Evermark Pride
EVERMARK INFRA DEVELOPERS · Siddipet · RERA P01300008464
EVERMARK PRIDE is a plotted development at Medinipur, Kondapak Mandal, Siddipet District, developed by registered promoter Evermark Infra Developers. The filed site area is 20161.62 sq.mts, and the draft layout approval identifies 73 plots; no tower, block, floor configuration or plot configurations are stated. The project is registered under TG-RERA number P01300008464, with a proposed completion date of 13th June, 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | EVERMARK PRIDE RERA record |
| Project type | Plotted development RERA filing |
| Phase / registered portion | No phase designation is disclosed. The registered project is identified with Survey Nos. 233P, 234P and 235P. |
| TG-RERA registration | P01300008464 |
| Registration validity | The certificate states commencement on 10/07/2024 and ending on 13/06/2024; the dates are reproduced as printed, and the certificate also states “0 years.” No extension is recorded in the supplied evidence. |
| Registered promoter | Evermark Infra Developers |
| RERA status | The supplied Form C is a registration certificate. It requires quarterly updates through the completion date stated in Form B. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Medinipur (also rendered “Madinipur” in the layout approval) RERA record |
| Mandal | Kondapak RERA record |
| District | Siddipet RERA record |
| PIN | 507601 RERA record |
| Project survey numbers | 233P, 234P and 235P; the layout approval prints them as 233/P, 234/P and 235/P. |
| RERA-filed site area | Total area 20161.62 sq.mts; net area 20161.62 sq.mts; affected area recorded as 0 sq.mts. RERA filing |
| Boundaries in RERA filing | East: others land; west: others land; north: others land; south: existing 60 feet road. RERA filing |
| Layout approval area | Ac 4-39 Gts; 24113.10 Sq. Yds. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | DT&CP; the document describes a draft layout approval delegated to Madinipur Gram Panchayat. |
| Principal approval | Draft-TLP. No. 82/2022/HRO/H1, approved 13.06.2022; file reference Lr. Roc.No.670/2022/HRO/H1. Approvals record |
| Layout scale and land-use split in approval | (73) plots; plotted area Ac. 3-08; 15492.39 Sq Yds (64.25%); roads Ac. 1-11.0; 6196.71 Sq. Yds (25.74%); open space Ac. 0-20; 2426.00 Sc. Yds (10.00%). |
| Approved built-up area | RERA record lists 12353.61 sq.mts as approved built-up area. The supplied approval document is a draft technical layout pattern, not a building plan. RERA filing |
| Building / floor configuration | No sanctioned building count, floor configuration or parking levels are disclosed in the supplied project records. This is a plotted layout. |
| Mortgage area | RERA filing lists 2056.87 sq.mts. The draft layout approval identifies Plot Nos. 17 to 30, extent 2460.00 Sq. Yards, as plots to be mortgaged to the Gram Panchayat. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Registered offering | Plots in a layout; the draft approval identifies (73) plots. The supplied TG-RERA records do not provide a plot-wise inventory or RERA-filed plot-size schedule. |
| Booked / available counts | Not disclosed in the supplied project evidence. |
| Construction stage | No independently verified or RERA-filed construction-stage update is supplied. The draft layout approval requires the layout work to be completed within two years of approval. |
| Completion date | Form B declaration: 13th June, 2024. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the evidence concerns a plotted layout. Document index |
2. The project story
EVERMARK PRIDE is registered as a plotted development at Medinipur, Kondapak Mandal, Siddipet District. Its registered land identity is Survey Nos. 233P, 234P and 235P, and the filed site area is 20161.62 sq.mts. The DT&CP document describes a 73-plot draft layout, with land set aside for plots, roads and open space. RERA record RERA filing
The layout approval is a Draft Technical Layout Pattern and includes conditions for development and for transferring the roads and open space to the Gram Panchayat by registered gift deed. The approval also identifies plots to be mortgaged as security for completion of layout works. The document states that layout permission is not proof of land title.
