Dream Valley
SUNRISE INFRA PROJECTS · Rangareddy · RERA P02400008271
DREAM VALLEY is a plotted development at Vityala, Farooqnagar Mandal, Ranga Reddy District, being developed by registered promoter SUNRISE INFRA PROJECTS. The DTCP draft-layout document describes 66 plots on **Ac.7-14 Guntas or Ac.7.35 Cents; 35,574.00 Sq. Yds.** TG-RERA registration number **P02400008271** lists proposed completion as **13/05/2024**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | DREAM VALLEY RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Not identified as a numbered phase. The RERA record identifies land in Survey No. 124/P; the DTCP document describes a draft layout for that survey. RERA record |
| TG-RERA registration number | P02400008271 RERA record |
| Registration validity | Form C states commencement 24/05/2024 and expiry 13/05/2024; it also states “0 years.” These are the certificate’s recorded dates, not a completion deadline. Extension status is not supplied. |
| Registered promoter | SUNRISE INFRA PROJECTS RERA record |
| RERA status | Listed as On-Going Project in the project record. RERA record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Vityala; the approval document spells the village Vittyal and identifies Vittyal Gram Panchayat. RERA record RERA filing |
| Mandal | Farooqnagar RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 509202 RERA record RERA filing |
| Project survey number / subdivision | 124/P (also written Sy.No. 124/P in the approval). RERA record Land records |
| RERA-filed site area | 29,744.39 sq. m total and net area; affected area is recorded as 0. RERA filing |
| Draft-layout area | Ac.7-14 Guntas or Ac.7.35 Cents; 35,574.00 Sq. Yds. |
| Boundaries filed with RERA | East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: PROPOSED 40 FEET WIDE ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority shown in project record | DTCP RERA filing |
| Principal layout instrument | Draft Technical Layout Pattern – Approved – Reg., Draft-TLP.No.181/2022/H, dated 13-05-2022; file Lr.Roc.No.12313/331/2022le-Panchayat; application 12313/331. The document states that the draft layout requires release/approval by the Gram Panchayat to be legally valid. Approvals record |
| Approved built-up area | 16,851.11 sq. m is entered in the RERA project data; no building design or built-up-area breakdown is supplied for this plotted development. RERA filing |
| Building / floor configuration | Not disclosed; the approval describes a 66-plot layout, not a multi-storey building scheme. |
| Parking provision | No project-specific sanctioned parking count or parking layout details supplied. |
| RERA-declared count | 66 plots are described in the DTCP draft-layout document; a separately reconciled RERA inventory count is not supplied. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Plots; the RERA record classifies the project as a plotted development. RERA record RERA filing |
| Plot size range | No RERA-filed plot-size range supplied. |
| Booked / available counts | Not supplied in the provided project data. |
| Construction / development stage | Project is listed as On-Going Project. The supplied records do not include an independently verified site-progress assessment. RERA record RERA filing |
| Original / revised completion deadline | 13/05/2024 / 13/05/2024 in the RERA project record; the Form-B promoter declaration also undertakes completion by 13 May, 2024. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval refers to completion of layout development works and release of the final layout. |
2. The project story
DREAM VALLEY is registered as a plotted development at Vityala, Farooqnagar, Ranga Reddy, on Survey No. 124/P. The RERA record identifies the project under registration P02400008271. The DTCP document describes a draft layout for 66 plots on a stated layout area of Ac.7-14 Guntas or Ac.7.35 Cents; 35,574.00 Sq. Yds. RERA record
The draft plan allocates land to plotted area, roads, open space and a set of plots to be mortgaged to the Gram Panchayat. Its conditions call for development works and release of the final layout; the supplied records do not establish that those steps have been completed. The registration record lists completion as 13/05/2024, while no project-specific verified progress report or completion/occupancy certificate is included here. RERA record Document index
3. Master plan, architecture & building design
The available design evidence is a draft plotted-layout approval, not a building or apartment plan. It describes 66 plots and gives the following land-use figures for the draft layout:
| Draft-layout component | Area / share stated in document |
|---|---|
| Layout area | Ac. 7.35 Cents; 35,574.00 Sq. Yds. |
| Plotted area | Ac. 4.164 Cents; 20,153.76 Sq. Yds; 56.66% |
| Road area | Ac. 2.451 Cents; 11,862.84 Sq. Yds; 33.34% |
| Open space | Ac. 0.735 Cents; 3,557.40 Sq. Yds; 10.00% |
| Mortgage area, Plot Nos. 40 to 50 | Ac. 0.648 Cents; 3,136.32 Sq. Yds; 15.56% |
The approval conditions state that the open-space and road areas are to be handed over to the Gram Panchayat by registered gift deed before release of the final layout. The mortgage plots are described as security for completion of development works and are not for sale while under mortgage.
