Zoltan Highway Green
ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED · Rangareddy · RERA P02400004209
ZOLTAN HIGHWAY GREEN is a plotted development in Mysigandi, Kadthal mandal, Ranga Reddy district, developed by registered promoter ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED. The RERA-recorded site area is 25090.51 sqmts, and the filed layout approval describes 78 residential plots; buildings, floors and plot configurations are not stated. Its TG-RERA registration is P02400004209, and its proposed completion date is 03/08/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | ZOLTAN HIGHWAY GREEN RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase or registered portion | Not separately identified in the supplied record; the registration is for the project under P02400004209 |
| TG-RERA registration | P02400004209; granted on 14/03/2022, valid through 03/08/2022. The certificate records no extension. Registration validity is not an occupancy or completion certificate. |
| Registered legal promoter | ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED RERA record |
| RERA status | Registration certificate supplied. The recorded validity ended on 03/08/2022; the supplied evidence does not establish a later extension or current registration status. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Maisigandi; the registration certificate gives Mysigandi. |
| Revenue village | Mysigandi in the RERA project record. The layout approval describes Maisigandi Gram Panchayat; these are the supplied location labels. RERA record |
| Mandal / district / PIN | Kadthal / Ranga Reddy / 509358 RERA record |
| Project survey numbers and subdivisions | 392/p, 394/p & 395/p (also rendered in the layout approval as Sy.Nos. 392/P, 394/P and 395/P). RERA record |
| RERA-recorded site area | Total Area: 25090.51 sqmts; Net Area: 25090.51 sqmts RERA filing |
| Layout-approval extent | Ac. 6-08 Guntas or Ac.6.20 Cents; 30008.00 Sq. Yds. |
| Boundaries in RERA land details | East: 33 Feet Wide Road; West: Neighbors Land; North: Owners Land; South: Existing 33 Feet Wide Road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal layout approval | Director of Town and Country Planning; Draft-TLP.No.288/2021/H, approved 11-10-2021. The filed approval concerns a draft technical layout pattern. Approvals record |
| Approved layout scale and land-use split | 78 plots. The approval records layout area Ac. 6.20 Cents; 30008.00 Sq. Yds.; plotted area Ac. 3.462 Cents; 16756.08 Sq. Yds. (55.84%); road area Ac. 2.118 Cents; 10251.12 Sq. Yds. (34.16%); open space Ac. 0.62 Cents; 3000.80 Sq Yds (10.00%); and mortgage area Ac. 0.558 Cents; 2700.72 Sq. Yards (16.11%), identified as plots 15 to 26. |
| Approved built-up area | RERA fields state 14010.21 sqmts; the supplied evidence does not explain the area basis. RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied project record. This is a plotted layout, not a supplied building-floor schedule. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Offered property type | Residential plots; the RERA project record identifies a plotted development. RERA filing |
| Plot count and sizes | The filed layout approval states 78 plots, but a plot-by-plot schedule or RERA inventory of sizes, bookings and availability was not supplied. |
| Construction / development stage | RERA fields show project completeness of 80%; this is a recorded progress figure, not independent site verification. RERA record |
| Completion date | RERA project information states proposed completion 03/08/2022. No revised completion date is supplied. RERA filing RERA record |
| Occupancy / completion certificate | Not supplied. The evidence does not establish that a completion or occupancy certificate has been issued. Document index |
2. The project story
ZOLTAN HIGHWAY GREEN is registered as a plotted development in the RERA record for survey numbers 392/p, 394/p & 395/p, at Mysigandi, Kadthal mandal, Ranga Reddy district. Its filed layout approval describes a draft technical layout pattern for 78 plots, with land allocated to plots, roads, open space and a Gram Panchayat mortgage area. RERA record
The RERA record gives a proposed completion date of 03/08/2022 and records 80% completeness. That figure is a project-record declaration; no independent site inspection or completion certification is included here. The registration certificate’s validity ended on 03/08/2022, while the supplied documents do not establish an extension or a completion/occupancy certificate. RERA record RERA filing
3. Master plan, architecture & building design
The supplied approval is for a draft plotted layout, not a building or apartment plan. It records 78 plots over a stated layout extent of Ac. 6.20 Cents; 30008.00 Sq. Yds. and specifies plotted, road, open-space and mortgage areas. The approval requires the open-space and road areas to be handed to the Gram Panchayat by registered gift deed before release of the final layout; the supplied evidence does not establish that this transfer or final release occurred.
