Artha Sagar By Ajr Estates
AJR ESTATES · Rangareddy · RERA P02400002950
ARTHA SAGAR BY AJR ESTATES is a plotted development in OPP ESSAR PETROL PUMP, Thakkalapalle, Yacharam, Ranga Reddy, on a RERA-filed site area of Total Area: 41601.684 sq.mts. The registered promoter is AJR ESTATES. The draft approval describes 165 plots; building configurations, plot-size range, towers and floors are not stated. The TG-RERA registration is P02400002950, and the proposed completion date is 02/02/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ARTHA SAGAR BY AJR ESTATES RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase or registered portion | Phase designation not disclosed; registration is for the project’s plotted layout |
| TG-RERA registration | P02400002950, granted under section 5; registration valid from 17/05/2021 to 02/02/2023. The certificate records no extension. |
| Registered promoter | AJR ESTATES, identified in the filing as a proprietorship RERA record RERA filing |
| RERA status in supplied record | Registration period ended 02/02/2023. This is the registration-validity date, not an occupancy or completion-certificate status. |
Land and geographic identity
| Field | Record |
|---|---|
| Registered locality | OPP ESSAR PETROL PUMP RERA record RERA filing |
| Revenue village | Thakkalapalle RERA record RERA filing |
| Mandal / district / PIN | Yacharam / Ranga Reddy / 501509 RERA record RERA filing |
| Project survey numbers and subdivisions | 228/P, 229/P, 230/P, 231/P RERA record |
| RERA-filed site area | Total Area: 41601.684 sq.mts; Net Area: 41601.68 sq.mts; Area affected in Road widening/FTL of Tanks/Nala Widening: 0 sq.mts RERA filing |
| Boundaries filed with RERA | East: ROAD - 33 FT; West: NAGARJUNA SAGAR HIGHWAY AND LAND OF A JAGAN REDDY; North: SY NO 228P AND 229P; South: SY NO 231 P RERA filing |
| Cadastral record coverage | A Bhu Bharati survey record is supplied for 228/P; it reports a whole-survey extent of 42080.28 sqm. It is a survey-level record, not an independent confirmation of the project’s exact parcel Cadastral map. |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; approval delegated to Takkalapally Gram Panchayat |
| Principal layout approval | Draft Technical Layout Pattern Draft-TLP.No.26/2021/H, dated 02-02-2021 Approvals record |
| Approved layout scale | 165 plots; approval document states Ac. 10.28 Cents 49755.20 Sa. Yds. |
| Land-use schedule in the draft approval | Layout area Ac. 10.28 Cents 49755.20 Sa. Yds.; open space Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%); road area Ac. 3.754 Cents 18169.36 Sa. Yds. (36.51%); plotted area Ac. 5.498 Cents 26610.32 Sa. Yds. (53.49%); mortgage area Ac. 0.845 Cents 4089.80 Sq. Yds. (15.36%). |
| Building configuration / built-up area | Not applicable to the filed plotted-layout description; no building count or approved built-up area is disclosed in the supplied project record RERA filing. |
Offering and status
| Field | Record |
|---|---|
| Offering in approval record | A 165-plot layout |
| RERA-filed plot size range, booked/available counts | Not supplied in the provided unit or layout records. The approval excerpt gives the plot count but not plot-by-plot areas or inventory status. |
| Completion deadline in project record | Proposed completion date 02/02/2023 RERA record RERA filing |
| Completion evidence on file | A document titled WORK COMPLETION CERTIFICATE, dated 08 / 07 /2024, identifies the same DTLP number and survey numbers and certifies layout-development works; it is not identified here as an occupancy certificate. |
| Occupancy-certificate status | The supplied certificate is a work-completion certificate for the plotted layout. A separate occupancy certificate is not identified in the supplied documents. |
2. The project story
Artha Sagar is registered as a plotted development in Thakkalapalle village, Yacharam mandal, Ranga Reddy district, on the Nagarjuna Sagar Highway side of the registered locality. The RERA filing identifies survey numbers 228/P, 229/P, 230/P and 231/P and an intended residential layout; the DTCP draft layout approval describes 165 plots and allocates land to plots, roads, open space and mortgage plots RERA record.