No building footprint, floor configuration, tower arrangement, dwelling-unit layout, or apartment/common-area distribution is documented. The RERA-filed approved built-up-area entry is 16,851.11 sq. m, but the supplied records do not explain its calculation or identify a corresponding building scheme. RERA filing
4. Homes, configurations & floor plans
The registered offering is plotted land, not apartments. The draft-layout document states 66 plots, but the supplied records do not provide plot-by-plot dimensions, plot-size bands, booking counts, availability counts, or an inventory schedule. RERA record
The two supplied drawing records are marked as not yet measured: 2 total, 0 measured, and 2 scans pending. They do not support plot measurements or dwelling-floor-plan descriptions. Floor plans
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking allocation, parking layout, or unit-specific parking allocation is established in the supplied project records. The draft layout identifies a road area and requires roads to be opened for access to neighbouring sites; it does not provide a detailed vehicle-circulation or parking plan in the supplied extract.
6. Amenities, recreation & open spaces
The RERA-filed amenity schedule records the following items and percentages. These are recorded progress entries; no independent site verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Not further sized | RERA amenity schedule | YES; 100% declared; not independently verified |
| Water Supply | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Green Strip/TOT LOT/Park | Not further sized | RERA amenity schedule | YES; 100% declared; not independently verified |
| Water Conservation, Rain water Harvesting | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Storm Water Drains | Not further described | RERA amenity schedule | 0% recorded |
| Street Lighting | Not further described | RERA amenity schedule | 0% recorded |
| Community Buildings | Not further described | RERA amenity schedule | 0% recorded |
| Treatment And Disposal Of Sewage And Sullage Water | Not further described | RERA amenity schedule | 0% recorded |
| Solid Waste Management And Disposal | Not further described | RERA amenity schedule | 0% recorded |
| Energy management | Not further described | RERA amenity schedule | 0% recorded |
| Fire Protection And Fire Safety Requirements | Not further described | RERA amenity schedule | 0% recorded |
| Aggregate area of recreational Open Space | Not further described in this schedule | RERA amenity schedule | 0% recorded; draft approval separately allocates open space of Ac.0.735 cents (10.00%) |
The draft-layout approval also conditions development on greenery and avenue planting, fencing of open spaces, and rainwater-harvesting pits. These are approval conditions, not evidence of completed facilities.
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage infrastructure (including chambers, lines, septic tank and STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES; 100%. It also records storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management and fire protection/safety at 0%. These are project-filed status entries and are not independently verified in the supplied evidence. RERA amenities
The draft-layout conditions require protected water supply, a sewerage-disposal system, drains and nala channelization for storm-water runoff, street lighting, electricity facilities and rainwater-harvesting pits. They do not specify capacities or establish installation and operation.
