Sign in

Amr Future City

AMR Infrastructures · Rangareddy · RERA P02400000583

AMR FUTURE CITY is a plotted development in Vityala, Farooqnagar mandal, Ranga Reddy district, beside USM MY CITY. It is being developed by registered promoter AMR Infrastructures. The filed site extent is 76889.63 sq. mts, with a net area of 52932.44 sq. mts; the supplied record does not state the number or sizes of plots, towers, blocks or floors. The project is registered under TG-RERA number P02400000583, and the promoter’s Form B undertaking states a proposed completion date of 31/01/2021.

More from AMR Infrastructures · 2 projects →

01What we found

Period endedTG-RERA registration ran to 31 Jan 2021 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Vityala, Farooqnagar, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered project nameAMR FUTURE CITY RERA record
Project typePlotted development RERA filing
Phase / registered portionPhase not identified in the supplied record; registered survey numbers are 134/P, 136/P and 137/P.
TG-RERA registrationP02400000583, granted under section 5; certificate issued 10/04/2019.
Registration validity10/04/2019 to 31/01/2021; the supplied certificate records no extension. Registration validity is separate from the completion undertaking and from any occupancy/completion certification.
Registered promoterAMR Infrastructures; the certificate spells the name “Amr Infrastructures.” RERA record
RERA project statusThe registration certificate is for a “New Project.” Current registration status is not established by the supplied certificate. RERA record RERA filing

Land and geographic identity

ItemProject record
LocalityBESIDE USM MY CITY; the registration certificate gives locality as Vityala. RERA record RERA filing
Revenue villageVityala. RERA record
Mandal / district / PINFarooqnagar / Ranga Reddy / 509202. RERA record
Project survey numbers134/P, 136/P and 137/P.
Site extent as filedTotal area: 76889.63 sq. mts; net area: 52932.44 sq. mts; area reported affected by road widening/FTL of tanks/nala widening: 23957.19 sq. mts. RERA filing
Registered plot referencePlot No. 233 appears on the registration certificate; the supplied evidence does not establish that this is an allottee’s sale plot.
Boundaries as filedEast: OTHERS LAND; West: APPROVED LAYOUT; North: OTHERS LAND; South: EXISTING ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityDTCP is listed as the authority. RERA filing Approvals record
Principal approval referenceDTCP file no. DTCP-HT3/2/2019-HYD; the supplied annexure also refers to Draft-TLP No. 25 / 2019/H. The annexure describes conditions and a process for proposals through the Gram Panchayat; it does not establish a completed layout sanction. Approvals record
Approved built-up area52932.44 sq. mts is entered as “Approved Built up Area” in the project fields; the supplied material does not establish a building or built-up-area programme for this plotted development. RERA filing
Building count, floors and parking levelsNot disclosed in the supplied project evidence.
Plot count, approved plot sizes and layout arrangementNot established by the supplied layout evidence.

Offering and status

ItemProject record
OfferingPlotted development. The RERA-filed record supplied here does not state plot counts, plot-size bands or a unit inventory. RERA filing
RERA booked / available countsNot provided in the supplied data.
Promoter-filed completion undertaking31/01/2021, stated in Form B.
Registration end date31/01/2021, as stated on the TG-RERA certificate.
Construction / development progressRERA amenity fields report percentages for selected layout works; these are declared progress figures, not independent site verification. RERA amenities
Occupancy / completion certificate statusNo occupancy or completion certificate is identified in the supplied evidence. No tower or phase scope can be established for an OC.

The project story

AMR FUTURE CITY is registered as a plotted development in Vityala village, Farooqnagar mandal, Ranga Reddy district, across the project’s filed survey numbers 134/P, 136/P and 137/P. Its RERA-filed land details state a total area of 76889.63 sq. mts, a net area of 52932.44 sq. mts and 23957.19 sq. mts affected by road widening/FTL of tanks/nala widening. RERA record RERA filing

The promoter’s Form B declaration undertakes completion by 31/01/2021, and the registration certificate records the same date as the registration end date. These are not evidence that the development was completed. The supplied evidence does not establish current site completion or an occupancy/completion certificate.