The promoter declared a completion period ending 13th June, 2024. The supplied records do not establish the present stage of layout works or independently confirm completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a building project in the supplied approval material. The draft layout approval allocates 64.25% of its stated layout area to plots, 25.74% to roads and 10.00% to open space. It identifies a total of (73) plots.
The RERA filing lists an approved built-up area of 12353.61 sq.mts, but the supplied layout approval does not provide building plans, plot-by-plot dimensions, building footprints or a building configuration. No tower, block, floor, height, lift, stair or phase arrangement is established by the supplied drawings. RERA filing
The approval requires demarcation of plots and open space on the ground and specifies that Plot Nos. 17 to 30, measuring 2460.00 Sq. Yards, are to be mortgaged to the Gram Panchayat and are not for sale while mortgaged. The approval also requires roads and open space to be transferred by registered gift deed before release of the draft layout from the Gram Panchayat.
4. Homes, configurations & floor plans
The project is registered as plotted development. The approval describes (73) plots, but a RERA-filed plot-wise size schedule, booked and available inventory, and unit-level area details are not included in the supplied records. Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 73 in the draft layout approval | Not disclosed | Not disclosed | Plot-wise areas not disclosed | Not applicable | Not disclosed |
The supplied floor-plan record contains two drawings awaiting scan review and no software-measured areas. No apartment carpet-area or saleable-area measurements are available. Floor plans
5. Parking & vehicle circulation
The supplied project records do not specify parking counts, visitor or accessible parking, parking allocations, or a separate parking area. The draft layout approval provides for internal roads but does not describe vehicle entries, exits, driveways or pedestrian separation. Document index
6. Amenities, recreation & open spaces
The DT&CP draft layout approval lists layout-level development works. The RERA amenity record marks several infrastructure categories as available in the filing, but records 0% progress for every listed item; no independent completion verification is supplied. RERA amenities
| Facility | Open space |
|---|---|
| Description / size | Ac. 0-20 Gts; 2426.00 Sc. Yds (10.00%) |
| Evidence source | Draft layout approval |
| Declared progress / verified status | Approval identifies the provision; completion is not verified. |
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | No further size or capacity supplied |
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Marked available; recorded progress 0%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No size or specification supplied |
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | No availability value or progress beyond 0% is supplied. |
| Facility | Avenue plantation |
|---|---|
| Description / size | No quantity supplied |
| Evidence source | Draft layout approval |
| Declared progress / verified status | Required development work; completion not verified. |
The project approval also names site utilities and works; these are summarized under Utilities, building services & safety. Promotional amenities listed by third-party vendors are not treated here as RERA-filed or sanctioned facilities. Promoter website
7. Utilities, building services & safety
The draft layout approval lists the following proposed layout works: side drains; construction of drains and channelization of nalas; rainwater-harvesting pits; street lighting and electricity facilities; a sewerage-disposal system; and protected water supply. It also requires electrical lines passing through the site to be shifted to the roadside. These are approval conditions or specified works, not evidence that they have been completed.
| Evidence in supplied records | Protected water supply is listed in the layout approval; the RERA amenity record includes water supply. No source, storage or capacity is specified. RERA amenities |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Sewerage-disposal system, side drains, drains and nala channelization are listed in the approval; the RERA amenity record lists sewerage and storm-water drains. No treatment capacity or reuse details are supplied. RERA amenities |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Rainwater-harvesting pits are listed in the approval; the RERA amenity record lists water conservation and rainwater harvesting. RERA amenities |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Street lighting and electricity facilities are listed in the approval; RERA also lists an electrical meter room/sub-station/receiving station category. No capacity or installation status is supplied. RERA amenities |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | RERA lists fire protection and fire-safety requirements, but no system specifications or project-specific completion evidence are supplied. RERA amenities |
|---|---|
| Status | Not established beyond the filed category. |
| Evidence in supplied records | RERA lists solid-waste management and disposal; no method or capacity is specified. RERA amenities |
|---|---|
| Status | Not established beyond the filed category. |
| Evidence in supplied records | No project-specific accessibility or security-system details are established by the supplied RERA and approval records. Document index |
|---|---|
| Status | Not disclosed. |
8. Location, access & connectivity
The registered location is Medinipur, Kondapak Mandal, Siddipet District, PIN 507601. The layout approval identifies Madinipur Gram Panchayat, and the RERA-filed southern boundary is an existing 60 feet road. RERA record RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 46.1 km. This is a sampled location reference, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is Evermark Infra Developers, recorded as a partnership. The partnership deed identifies Vijaya Bhaskar Reddy Alle, Jangiti Kaliki Muthyam and Kallam Lakshma Reddy as partners. The supplied evidence does not provide a verified corporate identifier for the partnership. Corporate record
The registration certificate gives the promoter’s registered office as Village: SR NAGAR, Mandal: AMEERPET, District: Hyderabad, Pin: 500038.