The RERA record gives 02/02/2023 as the proposed completion date. A later architect’s Form–1A document, dated 08 / 07 /2024, certifies completion of layout development works, including roads, drainage, greenery, street lighting, electricity, sewerage and water-supply works. This is documentary certification, not an independent site inspection in the evidence supplied RERA filing.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The DTCP draft approval describes 165 plots over Ac. 10.28 Cents 49755.20 Sa. Yds. and records the following land-use breakdown:
| Layout component | Area and share recorded in approval |
|---|---|
| Plotted area | Ac. 5.498 Cents 26610.32 Sa. Yds. (53.49%) |
| Road area | Ac. 3.754 Cents 18169.36 Sa. Yds. (36.51%) |
| Open space | Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%) |
| Mortgage area | Ac. 0.845 Cents 4089.80 Sq. Yds. (15.36%), identified in the conditions as Plot Nos. 82 to 107 |
The approval conditions call for plot and open-space demarcation, roads accessible to neighboring sites, and development works including road formation, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. The document describes a draft layout approval and requires roads and open space to be gifted to the Gram Panchayat before release of the final layout; the supplied material does not include a final-layout release document.
No building footprints, apartment blocks, floors, building heights, floor plans or residential/commercial building-area schedule are supplied. A master-plan zoning sheet for Yacharam is reported as available, but it is image-only and the exact zone at the project survey has not been determined in the supplied record HMDA.
4. Homes, configurations & floor plans
The project is offered as plots, not apartments. The DTCP draft approval records 165 plots, but the supplied RERA data does not provide a plot-by-plot schedule, plot-size bands, booked and available counts, or plot-specific saleable areas.
A vendor record describes plots of 150 sq. yards; this is a promoter-marketing detail, not a RERA-filed plot schedule in the supplied evidence Promoter website. No usable floor-plan measurements are available: two drawings are listed, both scans pending, with 0 measured Floor plans.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 165 in the draft approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, or plot-specific parking allocations. The draft approval provides for roads and access through the layout, but the available extract does not state road widths or detailed vehicle-circulation arrangements. The vendor lists 40' and 33' Wide CC roads; this is a vendor claim rather than a quantified RERA-filed parking or circulation schedule Promoter website.
The draft approval identifies Plot Nos. 82 to 107, extent Ac. 0.845 Cents or 4089.80 Sq. Yards, as mortgage plots in favour of Takkalapally Gram Panchayat and states that the mortgaged area is not for sale under its conditions.
6. Amenities, recreation & open spaces
| Facility | Public open space |
|---|---|
| Description / size | Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%) in the draft approval |
| Declared progress / verified status | Required by the draft approval; the completion certificate lists greenery and avenue planting, but the supplied material does not independently verify the open-space area on site. |
| Facility | Greenery and avenue plantation |
|---|---|
| Description / size | No size supplied |
| Evidence source | Draft approval and completion certificate |
| Declared progress / verified status | Listed as a required layout work in the draft approval; listed among completed works in the certificate. |
| Facility | Park / recreational space |
|---|---|
| Description / size | No park size or facilities schedule supplied |
| Evidence source | RERA amenities record RERA amenities; vendor Promoter website |
| Declared progress / verified status | The RERA amenities record lists “Green Strip/TOT LOT/Park” at 100%; vendor also lists park development. The supplied record does not independently verify the park’s delivered condition or area RERA amenities Promoter website. |
| Facility | Community buildings |
|---|---|
| Description / size | No description or size supplied |
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record shows 0%; no community building is established by the supplied documents RERA amenities. |
The draft approval also lists fencing of open spaces and rainwater-harvesting pits among required works. These are approval-condition items; their delivered status is not established by the supplied completion-certificate excerpt.
7. Utilities, building services & safety
The draft layout conditions require road formation, drains and nala channelization for storm-water runoff, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal and protected water supply. The later Form–1A work-completion certificate lists roads, drainage, street lighting, electricity, sewerage and protected water supply among completed layout works.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting and an electrical meter room/sub-station/receiving station at 100%. It marks water conservation/rainwater harvesting, solid-waste management, energy management and fire-protection/fire-safety requirements at 0% RERA amenities. These are recorded status fields, not independent verification of operation or statutory compliance.
The vendor lists underground water and sewage systems, an overhead water tank, a dedicated transformer and water-harvesting facilities, but the supplied RERA documents do not establish their capacities or independently confirm these vendor details Promoter website. The approval and completion records provide no evidence of lifts, building fire systems, security/CCTV, accessibility arrangements or backup-power capacity; these are not described as applicable building systems in the plotted-layout evidence.
8. Location, access & connectivity
The registered location is OPP ESSAR PETROL PUMP, Thakkalapalle village, Yacharam mandal, Ranga Reddy district, Telangana, 501509. The filed west boundary identifies NAGARJUNA SAGAR HIGHWAY AND LAND OF A JAGAN REDDY; the east boundary is ROAD - 33 FT RERA record RERA filing RERA filing.