RERA fields report internal roads and footpaths at 30%, water supply, sewerage and storm-water drains at 10% each, and green strip/TOT LOT/park at 60%. These are filed progress declarations; no independent site verification is supplied. RERA amenities

Master plan, architecture & building design

This is a plotted scheme, so the relevant plan information is the site layout and its plot, road, open-space and utility organization—not apartment-floor configuration. The supplied evidence does not include a legible, approved layout drawing or a verified plot schedule. The annexure under DTCP file no. DTCP-HT3/2/2019-HYD describes conditions for layout development and later proposals through the Gram Panchayat; it also states that future development requires prior approval of the competent authority.

The filed land figures are total site area 76889.63 sq. mts, net area 52932.44 sq. mts, and affected area 23957.19 sq. mts. The project fields separately label 52932.44 sq. mts as approved built-up area; the supplied evidence does not explain or substantiate a building design associated with that entry. RERA filing RERA filing

Building footprints, building and block counts, floor configuration, internal road dimensions, plot arrangement, parks/open-space areas and utility-land allocation are not established by the supplied drawings or layout records. The two floor-plan drawings supplied are scans pending measurement and do not provide a basis here to describe homes or building design. Floor plans

Homes, configurations & floor plans

This project is registered as a plotted development. The supplied RERA data does not provide plot counts, plot-size bands, booked or available inventory, or RERA-filed saleable areas. RERA filing

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied
  • The promoter’s vendor record lists “Corner Plots,” “East Facing Plots” and “Open Plots” as configurations, but supplies no plot counts or dimensions; these are promoter-marketed labels, not a RERA-filed inventory schedule. Promoter website
  • Two floor-plan scans are pending measurement, and no software-measured carpet-area results are supplied. Floor plans

Parking & vehicle circulation

  • The supplied evidence does not establish sanctioned parking counts, visitor parking, accessible parking, parking areas, parking allocation to individual plots, or vehicle-entry and circulation arrangements. The project fields list a “Mortgage Area” of 6839 sq. mts, which is not identified as parking. RERA filing
  • The DTCP annexure refers to an area under mortgage in connection with building-permission conditions; it does not establish parking provision or plot-level parking rights.

Amenities, recreation & open spaces

The following percentages are RERA-filed progress figures. They are not independent confirmation that work is complete or that facilities are operational. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenity record RERA amenities30% declared; not independently verified
Water SupplyDetails and capacity not statedRERA amenity record RERA amenities10% declared; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Details and capacity not statedRERA amenity record RERA amenities10% declared; not independently verified
Storm Water DrainsDetails and capacity not statedRERA amenity record RERA amenities10% declared; not independently verified
Green Strip/TOT LOT/ParkArea and facility details not statedRERA amenity record RERA amenities60% declared; not independently verified
Street LightingDetails not statedRERA amenity record RERA amenities0% declared
Community BuildingsDetails and size not statedRERA amenity record RERA amenities0% declared
Treatment and Disposal of Sewage and Sullage WaterDetails and capacity not statedRERA amenity record RERA amenities0% declared
Solid Waste Management and DisposalDetails not statedRERA amenity record RERA amenities0% declared
Water Conservation, Rain water HarvestingDetails not statedRERA amenity record RERA amenities0% declared
Energy managementDetails not statedRERA amenity record RERA amenities0% declared
Fire Protection and Fire Safety RequirementsDetails not statedRERA amenity record RERA amenities0% declared
Electrical Meter Room, Sub-Station, Receiving StationDetails not statedRERA amenity record RERA amenities0% declared
Aggregate area of recreational Open SpaceArea not statedRERA amenity record RERA amenities0% declared

No clubhouse or indoor recreation facility, sports facility, or convenience/community facility is described in the supplied evidence beyond the listed community-building item. RERA amenities