The approval describes plot numbers 15 to 26 as the mortgage area in favour of Maisigandi Gram Panchayat. It also specifies layout-development works including road formation, drains and nala channelisation, greenery, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval requirements, not evidence that the works have been completed.
No plot-by-plot plan dimensions, individual plot-size schedule, building count, floor configuration, building footprint, or building-level architectural drawings are available in the supplied evidence. The RERA field lists approved built-up area as 14010.21 sqmts, without stating its measurement basis. RERA filing Document index
4. Homes, configurations & floor plans
This is recorded as a plotted development; apartment configuration, apartment counts and RERA-filed apartment saleable areas are not applicable in the supplied record. The filed layout approval identifies 78 plots, but no plot inventory showing individual plot areas, bookings or availability was supplied. RERA filing
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 78 in filed draft layout | Not supplied | Not supplied | Plot-wise areas not supplied | Not applicable | Not supplied |
The floor-plan dataset contains two drawings, both pending scan review; none has been software-measured. Apartment-style carpet-area measurements are therefore unavailable. Floor plans
5. Parking & vehicle circulation
The supplied layout approval requires roads to be formed and opened for access to neighbouring sites, and the RERA land details record roads along the east and south boundaries. No approved parking count, visitor or accessible parking provision, parking allocation, internal driveway dimensions, vehicle-entry arrangement, pedestrian separation, or EV-charging provision is established by the supplied evidence. RERA filing Document index
6. Amenities, recreation & open spaces
The filed layout approval lists development requirements for roads, drainage, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. RERA amenity fields mark several infrastructure items as available (“YES”), but each carries 0% progress; those entries do not establish completed or independently verified facilities. RERA amenities
| Description / size | Approval records Ac. 0.62 Cents; 3000.80 Sq Yds (10.00%) as open space; it also identifies open space for a park. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA field marks “Open Space For Park” available “YES,” at 0% progress; completed status not verified. |
| Description / size | Layout approval requires road formation and access; area recorded as Ac. 2.118 Cents; 10251.12 Sq. Yds. (34.16%). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA field marks available “YES,” at 0% progress; completed status not verified. |
| Description / size | Listed as a layout-development requirement. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No completion verification supplied. |
| Description / size | Approval requires protected water supply; RERA amenity field marks water supply available “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Approval requires a sewerage disposal system; RERA field lists sewerage infrastructure. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Listed in the approval’s development works. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No completion verification supplied. |
| Description / size | Listed in the approval’s development works; RERA marks street lighting available “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Street lighting is recorded at 0% progress; completion not verified. |
| Description / size | Listed in the approval’s development works; RERA marks water conservation/rainwater harvesting available “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Listed in RERA amenity fields; no sizes, capacities or completion evidence supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress is shown as 0%; completion not verified. |
7. Utilities, building services & safety
The layout approval requires protected water supply, sewerage disposal, drainage and nala channelisation, rainwater-harvesting pits, street lighting and electricity facilities. RERA amenity fields also list water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and electrical infrastructure; the supplied entries show 0% progress, and no capacities, as-built records or independent completion verification are provided. RERA amenities
The supplied evidence does not establish water source or storage capacity, sewage-treatment or reuse arrangements, electrical supply capacity or backup, fire systems, waste-segregation arrangements, CCTV/security systems, or accessible circulation. No building-level lifts or escape-stair information is available for this plotted layout. RERA amenities Document index