No supported details are supplied for water source or storage capacity, wastewater reuse, electrical backup, EV charging, CCTV, access control, or accessibility facilities. The approval’s fire-safety entry in the RERA schedule is 0%; no separate fire-clearance document is supplied. RERA amenities Document index
8. Location, access & connectivity
The registered location is Vityala, Farooqnagar, Ranga Reddy, 509202. The project record gives the southern boundary as a PROPOSED 40 FEET WIDE ROAD; the draft-layout conditions state that roads are to be opened for access to neighbouring sites. RERA record RERA filing
A cadastral parcel centroid is recorded at 17.01843, 78.15071. The nearest sampled Outer Ring Road interchange is listed at 37.9 km (approx.); this is a supplied mapped distance, not a travel-time estimate. Cadastral map Location record
9. Developer & development status
The registered promoter is SUNRISE INFRA PROJECTS. The RERA organization record identifies it as a partnership and lists ANJI REDDY PAMMI as Authorized Signatory and RAVI KIRAN REDDY GONTU as Partner. The project record lists GSTIN 36AEJFS4270H1ZT. RERA record Corporate record Parties record
The registration certificate gives the promoter address as Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500085. The project data separately records the promoter address as 1-65/548, Flat No 402, Apurupa Iris, Kakatiya Hills, Road No 11, and also lists Vityala as locality; the supplied materials do not establish an official project contact number, email or website. RERA filing
The RERA record and promoter Form-B declaration state completion by 13/05/2024. The Form-B declaration, dated 07* May, 2024, also declares that the land is free from encumbrances and undertakes project-related obligations. These are promoter declarations; the supplied evidence does not include independently verified completion progress or a completion certificate. RERA record Document index
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400008271 |
|---|---|
| What it establishes | Registration certificate for DREAM VALLEY, identifying Sunrise Infra Projects, project location and 124/P. |
| Supplied evidence | Draft-TLP.No.181/2022/H, dated 13-05-2022; file Lr.Roc.No.12313/331/2022le-Panchayat; application 12313/331 |
|---|---|
| What it establishes | DTCP letter approving a draft technical layout pattern for a 66-plot layout, with conditions for Gram Panchayat mortgage, development works and final layout release. |
| Supplied evidence | Approval no. 181/2022/H; file C.No. 12313 / 331 / 2022 / E.P.. |
|---|---|
| What it establishes | The filed layout-approval record states that the layout is legally valid only on release/approval by the concerned Gram Panchayat under Section 113(b) Telangana. |
| Supplied evidence | Form-B affidavit-cum-declaration dated 07* May, 2024 |
|---|---|
| What it establishes | Promoter’s title, encumbrance, completion and project-fund declarations. |
| Supplied evidence | Deed/title documents and advocate’s title-search report are included in the project file Document index |
|---|---|
| What it establishes | Project file includes title materials; their detailed title-chain review is outside this overview. |
| Supplied evidence | Not supplied Document index |
|---|---|
| What it establishes | No completion or occupancy certificate is established by the provided documents. |
1. Project at a glance
Project identity
Registered project name: DREAM VALLEY
Project type: Plotted development
Phase / registered portion: Not identified as a numbered phase. The RERA record identifies land in Survey No. 124/P; the DTCP document describes a draft layout for that survey.
TG-RERA registration number: P02400008271
Registration validity: Form C states commencement 24/05/2024 and expiry 13/05/2024; it also states “0 years.” These are the certificate’s recorded dates, not a completion deadline. Extension status is not supplied.
Registered promoter: SUNRISE INFRA PROJECTS
RERA status: Listed as On-Going Project in the project record.
Land and geographic identity
Locality / revenue village: Vityala; the approval document spells the village Vittyal and identifies Vittyal Gram Panchayat.
Mandal: Farooqnagar
District: Ranga Reddy
PIN: 509202
Project survey number / subdivision: 124/P (also written Sy.No. 124/P in the approval).
RERA-filed site area: 29,744.39 sq. m total and net area; affected area is recorded as 0.
Draft-layout area: Ac.7-14 Guntas or Ac.7.35 Cents; 35,574.00 Sq. Yds.
Boundaries filed with RERA: East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: PROPOSED 40 FEET WIDE ROAD.
Development identity
Sanctioning authority shown in project record: DTCP
Principal layout instrument: Draft Technical Layout Pattern – Approved – Reg., Draft-TLP.No.181/2022/H, dated 13-05-2022; file Lr.Roc.No.12313/331/2022le-Panchayat; application 12313/331. The document states that the draft layout requires release/approval by the Gram Panchayat to be legally valid.
Approved built-up area: 16,851.11 sq. m is entered in the RERA project data; no building design or built-up-area breakdown is supplied for this plotted development.
Building / floor configuration: Not disclosed; the approval describes a 66-plot layout, not a multi-storey building scheme.
Parking provision: No project-specific sanctioned parking count or parking layout details supplied.
RERA-declared count: 66 plots are described in the DTCP draft-layout document; a separately reconciled RERA inventory count is not supplied.