The promoter’s Form B affidavit, made by authorised signatory Alle Vijaya Bhaskar Reddy on 27* April, 2024 at Hyderabad, declares a completion period ending 13th June, 2024. No project-stage update or independent site verification is supplied here.
10. Approvals, official records & documents
| Reference / scope | P01300008464; EVERMARK PRIDE |
|---|---|
| What the supplied record establishes | Form C registration certificate naming Evermark Infra Developers as promoter and identifying the project and survey numbers. |
| Reference / scope | DT&CP; Draft-TLP. No. 82/2022/HRO/H1, dated 13.06.2022; file Lr. Roc.No.670/2022/HRO/H1 |
|---|---|
| What the supplied record establishes | Draft Technical Layout Pattern for a 73-plot layout, with conditions for layout development, roads, open space and mortgage of specified plots. |
| Reference / scope | 27* April, 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration identifying the project and stating the completion period and fund-management undertakings. |
| Reference / scope | RERA filing lists a layout-plan document, but the supplied record is not extracted. Document index |
|---|---|
| What the supplied record establishes | The plan’s detailed contents are not available in the supplied evidence. |
| Reference / scope | Not supplied Document index |
|---|---|
| What the supplied record establishes | No certificate or completion status is established by this evidence. |
1. Project at a glance
Project identity
Registered project name: EVERMARK PRIDE
Project type: Plotted development
Phase / registered portion: No phase designation is disclosed. The registered project is identified with Survey Nos. 233P, 234P and 235P.
TG-RERA registration: P01300008464
Registration validity: The certificate states commencement on 10/07/2024 and ending on 13/06/2024; the dates are reproduced as printed, and the certificate also states “0 years.” No extension is recorded in the supplied evidence.
Registered promoter: Evermark Infra Developers
RERA status: The supplied Form C is a registration certificate. It requires quarterly updates through the completion date stated in Form B.
Land and geographic identity
Locality / revenue village: Medinipur (also rendered “Madinipur” in the layout approval)
Mandal: Kondapak
District: Siddipet
PIN: 507601
Project survey numbers: 233P, 234P and 235P; the layout approval prints them as 233/P, 234/P and 235/P.
RERA-filed site area: Total area 20161.62 sq.mts; net area 20161.62 sq.mts; affected area recorded as 0 sq.mts.
Boundaries in RERA filing: East: others land; west: others land; north: others land; south: existing 60 feet road.
Layout approval area: Ac 4-39 Gts; 24113.10 Sq. Yds.
Development identity
Sanctioning authority: DT&CP; the document describes a draft layout approval delegated to Madinipur Gram Panchayat.
Principal approval: Draft-TLP. No. 82/2022/HRO/H1, approved 13.06.2022; file reference Lr. Roc.No.670/2022/HRO/H1.
Layout scale and land-use split in approval: (73) plots; plotted area Ac. 3-08; 15492.39 Sq Yds (64.25%); roads Ac. 1-11.0; 6196.71 Sq. Yds (25.74%); open space Ac. 0-20; 2426.00 Sc. Yds (10.00%).
Approved built-up area: RERA record lists 12353.61 sq.mts as approved built-up area. The supplied approval document is a draft technical layout pattern, not a building plan.
Building / floor configuration: No sanctioned building count, floor configuration or parking levels are disclosed in the supplied project records. This is a plotted layout.