A supplied location record reports the nearest sampled Outer Ring Road interchange at 24.9 km (approx) Location record. No additional public-transport details or verified travel times are supplied.
9. Developer & development status
The registered promoter is AJR ESTATES, identified in the RERA filing as a proprietorship. The project documents name A. Rohit Reddy as proprietor or authorized representative; the supplied record does not establish a separate corporate entity number or a verified official contact channel Corporate record RERA filing.
The Form-B filing dated 10-02-2021 contains promoter declarations about title, encumbrances, project funds, pending approvals and a completion undertaking “within 3 years”. The project record separately states proposed completion 02/02/2023 RERA filing. The supplied completion document is dated 08 / 07 /2024 and certifies layout-development works; the supplied documents do not show a later RERA registration extension.
10. Approvals, official records & documents
| Document / reference | Form C, P02400002950 |
|---|---|
| What the supplied record establishes | Registration for ARTHA SAGAR BY AJR ESTATES, valid from 17/05/2021 to 02/02/2023. |
| Document / reference | Draft Technical Layout Pattern Draft-TLP.No.26/2021/H, dated 02-02-2021 |
|---|---|
| What the supplied record establishes | DTCP draft approval for a 165-plot layout on the four filed survey numbers, subject to conditions. |
| Document / reference | Form-B affidavit, dated 10-02-2021 |
|---|---|
| What the supplied record establishes | Promoter’s declarations and completion undertaking. |
| Document / reference | Form–1A / WORK COMPLETION CERTIFICATE, dated 08 / 07 /2024, DTLP No.26/2021/H |
|---|---|
| What the supplied record establishes | Architect’s certification of layout-development works for the same survey numbers and village. |
| Document / reference | RERA filing document 150308 Document index |
|---|---|
| What the supplied record establishes | Listed as a layout-plan document, but the supplied extraction is not available for review. |
| Document / reference | Development Agreement-cum-General Power of Attorney and title-search report |
|---|---|
| What the supplied record establishes | Available in the project file; detailed title-chain review belongs in the Land & Title section. |
| Document / reference | Master Plan 2031 Yacharam sheet; approved-layout lookup unavailable through the public portal HMDA |
|---|---|
| What the supplied record establishes | The map is image-only and does not establish the survey-level zone in this review; the public HMDA DPMS lookup is reported unavailable. |
1. Project at a glance
Project identity
Registered project name: ARTHA SAGAR BY AJR ESTATES
Project type: Plotted development / plotted layout
Phase or registered portion: Phase designation not disclosed; registration is for the project’s plotted layout
TG-RERA registration: P02400002950, granted under section 5; registration valid from 17/05/2021 to 02/02/2023. The certificate records no extension.
Registered promoter: AJR ESTATES, identified in the filing as a proprietorship
RERA status in supplied record: Registration period ended 02/02/2023. This is the registration-validity date, not an occupancy or completion-certificate status.
Land and geographic identity
Registered locality: OPP ESSAR PETROL PUMP
Revenue village: Thakkalapalle
Mandal / district / PIN: Yacharam / Ranga Reddy / 501509
Project survey numbers and subdivisions: 228/P, 229/P, 230/P, 231/P
RERA-filed site area: Total Area: 41601.684 sq.mts; Net Area: 41601.68 sq.mts; Area affected in Road widening/FTL of Tanks/Nala Widening: 0 sq.mts
Boundaries filed with RERA: East: ROAD - 33 FT; West: NAGARJUNA SAGAR HIGHWAY AND LAND OF A JAGAN REDDY; North: SY NO 228P AND 229P; South: SY NO 231 P
Cadastral record coverage: A Bhu Bharati survey record is supplied for 228/P; it reports a whole-survey extent of 42080.28 sqm. It is a survey-level record, not an independent confirmation of the project’s exact parcel.
Development identity
Sanctioning authority: Director of Town and Country Planning; approval delegated to Takkalapally Gram Panchayat
Principal layout approval: Draft Technical Layout Pattern Draft-TLP.No.26/2021/H, dated 02-02-2021
Approved layout scale: 165 plots; approval document states Ac. 10.28 Cents 49755.20 Sa. Yds.
Land-use schedule in the draft approval: Layout area Ac. 10.28 Cents 49755.20 Sa. Yds.; open space Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%); road area Ac. 3.754 Cents 18169.36 Sa. Yds. (36.51%); plotted area Ac. 5.498 Cents 26610.32 Sa. Yds. (53.49%); mortgage area Ac. 0.845 Cents 4089.80 Sq. Yds. (15.36%).
