherial mandal and district, Telangana, on Survey No. 11/1/2. Its filed locality is BESIDE SRILAXMI LAYOUT. The RERA-filed land extent is 18175.71 sq. m. RERA record Land records RERA filing
The municipal approval document describes a tentative residential layout of 58 plots. Its area statement allocates land to plots, roads, a park/open space, social infrastructure and utilities. The approval places responsibility for developing the layout infrastructure on the applicant and specifies eventual handover of designated roads, open space and utility land to the Municipality by registered gift deed.
The RERA record reports 80% completeness, but the supplied information does not define that figure or provide independently verified site progress. The stated completion date is 11/10/2024; no occupancy or completion certificate is supplied. Registration was valid through 11/10/2024, a separate status from the project completion date. RERA record RERA filing
3. Master plan, architecture & building design
The supplied approval is for a tentative plotted layout, not a building or apartment plan. It identifies 58 plots and the following land-use figures from the layout drawing:
| Layout component | Area as printed on approval | Share as printed |
|---|---|---|
| Plotted area | 2 Acer 22.16 Gts 12361 Sq. Yds | 56.86% |
| Road area | 1 Acer 13.67 Gts 6494 Sq. Yds | 29.87% |
| Open space (park) | 0 Acer 16.53 Gts 2000 Sq. Yds | 9.2% |
| Social infrastructure | 0 Acer 5.39 Gts 653 Sq. Yds | 3% |
| Utilities | 0 Acer 1.9 Gts 230 Sq. Yds | 1.06% |
| Mortgage area | 0 Acer 16.34 Gts 1977 Sq. Yds | 15.95% of plotted area |
The mortgage area is identified as Plots 45, 28–29 and 44, 30–36, in favour of Mancherial Municipality/Municipal Corporation under Mortgage Deed No. 11243/2022, dated 24 June 2022. The approval describes this mortgage as linked to development compliance and release of the final layout.
RERA-filed total and net land area are each 18175.71 sq. m; the approval separately prints its extent as 4 Acer 19.65 Gts 21739 Sq. Yds. No building footprint, residential floor configuration, building count, or building-level phase plan is supplied. RERA filing
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment configuration schedule. The approval drawing identifies 58 plots, but the supplied evidence does not establish plot-size bands, plot-by-plot dimensions, or booked and available counts. RERA unit table Layout record
| Offering | Plot count | Booked | Available | RERA-filed plot sizes |
|---|---|---|---|---|
| Plots | 58 | Not provided | Not provided | Not provided |
The two supplied drawing sheets are layout sheets, not floor plans with apartment units. No software-measured carpet-area or room measurements are available. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not state a parking-space count, parking allocation, or separate resident, visitor, accessible or two-wheeler provision. The approval provides for layout roads and states that roads are to be opened for access to neighbouring sites; it does not describe parking bays, driveway dimensions or pedestrian separation. RERA filing
6. Amenities, recreation & open spaces
The approval and RERA amenity list identify proposed or listed layout infrastructure. The supplied progress percentages are 0 where shown; they do not establish that facilities are complete or independently inspected. RERA amenities
| Facility | Park / organized recreational open space |
|---|---|
| Description / size | 0 Acer 16.53 Gts 2000 Sq. Yds; approval states 9.2% |
| Evidence source | Layout record |
| Declared progress / verified status | Listed/approved in tentative layout; no completion evidence supplied. |
| Facility | No specific sports facility identified |
|---|---|
| Description / size | Not provided |
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established. |
| Facility | Social infrastructure site |
|---|---|
| Description / size | 0 Acer 5.39 Gts 653 Sq. Yds; approval states 3% |
| Declared progress / verified status | Reserved in tentative layout; no specific building or completion evidence supplied. |
| Facility | Roads |
|---|---|
| Description / size | 1 Acer 13.67 Gts 6494 Sq. Yds; approval states 29.87% |
| Evidence source | Layout record |
| Declared progress / verified status | Listed/approved; no completion evidence supplied. |
| Facility | Utility land |
|---|---|
| Description / size | 0 Acer 1.9 Gts 230 Sq. Yds; approval states 1.06% |
| Evidence source | Layout record |
| Declared progress / verified status | Reserved in tentative layout; no completion evidence supplied. |
7. Utilities, building services & safety
The tentative-layout approval specifies development works including black-top road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical lines and street lighting, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval-stated development requirements; the supplied evidence does not verify their installation, capacity or operation.