Offering and status
Unit type: Plots; the RERA record classifies the project as a plotted development.
Plot size range: No RERA-filed plot-size range supplied.
Booked / available counts: Not supplied in the provided project data.
Construction / development stage: Project is listed as On-Going Project. The supplied records do not include an independently verified site-progress assessment.
Original / revised completion deadline: 13/05/2024 / 13/05/2024 in the RERA project record; the Form-B promoter declaration also undertakes completion by 13 May, 2024.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval refers to completion of layout development works and release of the final layout.
2. The project story
DREAM VALLEY is registered as a plotted development at Vityala, Farooqnagar, Ranga Reddy, on Survey No. 124/P. The RERA record identifies the project under registration P02400008271. The DTCP document describes a draft layout for 66 plots on a stated layout area of Ac.7-14 Guntas or Ac.7.35 Cents; 35,574.00 Sq. Yds.
The draft plan allocates land to plotted area, roads, open space and a set of plots to be mortgaged to the Gram Panchayat. Its conditions call for development works and release of the final layout; the supplied records do not establish that those steps have been completed. The registration record lists completion as 13/05/2024, while no project-specific verified progress report or completion/occupancy certificate is included here.
3. Master plan, architecture & building design
The available design evidence is a draft plotted-layout approval, not a building or apartment plan. It describes 66 plots and gives the following land-use figures for the draft layout:
Layout area: Ac. 7.35 Cents; 35,574.00 Sq. Yds.
Plotted area: Ac. 4.164 Cents; 20,153.76 Sq. Yds; 56.66%
Road area: Ac. 2.451 Cents; 11,862.84 Sq. Yds; 33.34%
Open space: Ac. 0.735 Cents; 3,557.40 Sq. Yds; 10.00%
Mortgage area, Plot Nos. 40 to 50: Ac. 0.648 Cents; 3,136.32 Sq. Yds; 15.56%
The approval conditions state that the open-space and road areas are to be handed over to the Gram Panchayat by registered gift deed before release of the final layout. The mortgage plots are described as security for completion of development works and are not for sale while under mortgage.
No building footprint, floor configuration, tower arrangement, dwelling-unit layout, or apartment/common-area distribution is documented. The RERA-filed approved built-up-area entry is 16,851.11 sq. m, but the supplied records do not explain its calculation or identify a corresponding building scheme.
4. Homes, configurations & floor plans
The registered offering is plotted land, not apartments. The draft-layout document states 66 plots, but the supplied records do not provide plot-by-plot dimensions, plot-size bands, booking counts, availability counts, or an inventory schedule.
The two supplied drawing records are marked as not yet measured: 2 total, 0 measured, and 2 scans pending. They do not support plot measurements or dwelling-floor-plan descriptions.
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking allocation, parking layout, or unit-specific parking allocation is established in the supplied project records. The draft layout identifies a road area and requires roads to be opened for access to neighbouring sites; it does not provide a detailed vehicle-circulation or parking plan in the supplied extract.
6. Amenities, recreation & open spaces
The RERA-filed amenity schedule records the following items and percentages. These are recorded progress entries; no independent site verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Not further sized | RERA amenity schedule | YES; 100% declared; not independently verified |
| Water Supply | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Green Strip/TOT LOT/Park | Not further sized | RERA amenity schedule | YES; 100% declared; not independently verified |
| Water Conservation, Rain water Harvesting | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Not further described | RERA amenity schedule | YES; 100% declared; not independently verified |
| Storm Water Drains | Not further described | RERA amenity schedule | 0% recorded |
| Street Lighting | Not further described | RERA amenity schedule | 0% recorded |
| Community Buildings | Not further described | RERA amenity schedule | 0% recorded |
| Treatment And Disposal Of Sewage And Sullage Water | Not further described | RERA amenity schedule | 0% recorded |
| Solid Waste Management And Disposal | Not further described | RERA amenity schedule | 0% recorded |
| Energy management | Not further described | RERA amenity schedule | 0% recorded |
| Fire Protection And Fire Safety Requirements | Not further described | RERA amenity schedule | 0% recorded |
| Aggregate area of recreational Open Space | Not further described in this schedule | RERA amenity schedule | 0% recorded; draft approval separately allocates open space of Ac.0.735 cents (10.00%) |
The draft-layout approval also conditions development on greenery and avenue planting, fencing of open spaces, and rainwater-harvesting pits. These are approval conditions, not evidence of completed facilities.