Mortgage area: RERA filing lists 2056.87 sq.mts. The draft layout approval identifies Plot Nos. 17 to 30, extent 2460.00 Sq. Yards, as plots to be mortgaged to the Gram Panchayat.
Offering and status
Registered offering: Plots in a layout; the draft approval identifies (73) plots. The supplied TG-RERA records do not provide a plot-wise inventory or RERA-filed plot-size schedule.
Booked / available counts: Not disclosed in the supplied project evidence.
Construction stage: No independently verified or RERA-filed construction-stage update is supplied. The draft layout approval requires the layout work to be completed within two years of approval.
Completion date: Form B declaration: 13th June, 2024.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the evidence concerns a plotted layout.
2. The project story
EVERMARK PRIDE is registered as a plotted development at Medinipur, Kondapak Mandal, Siddipet District. Its registered land identity is Survey Nos. 233P, 234P and 235P, and the filed site area is 20161.62 sq.mts. The DT&CP document describes a 73-plot draft layout, with land set aside for plots, roads and open space.
The layout approval is a Draft Technical Layout Pattern and includes conditions for development and for transferring the roads and open space to the Gram Panchayat by registered gift deed. The approval also identifies plots to be mortgaged as security for completion of layout works. The document states that layout permission is not proof of land title.
The promoter declared a completion period ending 13th June, 2024. The supplied records do not establish the present stage of layout works or independently confirm completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a building project in the supplied approval material. The draft layout approval allocates 64.25% of its stated layout area to plots, 25.74% to roads and 10.00% to open space. It identifies a total of (73) plots.
The RERA filing lists an approved built-up area of 12353.61 sq.mts, but the supplied layout approval does not provide building plans, plot-by-plot dimensions, building footprints or a building configuration. No tower, block, floor, height, lift, stair or phase arrangement is established by the supplied drawings.
The approval requires demarcation of plots and open space on the ground and specifies that Plot Nos. 17 to 30, measuring 2460.00 Sq. Yards, are to be mortgaged to the Gram Panchayat and are not for sale while mortgaged. The approval also requires roads and open space to be transferred by registered gift deed before release of the draft layout from the Gram Panchayat.
4. Homes, configurations & floor plans
The project is registered as plotted development. The approval describes (73) plots, but a RERA-filed plot-wise size schedule, booked and available inventory, and unit-level area details are not included in the supplied records.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 73 in the draft layout approval | Not disclosed | Not disclosed | Plot-wise areas not disclosed | Not applicable | Not disclosed |
The supplied floor-plan record contains two drawings awaiting scan review and no software-measured areas. No apartment carpet-area or saleable-area measurements are available.
5. Parking & vehicle circulation
The supplied project records do not specify parking counts, visitor or accessible parking, parking allocations, or a separate parking area. The draft layout approval provides for internal roads but does not describe vehicle entries, exits, driveways or pedestrian separation.
6. Amenities, recreation & open spaces
The DT&CP draft layout approval lists layout-level development works. The RERA amenity record marks several infrastructure categories as available in the filing, but records 0% progress for every listed item; no independent completion verification is supplied.
| Facility | Open space |
|---|---|
| Description / size | Ac. 0-20 Gts; 2426.00 Sc. Yds (10.00%) |
| Evidence source | Draft layout approval |
| Declared progress / verified status | Approval identifies the provision; completion is not verified. |
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | No further size or capacity supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | Marked available; recorded progress 0%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No size or specification supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | No availability value or progress beyond 0% is supplied. |
| Facility | Avenue plantation |
|---|---|
| Description / size | No quantity supplied |
| Evidence source | Draft layout approval |
| Declared progress / verified status | Required development work; completion not verified. |
The project approval also names site utilities and works; these are summarized under Utilities, building services & safety. Promotional amenities listed by third-party vendors are not treated here as RERA-filed or sanctioned facilities.