Utilities, building services & safety

  • The RERA amenity record lists water supply, sewerage, storm-water drains and waste-related services, but does not provide water sources or capacity, storage or treatment details, sewerage-treatment specifications, reuse arrangements, storm-water design or waste-management arrangements. Their listed progress figures are declarations only. RERA amenities
  • The same record lists electrical meter room/sub-station/receiving station and fire-protection/fire-safety requirements at 0% declared progress. The supplied evidence does not state electrical supply or backup capacity, EV provision, fire-system specifications, emergency access, accessibility features or security systems. RERA amenities

Location, access & connectivity

  • The project’s registered location is Vityala village, Farooqnagar mandal, Ranga Reddy district, PIN 509202, with the locality described in the RERA fields as BESIDE USM MY CITY. The registration certificate also records locality as Vityala. RERA record RERA filing
  • The location record gives a sampled distance of 38.1 km to the nearest sampled Outer Ring Road interchange; it is an approximate anchor-distance, not a travel-time claim. Location record
  • The promoter’s vendor record markets proximity to the Regional Ring Road and Hyderabad–Bangalore Highway, and states 30 minutes’ drive to the ORR and International Airport and 15 minutes’ drive to MMTS Shadnagar. Those are promoter-marketed connectivity claims. Promoter website

Developer & development status

  • The registered promoter is AMR Infrastructures. The project fields identify the promoter organization as a company; a separate legal-entity type beyond that entry is not established in the supplied records. RERA record RERA filing
  • The registration certificate lists the promoter office as “Village: Mandal: ASIF NAGAR, District: Hyderabad, Pin: 500028.”
  • The Form B affidavit is a promoter declaration by the authorized signatory, Mukarram AH sidddiqui, dated 27 March 2019. It declares legal title, states that the land is free from encumbrances, and undertakes completion by 31/01/2021. These are the contents of the filed declaration, not independent verification of title, encumbrance status or completion.
  • The supplied record does not establish a current construction stage, phase-wise completion schedule, current promoter contact details or occupancy/completion certification. The registration certificate gives a validity period ending 31/01/2021 and records no extension.

Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceForm C; project AMR FUTURE CITY; registration no. P02400000583; issued 10/04/2019; valid through 31/01/2021.
Scope / limitationCertificate records the registration period and conditions; no extension is recorded on it.
DTCP file / annexure
Supplied evidenceFile no. DTCP-HT3/2/2019-HYD; annexure with conditions concerning layout development and proposals through the Gram Panchayat.
Scope / limitationAlso references Draft-TLP No. 25 / 2019/H; the supplied record does not establish a completed, stamped layout approval.
Form B declaration
Supplied evidencePromoter affidavit dated 27 March 2019.
Scope / limitationPromoter-declared title, encumbrance and completion statements; not independent verification.
Layout approval drawing / plot schedule
Supplied evidenceNot present in the supplied evidence.
Scope / limitationPlot arrangement, sanctioned plot count and plot sizes are not established here.
Occupancy or completion certificate
Supplied evidenceNot identified in the supplied evidence.
Scope / limitationNo phase- or development-wide certificate status can be established.

Other registrations of Amr Future City

Frequently asked questions

Is AMR FUTURE CITY registered with Telangana RERA?

Yes. AMR FUTURE CITY is registered with the Telangana Real Estate Regulatory Authority as P02400000583; the registration status is New Project.

Who is the developer of AMR FUTURE CITY?

The promoter named in the RERA registration is AMR Infrastructures.

Where is AMR FUTURE CITY located?

AMR FUTURE CITY is in BESIDE USM MY CITY, Vityala, Farooqnagar, Rangareddy, Telangana (509202).

When will AMR FUTURE CITY be completed?

The promoter's proposed date of completion filed with RERA is 31/01/2021. This is the promoter's declaration, not a guarantee.

More projects in Vityala