8. Location, access & connectivity
The registered location is Mysigandi, Kadthal mandal, Ranga Reddy district, Telangana, 509358; the filed layout approval identifies Maisigandi Gram Panchayat. RERA land details show a 33 Feet Wide Road on the east boundary and an Existing 33 Feet Wide Road on the south boundary. RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 28.3 km. This is a recorded approximate distance, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED, a private limited company. The supplied corporate identifier is GSTIN 36AAACZ7887R1Z2. RERA record Corporate record
The RERA certificate lists the promoter office as Village: Shivarampally, Mandal: Rajendranagar, District: Ranga Reddy, Pin: 500052. The project record gives the project site/locality as Mysigandi, Kadthal mandal, Ranga Reddy district, PIN 509358. RERA record
The registration record states proposed completion on 03/08/2022 and records 80% completeness; no later completion date, independent construction-progress verification, or completion/occupancy certificate is supplied. RERA filing RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for ZOLTAN HIGHWAY GREEN, registration P02400004209, dated 14/03/2022, valid through 03/08/2022; the supplied certificate records no extension. |
| Principal layout approval | Draft-TLP.No.288/2021/H, approved 11-10-2021 by the Director of Town and Country Planning; filed approval covers survey numbers 392/P, 394/P and 395/P and a 78-plot draft layout. |
| Approval correspondence identifiers | Lr.Roc.No.12022/1996/2021/e-Panchayat; application number 12022/1996. |
| Title report | Legal title report dated 18-02-2022, concerning land described in its supplied summary as Sy.Nos. 392/AA, 392/U, 394/A and 395/AA at Kadthal Village and Mandal; this is listed here as a filed document, not as a substitute for the project survey identity above. |
| Form-B declaration | Form-B affidavit dated FEB-23-2022 by Koti Shridhar and Zoltan Infra Developers Private Limited, containing promoter declarations and undertakings. |
| Encumbrance statement | Filed encumbrance statement 78716969, with entries dated 2007 and 2015. |
| Occupancy / completion certificate | Not supplied in the available project documents. Document index |
| Building plans / commencement certificates | No building-level plan or commencement certificate is established by the supplied evidence; the documents labelled as commencement certificates contain the draft layout approval. Document index |
1. Project at a glance
Project identity
Registered project name: ZOLTAN HIGHWAY GREEN
Project type: Plotted development / plotted layout
Phase or registered portion: Not separately identified in the supplied record; the registration is for the project under P02400004209
TG-RERA registration: P02400004209; granted on 14/03/2022, valid through 03/08/2022. The certificate records no extension. Registration validity is not an occupancy or completion certificate.
Registered legal promoter: ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED
RERA status: Registration certificate supplied. The recorded validity ended on 03/08/2022; the supplied evidence does not establish a later extension or current registration status.
Land and geographic identity
Locality: Maisigandi; the registration certificate gives Mysigandi.
Revenue village: Mysigandi in the RERA project record. The layout approval describes Maisigandi Gram Panchayat; these are the supplied location labels.
Mandal / district / PIN: Kadthal / Ranga Reddy / 509358
Project survey numbers and subdivisions: 392/p, 394/p & 395/p (also rendered in the layout approval as Sy.Nos. 392/P, 394/P and 395/P).
RERA-recorded site area: Total Area: 25090.51 sqmts; Net Area: 25090.51 sqmts
Layout-approval extent: Ac. 6-08 Guntas or Ac.6.20 Cents; 30008.00 Sq. Yds.
Boundaries in RERA land details: East: 33 Feet Wide Road; West: Neighbors Land; North: Owners Land; South: Existing 33 Feet Wide Road.
Development identity
Sanctioning authority / principal layout approval: Director of Town and Country Planning; Draft-TLP.No.288/2021/H, approved 11-10-2021. The filed approval concerns a draft technical layout pattern.
Approved layout scale and land-use split: 78 plots. The approval records layout area Ac. 6.20 Cents; 30008.00 Sq. Yds.; plotted area Ac. 3.462 Cents; 16756.08 Sq. Yds. (55.84%); road area Ac. 2.118 Cents; 10251.12 Sq. Yds. (34.16%); open space Ac. 0.62 Cents; 3000.80 Sq Yds (10.00%); and mortgage area Ac. 0.558 Cents; 2700.72 Sq. Yards (16.11%), identified as plots 15 to 26.
Approved built-up area: RERA fields state 14010.21 sqmts; the supplied evidence does not explain the area basis.
Buildings / floors / parking levels: Not disclosed in the supplied project record. This is a plotted layout, not a supplied building-floor schedule.