| Evidence in the record | Assured water-supply source, internal pipelines, overhead tank; water reservoir is listed among utilities. |
|---|---|
| Status limitation | No source details, storage capacity or completion evidence supplied. |
| Evidence in the record | Underground drainage, common septic tank/STP and storm-water drains are specified. |
|---|---|
| Status limitation | No capacity, treatment specification, reuse details or completion evidence supplied. |
| Evidence in the record | Electrical supply lines, street lights and transformer are specified. |
|---|---|
| Status limitation | No load, backup or completion evidence supplied. |
| Evidence in the record | Solid Waste Management is listed among the utilities. |
|---|---|
| Status limitation | No system details or completion evidence supplied. |
| Evidence in the record | Rainwater-harvesting pits are specified. |
|---|---|
| Status limitation | No quantity, capacity or completion evidence supplied. |
| Evidence in the record | No project-specific provisions or capacities are established in the supplied evidence. |
|---|---|
| Status limitation | Not established. RERA amenities |
8. Location, access & connectivity
The RERA-filed location is BESIDE SRILAXMI LAYOUT, near Saibaba Temple, in Mancherial village, Mancherial mandal, Mancherial district, PIN 504208. The filed site boundaries identify a road to the west and other land to the east and south; the north boundary is recorded as “APPROVED LAYOUT 64 BY 97.” RERA record RERA filing RERA filing
One supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 173.2 km. No other measured distances, public-transport details or approach-road descriptions are provided. Location record
9. Developer & development status
The TG-RERA certificate names Gone Shyam Sundar Rao as the registered promoter. The supplied corporate record gives GSTIN 36AAPHS5424K1ZL; the legal entity type is unknown, and a registered-office address or official contact details are not established in the supplied data. Corporate record
The Form B filing contains a promoter declaration about title, encumbrances, completion, project funds and audits; its completion undertaking is not legible enough to establish a usable date. The RERA project record separately states proposed completion as 11/10/2024 and completeness as 80%, without a supplied progress date or independent site verification. RERA record RERA filing
10. Approvals, official records & documents
| Identifier / date | P01200007049; issued 04/10/2023; valid to 11/10/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GSR CITY on Survey No. 11/1/2; certificate includes a separate-account condition. |
| Identifier / date | 0019/LO/3026/2022; dated 10/11/2022 |
|---|---|
| What the supplied record establishes | Approval document for a tentative 58-plot residential layout on Survey No. 11/1/2, issued by Mancherial Municipality/Municipal Corporation. |
| Identifier / date | 004240/LO/DTCP/3026/0025/2022 |
|---|---|
| What the supplied record establishes | Application number printed on the tentative layout approval. |
| Identifier / date | Document 329716; attested 26/5/23 as extracted |
|---|---|
| What the supplied record establishes | Form B affidavit-cum-declaration filed for the project; the supplied extraction identifies the declarant as an authorised signatory and records promoter assertions. |
| Identifier / date | Document 358000; statement No. 146387773; searched 01-01-1994 to 24-09-2023 |
|---|---|
| What the supplied record establishes | Filed encumbrance statement for Survey No. 11/1/2. |
| Identifier / date | 11243/2022, dated 24 June 2022 |
|---|---|
| What the supplied record establishes | Cited for the reserved mortgage plots in favour of Mancherial Municipality/Municipal Corporation. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No completion or occupancy certificate is established by the documents reviewed here. Document index |
1. Project at a glance
Project identity
Registered project name: GSR CITY
Project type: Plotted development / tentative residential layout
Phase or registered portion: Not identified as a separate phase in the supplied record; the registration and plan refer to the plotted project on Survey No. 11/1/2.
TG-RERA registration: P01200007049
Registration validity: 04/10/2023 to 11/10/2024; the certificate says one year, and the supplied record does not show an extension. This is registration validity, not a completion date.
Registered promoter: Gone Shyam Sundar Rao, as named on the registration certificate; entity type is not identified in the supplied record.
RERA status: The supplied certificate records registration. Current portal status is not established by the supplied evidence.
Land and geographic identity
Locality: BESIDE SRILAXMI LAYOUT
Revenue village: Mancherial Revenue Village
Mandal / district / PIN: Mancherial / Mancherial / 504208
Project survey number and subdivision: 11/1/2
Registered site extent: 18175.71 sq. m
Net / total area: 18175.71 sq. m net area and 18175.71 sq. m total area in the RERA land details.
Boundaries: East: OTHERS LAND; West: ROAD; North: APPROVED LAYOUT 64 BY 97; South: OTHERS LAND.
Development identity
Sanctioning authority: Mancherial Municipality/Municipal Corporation; the RERA filing identifies DTCP as the authority name.
Principal layout approval: Tentative Layout Plan No. 0019/LO/3026/2022, dated 10/11/2022; application No. 004240/LO/DTCP/3026/0025/2022.