Building configuration / built-up area: Not applicable to the filed plotted-layout description; no building count or approved built-up area is disclosed in the supplied project record.
Offering and status
Offering in approval record: A 165-plot layout
RERA-filed plot size range, booked/available counts: Not supplied in the provided unit or layout records. The approval excerpt gives the plot count but not plot-by-plot areas or inventory status.
Completion deadline in project record: Proposed completion date 02/02/2023
Completion evidence on file: A document titled WORK COMPLETION CERTIFICATE, dated 08 / 07 /2024, identifies the same DTLP number and survey numbers and certifies layout-development works; it is not identified here as an occupancy certificate.
Occupancy-certificate status: The supplied certificate is a work-completion certificate for the plotted layout. A separate occupancy certificate is not identified in the supplied documents.
2. The project story
Artha Sagar is registered as a plotted development in Thakkalapalle village, Yacharam mandal, Ranga Reddy district, on the Nagarjuna Sagar Highway side of the registered locality. The RERA filing identifies survey numbers 228/P, 229/P, 230/P and 231/P and an intended residential layout; the DTCP draft layout approval describes 165 plots and allocates land to plots, roads, open space and mortgage plots.
The RERA record gives 02/02/2023 as the proposed completion date. A later architect’s Form–1A document, dated 08 / 07 /2024, certifies completion of layout development works, including roads, drainage, greenery, street lighting, electricity, sewerage and water-supply works. This is documentary certification, not an independent site inspection in the evidence supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The DTCP draft approval describes 165 plots over Ac. 10.28 Cents 49755.20 Sa. Yds. and records the following land-use breakdown:
Plotted area: Ac. 5.498 Cents 26610.32 Sa. Yds. (53.49%)
Road area: Ac. 3.754 Cents 18169.36 Sa. Yds. (36.51%)
Open space: Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%)
Mortgage area: Ac. 0.845 Cents 4089.80 Sq. Yds. (15.36%), identified in the conditions as Plot Nos. 82 to 107
The approval conditions call for plot and open-space demarcation, roads accessible to neighboring sites, and development works including road formation, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. The document describes a draft layout approval and requires roads and open space to be gifted to the Gram Panchayat before release of the final layout; the supplied material does not include a final-layout release document.
No building footprints, apartment blocks, floors, building heights, floor plans or residential/commercial building-area schedule are supplied. A master-plan zoning sheet for Yacharam is reported as available, but it is image-only and the exact zone at the project survey has not been determined in the supplied record.
4. Homes, configurations & floor plans
The project is offered as plots, not apartments. The DTCP draft approval records 165 plots, but the supplied RERA data does not provide a plot-by-plot schedule, plot-size bands, booked and available counts, or plot-specific saleable areas.
A vendor record describes plots of 150 sq. yards; this is a promoter-marketing detail, not a RERA-filed plot schedule in the supplied evidence. No usable floor-plan measurements are available: two drawings are listed, both scans pending, with 0 measured.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 165 in the draft approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, or plot-specific parking allocations. The draft approval provides for roads and access through the layout, but the available extract does not state road widths or detailed vehicle-circulation arrangements. The vendor lists 40' and 33' Wide CC roads; this is a vendor claim rather than a quantified RERA-filed parking or circulation schedule.
The draft approval identifies Plot Nos. 82 to 107, extent Ac. 0.845 Cents or 4089.80 Sq. Yards, as mortgage plots in favour of Takkalapally Gram Panchayat and states that the mortgaged area is not for sale under its conditions.
6. Amenities, recreation & open spaces
| Facility | Public open space |
|---|---|
| Description / size | Ac. 1.028 Cents 4975.52 Sa. Yds. (10.00%) in the draft approval |
| Declared progress / verified status | Required by the draft approval; the completion certificate lists greenery and avenue planting, but the supplied material does not independently verify the open-space area on site. |
| Facility | Greenery and avenue plantation |
|---|---|
| Description / size | No size supplied |
| Evidence source | Draft approval and completion certificate |
| Declared progress / verified status | Listed as a required layout work in the draft approval; listed among completed works in the certificate. |
| Facility | Park / recreational space |
|---|---|
| Description / size | No park size or facilities schedule supplied |
| Evidence source | RERA amenities record; vendor |
| Declared progress / verified status | The RERA amenities record lists “Green Strip/TOT LOT/Park” at 100%; vendor also lists park development. The supplied record does not independently verify the park’s delivered condition or area. |
| Facility | Community buildings |
|---|---|
| Description / size | No description or size supplied |
| Evidence source | RERA amenities record |
| Declared progress / verified status | RERA amenities record shows 0%; no community building is established by the supplied documents. |
The draft approval also lists fencing of open spaces and rainwater-harvesting pits among required works. These are approval-condition items; their delivered status is not established by the supplied completion-certificate excerpt.