Offering and status
Offered property type: Residential plots; the RERA project record identifies a plotted development.
Plot count and sizes: The filed layout approval states 78 plots, but a plot-by-plot schedule or RERA inventory of sizes, bookings and availability was not supplied.
Construction / development stage: RERA fields show project completeness of 80%; this is a recorded progress figure, not independent site verification.
Completion date: RERA project information states proposed completion 03/08/2022. No revised completion date is supplied.
Occupancy / completion certificate: Not supplied. The evidence does not establish that a completion or occupancy certificate has been issued.
2. The project story
ZOLTAN HIGHWAY GREEN is registered as a plotted development in the RERA record for survey numbers 392/p, 394/p & 395/p, at Mysigandi, Kadthal mandal, Ranga Reddy district. Its filed layout approval describes a draft technical layout pattern for 78 plots, with land allocated to plots, roads, open space and a Gram Panchayat mortgage area.
The RERA record gives a proposed completion date of 03/08/2022 and records 80% completeness. That figure is a project-record declaration; no independent site inspection or completion certification is included here. The registration certificate’s validity ended on 03/08/2022, while the supplied documents do not establish an extension or a completion/occupancy certificate.
3. Master plan, architecture & building design
The supplied approval is for a draft plotted layout, not a building or apartment plan. It records 78 plots over a stated layout extent of Ac. 6.20 Cents; 30008.00 Sq. Yds. and specifies plotted, road, open-space and mortgage areas. The approval requires the open-space and road areas to be handed to the Gram Panchayat by registered gift deed before release of the final layout; the supplied evidence does not establish that this transfer or final release occurred.
The approval describes plot numbers 15 to 26 as the mortgage area in favour of Maisigandi Gram Panchayat. It also specifies layout-development works including road formation, drains and nala channelisation, greenery, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval requirements, not evidence that the works have been completed.
No plot-by-plot plan dimensions, individual plot-size schedule, building count, floor configuration, building footprint, or building-level architectural drawings are available in the supplied evidence. The RERA field lists approved built-up area as 14010.21 sqmts, without stating its measurement basis.
4. Homes, configurations & floor plans
This is recorded as a plotted development; apartment configuration, apartment counts and RERA-filed apartment saleable areas are not applicable in the supplied record. The filed layout approval identifies 78 plots, but no plot inventory showing individual plot areas, bookings or availability was supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 78 in filed draft layout | Not supplied | Not supplied | Plot-wise areas not supplied | Not applicable | Not supplied |
The floor-plan dataset contains two drawings, both pending scan review; none has been software-measured. Apartment-style carpet-area measurements are therefore unavailable.
5. Parking & vehicle circulation
The supplied layout approval requires roads to be formed and opened for access to neighbouring sites, and the RERA land details record roads along the east and south boundaries. No approved parking count, visitor or accessible parking provision, parking allocation, internal driveway dimensions, vehicle-entry arrangement, pedestrian separation, or EV-charging provision is established by the supplied evidence.
6. Amenities, recreation & open spaces
The filed layout approval lists development requirements for roads, drainage, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. RERA amenity fields mark several infrastructure items as available (“YES”), but each carries 0% progress; those entries do not establish completed or independently verified facilities.
| Description / size | Approval records Ac. 0.62 Cents; 3000.80 Sq Yds (10.00%) as open space; it also identifies open space for a park. |
|---|---|
| Declared progress / verified status | RERA field marks “Open Space For Park” available “YES,” at 0% progress; completed status not verified. |
| Description / size | Layout approval requires road formation and access; area recorded as Ac. 2.118 Cents; 10251.12 Sq. Yds. (34.16%). |
|---|---|
| Declared progress / verified status | RERA field marks available “YES,” at 0% progress; completed status not verified. |
| Description / size | Listed as a layout-development requirement. |
|---|---|
| Declared progress / verified status | No completion verification supplied. |
| Description / size | Approval requires protected water supply; RERA amenity field marks water supply available “YES.” |
|---|---|
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Approval requires a sewerage disposal system; RERA field lists sewerage infrastructure. |
|---|---|
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Listed in the approval’s development works. |
|---|---|
| Declared progress / verified status | No completion verification supplied. |
| Description / size | Listed in the approval’s development works; RERA marks street lighting available “YES.” |
|---|---|
| Declared progress / verified status | Street lighting is recorded at 0% progress; completion not verified. |
| Description / size | Listed in the approval’s development works; RERA marks water conservation/rainwater harvesting available “YES.” |
|---|---|
| Declared progress / verified status | 0% progress in the RERA amenity field; completion not verified. |
| Description / size | Listed in RERA amenity fields; no sizes, capacities or completion evidence supplied. |
|---|---|
| Declared progress / verified status | Progress is shown as 0%; completion not verified. |
7. Utilities, building services & safety
The layout approval requires protected water supply, sewerage disposal, drainage and nala channelisation, rainwater-harvesting pits, street lighting and electricity facilities. RERA amenity fields also list water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and electrical infrastructure; the supplied entries show 0% progress, and no capacities, as-built records or independent completion verification are provided.