Layout extent and plotted area: The approval drawing states 4 Acer 19.65 Gts 21739 Sq. Yds and identifies 58 No's plots.
Approved built-up area: 10335.03 sq. m is recorded in the RERA land/build-up details; a separate built-up-area breakdown is not supplied.
Buildings, floors and parking levels: Not applicable to the supplied plotted-layout plan; no building count, floor configuration or parking levels are recorded.
Unit counts: The tentative layout plan identifies 58 plots. The supplied RERA evidence does not provide a separate unit-inventory or booked/available count.
Offering and status
Offering: Plots in a proposed residential layout; RERA-filed plot sizes, unit inventory and booked/available counts are not provided in the supplied evidence.
Registration validity: 04/10/2023–11/10/2024; no extension is shown in the supplied certificate.
Completion date: The RERA record gives 11/10/2024 as the proposed completion date.
Construction / development stage: The supplied record gives 80% completeness, but does not specify the measurement date, activities completed, or whether this is independently verified.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The approval is for a tentative layout, not an occupancy certificate.
2. The project story
GSR CITY is registered as a plotted-development project in Mancherial village, Mancherial mandal and district, Telangana, on Survey No. 11/1/2. Its filed locality is BESIDE SRILAXMI LAYOUT. The RERA-filed land extent is 18175.71 sq. m.
The municipal approval document describes a tentative residential layout of 58 plots. Its area statement allocates land to plots, roads, a park/open space, social infrastructure and utilities. The approval places responsibility for developing the layout infrastructure on the applicant and specifies eventual handover of designated roads, open space and utility land to the Municipality by registered gift deed.
The RERA record reports 80% completeness, but the supplied information does not define that figure or provide independently verified site progress. The stated completion date is 11/10/2024; no occupancy or completion certificate is supplied. Registration was valid through 11/10/2024, a separate status from the project completion date.
3. Master plan, architecture & building design
The supplied approval is for a tentative plotted layout, not a building or apartment plan. It identifies 58 plots and the following land-use figures from the layout drawing:
| Layout component | Area as printed on approval | Share as printed |
|---|---|---|
| Plotted area | 2 Acer 22.16 Gts 12361 Sq. Yds | 56.86% |
| Road area | 1 Acer 13.67 Gts 6494 Sq. Yds | 29.87% |
| Open space (park) | 0 Acer 16.53 Gts 2000 Sq. Yds | 9.2% |
| Social infrastructure | 0 Acer 5.39 Gts 653 Sq. Yds | 3% |
| Utilities | 0 Acer 1.9 Gts 230 Sq. Yds | 1.06% |
| Mortgage area | 0 Acer 16.34 Gts 1977 Sq. Yds | 15.95% of plotted area |
The mortgage area is identified as Plots 45, 28–29 and 44, 30–36, in favour of Mancherial Municipality/Municipal Corporation under Mortgage Deed No. 11243/2022, dated 24 June 2022. The approval describes this mortgage as linked to development compliance and release of the final layout.
RERA-filed total and net land area are each 18175.71 sq. m; the approval separately prints its extent as 4 Acer 19.65 Gts 21739 Sq. Yds. No building footprint, residential floor configuration, building count, or building-level phase plan is supplied.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment configuration schedule. The approval drawing identifies 58 plots, but the supplied evidence does not establish plot-size bands, plot-by-plot dimensions, or booked and available counts.
| Offering | Plot count | Booked | Available | RERA-filed plot sizes |
|---|---|---|---|---|
| Plots | 58 | Not provided | Not provided | Not provided |
The two supplied drawing sheets are layout sheets, not floor plans with apartment units. No software-measured carpet-area or room measurements are available.
5. Parking & vehicle circulation
The supplied evidence does not state a parking-space count, parking allocation, or separate resident, visitor, accessible or two-wheeler provision. The approval provides for layout roads and states that roads are to be opened for access to neighbouring sites; it does not describe parking bays, driveway dimensions or pedestrian separation.