7. Utilities, building services & safety
The draft layout approval lists the following proposed layout works: side drains; construction of drains and channelization of nalas; rainwater-harvesting pits; street lighting and electricity facilities; a sewerage-disposal system; and protected water supply. It also requires electrical lines passing through the site to be shifted to the roadside. These are approval conditions or specified works, not evidence that they have been completed.
| Evidence in supplied records | Protected water supply is listed in the layout approval; the RERA amenity record includes water supply. No source, storage or capacity is specified. |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Sewerage-disposal system, side drains, drains and nala channelization are listed in the approval; the RERA amenity record lists sewerage and storm-water drains. No treatment capacity or reuse details are supplied. |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Rainwater-harvesting pits are listed in the approval; the RERA amenity record lists water conservation and rainwater harvesting. |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | Street lighting and electricity facilities are listed in the approval; RERA also lists an electrical meter room/sub-station/receiving station category. No capacity or installation status is supplied. |
|---|---|
| Status | Proposed / filed; completion not verified. |
| Evidence in supplied records | RERA lists fire protection and fire-safety requirements, but no system specifications or project-specific completion evidence are supplied. |
|---|---|
| Status | Not established beyond the filed category. |
| Evidence in supplied records | RERA lists solid-waste management and disposal; no method or capacity is specified. |
|---|---|
| Status | Not established beyond the filed category. |
| Evidence in supplied records | No project-specific accessibility or security-system details are established by the supplied RERA and approval records. |
|---|---|
| Status | Not disclosed. |
8. Location, access & connectivity
The registered location is Medinipur, Kondapak Mandal, Siddipet District, PIN 507601. The layout approval identifies Madinipur Gram Panchayat, and the RERA-filed southern boundary is an existing 60 feet road.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 46.1 km. This is a sampled location reference, not a travel-time estimate.
9. Developer & development status
The registered promoter is Evermark Infra Developers, recorded as a partnership. The partnership deed identifies Vijaya Bhaskar Reddy Alle, Jangiti Kaliki Muthyam and Kallam Lakshma Reddy as partners. The supplied evidence does not provide a verified corporate identifier for the partnership.
The registration certificate gives the promoter’s registered office as Village: SR NAGAR, Mandal: AMEERPET, District: Hyderabad, Pin: 500038.
The promoter’s Form B affidavit, made by authorised signatory Alle Vijaya Bhaskar Reddy on 27* April, 2024 at Hyderabad, declares a completion period ending 13th June, 2024. No project-stage update or independent site verification is supplied here.
10. Approvals, official records & documents
| Reference / scope | P01300008464; EVERMARK PRIDE |
|---|---|
| What the supplied record establishes | Form C registration certificate naming Evermark Infra Developers as promoter and identifying the project and survey numbers. |
| Reference / scope | DT&CP; Draft-TLP. No. 82/2022/HRO/H1, dated 13.06.2022; file Lr. Roc.No.670/2022/HRO/H1 |
|---|---|
| What the supplied record establishes | Draft Technical Layout Pattern for a 73-plot layout, with conditions for layout development, roads, open space and mortgage of specified plots. |
| Reference / scope | 27* April, 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration identifying the project and stating the completion period and fund-management undertakings. |
| Reference / scope | RERA filing lists a layout-plan document, but the supplied record is not extracted. |
|---|---|
| What the supplied record establishes | The plan’s detailed contents are not available in the supplied evidence. |
| Reference / scope | Not supplied |
|---|---|
| What the supplied record establishes | No certificate or completion status is established by this evidence. |
Frequently asked questions
Is EVERMARK PRIDE registered with Telangana RERA?
Yes. EVERMARK PRIDE is registered with the Telangana Real Estate Regulatory Authority as P01300008464; the registration status is New Project.
Who is the developer of EVERMARK PRIDE?
The promoter named in the RERA registration is EVERMARK INFRA DEVELOPERS.
Where is EVERMARK PRIDE located?
EVERMARK PRIDE is in Medinipur, KONDAPAK, Siddipet, Telangana (507601).
When will EVERMARK PRIDE be completed?
The promoter's proposed date of completion filed with RERA is 13/06/2024. This is the promoter's declaration, not a guarantee.