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage infrastructure (including chambers, lines, septic tank and STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES; 100%. It also records storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management and fire protection/safety at 0%. These are project-filed status entries and are not independently verified in the supplied evidence.
The draft-layout conditions require protected water supply, a sewerage-disposal system, drains and nala channelization for storm-water runoff, street lighting, electricity facilities and rainwater-harvesting pits. They do not specify capacities or establish installation and operation.
No supported details are supplied for water source or storage capacity, wastewater reuse, electrical backup, EV charging, CCTV, access control, or accessibility facilities. The approval’s fire-safety entry in the RERA schedule is 0%; no separate fire-clearance document is supplied.
8. Location, access & connectivity
The registered location is Vityala, Farooqnagar, Ranga Reddy, 509202. The project record gives the southern boundary as a PROPOSED 40 FEET WIDE ROAD; the draft-layout conditions state that roads are to be opened for access to neighbouring sites.
A cadastral parcel centroid is recorded at 17.01843, 78.15071. The nearest sampled Outer Ring Road interchange is listed at 37.9 km (approx.); this is a supplied mapped distance, not a travel-time estimate.
9. Developer & development status
The registered promoter is SUNRISE INFRA PROJECTS. The RERA organization record identifies it as a partnership and lists ANJI REDDY PAMMI as Authorized Signatory and RAVI KIRAN REDDY GONTU as Partner. The project record lists GSTIN 36AEJFS4270H1ZT.
The registration certificate gives the promoter address as Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500085. The project data separately records the promoter address as 1-65/548, Flat No 402, Apurupa Iris, Kakatiya Hills, Road No 11, and also lists Vityala as locality; the supplied materials do not establish an official project contact number, email or website.
The RERA record and promoter Form-B declaration state completion by 13/05/2024. The Form-B declaration, dated 07* May, 2024, also declares that the land is free from encumbrances and undertakes project-related obligations. These are promoter declarations; the supplied evidence does not include independently verified completion progress or a completion certificate.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400008271 |
|---|---|
| What it establishes | Registration certificate for DREAM VALLEY, identifying Sunrise Infra Projects, project location and 124/P. |
| Supplied evidence | Draft-TLP.No.181/2022/H, dated 13-05-2022; file Lr.Roc.No.12313/331/2022le-Panchayat; application 12313/331 |
|---|---|
| What it establishes | DTCP letter approving a draft technical layout pattern for a 66-plot layout, with conditions for Gram Panchayat mortgage, development works and final layout release. |
| Supplied evidence | Approval no. 181/2022/H; file C.No. 12313 / 331 / 2022 / E.P.. |
|---|---|
| What it establishes | The filed layout-approval record states that the layout is legally valid only on release/approval by the concerned Gram Panchayat under Section 113(b) Telangana. |
| Supplied evidence | Form-B affidavit-cum-declaration dated 07* May, 2024 |
|---|---|
| What it establishes | Promoter’s title, encumbrance, completion and project-fund declarations. |
| Supplied evidence | Deed/title documents and advocate’s title-search report are included in the project file |
|---|---|
| What it establishes | Project file includes title materials; their detailed title-chain review is outside this overview. |
| Supplied evidence | Not supplied |
|---|---|
| What it establishes | No completion or occupancy certificate is established by the provided documents. |
Frequently asked questions
Is DREAM VALLEY registered with Telangana RERA?
Yes. DREAM VALLEY is registered with the Telangana Real Estate Regulatory Authority as P02400008271; the registration status is On-Going Project.
Who is the developer of DREAM VALLEY?
The promoter named in the RERA registration is SUNRISE INFRA PROJECTS.
Where is DREAM VALLEY located?
DREAM VALLEY is in Vityala, Farooqnagar, Rangareddy, Telangana (509202).
When will DREAM VALLEY be completed?
The promoter's proposed date of completion filed with RERA is 13/05/2024. This is the promoter's declaration, not a guarantee.