6. Amenities, recreation & open spaces
The approval and RERA amenity list identify proposed or listed layout infrastructure. The supplied progress percentages are 0 where shown; they do not establish that facilities are complete or independently inspected.
| Facility | Park / organized recreational open space |
|---|---|
| Description / size | 0 Acer 16.53 Gts 2000 Sq. Yds; approval states 9.2% |
| Declared progress / verified status | Listed/approved in tentative layout; no completion evidence supplied. |
| Facility | No specific sports facility identified |
|---|---|
| Description / size | Not provided |
| Declared progress / verified status | Not established. |
| Facility | Social infrastructure site |
|---|---|
| Description / size | 0 Acer 5.39 Gts 653 Sq. Yds; approval states 3% |
| Declared progress / verified status | Reserved in tentative layout; no specific building or completion evidence supplied. |
| Facility | Roads |
|---|---|
| Description / size | 1 Acer 13.67 Gts 6494 Sq. Yds; approval states 29.87% |
| Declared progress / verified status | Listed/approved; no completion evidence supplied. |
| Facility | Utility land |
|---|---|
| Description / size | 0 Acer 1.9 Gts 230 Sq. Yds; approval states 1.06% |
| Declared progress / verified status | Reserved in tentative layout; no completion evidence supplied. |
7. Utilities, building services & safety
The tentative-layout approval specifies development works including black-top road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical lines and street lighting, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval-stated development requirements; the supplied evidence does not verify their installation, capacity or operation.
| Evidence in the record | Assured water-supply source, internal pipelines, overhead tank; water reservoir is listed among utilities. |
|---|---|
| Status limitation | No source details, storage capacity or completion evidence supplied. |
| Evidence in the record | Underground drainage, common septic tank/STP and storm-water drains are specified. |
|---|---|
| Status limitation | No capacity, treatment specification, reuse details or completion evidence supplied. |
| Evidence in the record | Electrical supply lines, street lights and transformer are specified. |
|---|---|
| Status limitation | No load, backup or completion evidence supplied. |
| Evidence in the record | Solid Waste Management is listed among the utilities. |
|---|---|
| Status limitation | No system details or completion evidence supplied. |
| Evidence in the record | Rainwater-harvesting pits are specified. |
|---|---|
| Status limitation | No quantity, capacity or completion evidence supplied. |
| Evidence in the record | No project-specific provisions or capacities are established in the supplied evidence. |
|---|---|
| Status limitation | Not established. |
8. Location, access & connectivity
The RERA-filed location is BESIDE SRILAXMI LAYOUT, near Saibaba Temple, in Mancherial village, Mancherial mandal, Mancherial district, PIN 504208. The filed site boundaries identify a road to the west and other land to the east and south; the north boundary is recorded as “APPROVED LAYOUT 64 BY 97.”
One supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 173.2 km. No other measured distances, public-transport details or approach-road descriptions are provided.
9. Developer & development status
The TG-RERA certificate names Gone Shyam Sundar Rao as the registered promoter. The supplied corporate record gives GSTIN 36AAPHS5424K1ZL; the legal entity type is unknown, and a registered-office address or official contact details are not established in the supplied data.
The Form B filing contains a promoter declaration about title, encumbrances, completion, project funds and audits; its completion undertaking is not legible enough to establish a usable date. The RERA project record separately states proposed completion as 11/10/2024 and completeness as 80%, without a supplied progress date or independent site verification.
10. Approvals, official records & documents
| Identifier / date | P01200007049; issued 04/10/2023; valid to 11/10/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GSR CITY on Survey No. 11/1/2; certificate includes a separate-account condition. |
| Identifier / date | 0019/LO/3026/2022; dated 10/11/2022 |
|---|---|
| What the supplied record establishes | Approval document for a tentative 58-plot residential layout on Survey No. 11/1/2, issued by Mancherial Municipality/Municipal Corporation. |
| Identifier / date | 004240/LO/DTCP/3026/0025/2022 |
|---|---|
| What the supplied record establishes | Application number printed on the tentative layout approval. |
| Identifier / date | Document 329716; attested 26/5/23 as extracted |
|---|---|
| What the supplied record establishes | Form B affidavit-cum-declaration filed for the project; the supplied extraction identifies the declarant as an authorised signatory and records promoter assertions. |
| Identifier / date | Document 358000; statement No. 146387773; searched 01-01-1994 to 24-09-2023 |
|---|---|
| What the supplied record establishes | Filed encumbrance statement for Survey No. 11/1/2. |
| Identifier / date | 11243/2022, dated 24 June 2022 |
|---|---|
| What the supplied record establishes | Cited for the reserved mortgage plots in favour of Mancherial Municipality/Municipal Corporation. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No completion or occupancy certificate is established by the documents reviewed here. |
Frequently asked questions
Is GSR CITY registered with Telangana RERA?
Yes. GSR CITY is registered with the Telangana Real Estate Regulatory Authority as P01200007049; the registration status is New Project.
Who is the developer of GSR CITY?
The promoter named in the RERA registration is GONE.
Where is GSR CITY located?
GSR CITY is in BESIDE SRILAXMI LAYOUT, Mancherial, Telangana (504208).
When will GSR CITY be completed?
The promoter's proposed date of completion filed with RERA is 11/10/2024. This is the promoter's declaration, not a guarantee.