The supplied evidence does not establish water source or storage capacity, sewage-treatment or reuse arrangements, electrical supply capacity or backup, fire systems, waste-segregation arrangements, CCTV/security systems, or accessible circulation. No building-level lifts or escape-stair information is available for this plotted layout.
8. Location, access & connectivity
The registered location is Mysigandi, Kadthal mandal, Ranga Reddy district, Telangana, 509358; the filed layout approval identifies Maisigandi Gram Panchayat. RERA land details show a 33 Feet Wide Road on the east boundary and an Existing 33 Feet Wide Road on the south boundary.
The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 28.3 km. This is a recorded approximate distance, not a travel-time estimate.
9. Developer & development status
The registered promoter is ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED, a private limited company. The supplied corporate identifier is GSTIN 36AAACZ7887R1Z2.
The RERA certificate lists the promoter office as Village: Shivarampally, Mandal: Rajendranagar, District: Ranga Reddy, Pin: 500052. The project record gives the project site/locality as Mysigandi, Kadthal mandal, Ranga Reddy district, PIN 509358.
The registration record states proposed completion on 03/08/2022 and records 80% completeness; no later completion date, independent construction-progress verification, or completion/occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for ZOLTAN HIGHWAY GREEN, registration P02400004209, dated 14/03/2022, valid through 03/08/2022; the supplied certificate records no extension.
Principal layout approval: Draft-TLP.No.288/2021/H, approved 11-10-2021 by the Director of Town and Country Planning; filed approval covers survey numbers 392/P, 394/P and 395/P and a 78-plot draft layout.
Approval correspondence identifiers: Lr.Roc.No.12022/1996/2021/e-Panchayat; application number 12022/1996.
Title report: Legal title report dated 18-02-2022, concerning land described in its supplied summary as Sy.Nos. 392/AA, 392/U, 394/A and 395/AA at Kadthal Village and Mandal; this is listed here as a filed document, not as a substitute for the project survey identity above.
Form-B declaration: Form-B affidavit dated FEB-23-2022 by Koti Shridhar and Zoltan Infra Developers Private Limited, containing promoter declarations and undertakings.
Encumbrance statement: Filed encumbrance statement 78716969, with entries dated 2007 and 2015.
Occupancy / completion certificate: Not supplied in the available project documents.
Building plans / commencement certificates: No building-level plan or commencement certificate is established by the supplied evidence; the documents labelled as commencement certificates contain the draft layout approval.
Frequently asked questions
Is ZOLTAN HIGHWAY GREEN registered with Telangana RERA?
Yes. ZOLTAN HIGHWAY GREEN is registered with the Telangana Real Estate Regulatory Authority as P02400004209; the registration status is New Project.
Who is the developer of ZOLTAN HIGHWAY GREEN?
The promoter named in the RERA registration is ZOLTAN INFRA DEVELOPERS PRIVATE LIMITED.
Where is ZOLTAN HIGHWAY GREEN located?
ZOLTAN HIGHWAY GREEN is in Maisigandi, Mysigandi, Kadthal, Rangareddy, Telangana (509358).
When will ZOLTAN HIGHWAY GREEN be completed?
The promoter's proposed date of completion filed with RERA is 03/08/2022. This is the promoter's declaration, not a guarantee.