7. Utilities, building services & safety
The draft layout conditions require road formation, drains and nala channelization for storm-water runoff, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal and protected water supply. The later Form–1A work-completion certificate lists roads, drainage, street lighting, electricity, sewerage and protected water supply among completed layout works.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting and an electrical meter room/sub-station/receiving station at 100%. It marks water conservation/rainwater harvesting, solid-waste management, energy management and fire-protection/fire-safety requirements at 0%. These are recorded status fields, not independent verification of operation or statutory compliance.
The vendor lists underground water and sewage systems, an overhead water tank, a dedicated transformer and water-harvesting facilities, but the supplied RERA documents do not establish their capacities or independently confirm these vendor details. The approval and completion records provide no evidence of lifts, building fire systems, security/CCTV, accessibility arrangements or backup-power capacity; these are not described as applicable building systems in the plotted-layout evidence.
8. Location, access & connectivity
The registered location is OPP ESSAR PETROL PUMP, Thakkalapalle village, Yacharam mandal, Ranga Reddy district, Telangana, 501509. The filed west boundary identifies NAGARJUNA SAGAR HIGHWAY AND LAND OF A JAGAN REDDY; the east boundary is ROAD - 33 FT.
A supplied location record reports the nearest sampled Outer Ring Road interchange at 24.9 km (approx). No additional public-transport details or verified travel times are supplied.
9. Developer & development status
The registered promoter is AJR ESTATES, identified in the RERA filing as a proprietorship. The project documents name A. Rohit Reddy as proprietor or authorized representative; the supplied record does not establish a separate corporate entity number or a verified official contact channel.
The Form-B filing dated 10-02-2021 contains promoter declarations about title, encumbrances, project funds, pending approvals and a completion undertaking “within 3 years”. The project record separately states proposed completion 02/02/2023. The supplied completion document is dated 08 / 07 /2024 and certifies layout-development works; the supplied documents do not show a later RERA registration extension.
10. Approvals, official records & documents
| Document / reference | Form C, P02400002950 |
|---|---|
| What the supplied record establishes | Registration for ARTHA SAGAR BY AJR ESTATES, valid from 17/05/2021 to 02/02/2023. |
| Document / reference | Draft Technical Layout Pattern Draft-TLP.No.26/2021/H, dated 02-02-2021 |
|---|---|
| What the supplied record establishes | DTCP draft approval for a 165-plot layout on the four filed survey numbers, subject to conditions. |
| Document / reference | Form-B affidavit, dated 10-02-2021 |
|---|---|
| What the supplied record establishes | Promoter’s declarations and completion undertaking. |
| Document / reference | Form–1A / WORK COMPLETION CERTIFICATE, dated 08 / 07 /2024, DTLP No.26/2021/H |
|---|---|
| What the supplied record establishes | Architect’s certification of layout-development works for the same survey numbers and village. |
| Document / reference | RERA filing document 150308 |
|---|---|
| What the supplied record establishes | Listed as a layout-plan document, but the supplied extraction is not available for review. |
| Document / reference | Development Agreement-cum-General Power of Attorney and title-search report |
|---|---|
| What the supplied record establishes | Available in the project file; detailed title-chain review belongs in the Land & Title section. |
| Document / reference | Master Plan 2031 Yacharam sheet; approved-layout lookup unavailable through the public portal |
|---|---|
| What the supplied record establishes | The map is image-only and does not establish the survey-level zone in this review; the public HMDA DPMS lookup is reported unavailable. |
Frequently asked questions
Is ARTHA SAGAR BY AJR ESTATES registered with Telangana RERA?
Yes. ARTHA SAGAR BY AJR ESTATES is registered with the Telangana Real Estate Regulatory Authority as P02400002950; the registration status is New Project.
Who is the developer of ARTHA SAGAR BY AJR ESTATES?
The promoter named in the RERA registration is AJR ESTATES.
Where is ARTHA SAGAR BY AJR ESTATES located?
ARTHA SAGAR BY AJR ESTATES is in OPP ESSAR PETROL PUMP, Thakkalapalle, Yacharam, Rangareddy, Telangana (501509).
When will ARTHA SAGAR BY AJR ESTATES be completed?
The promoter's proposed date of completion filed with RERA is 02/02/2023. This is the promoter's declaration, not a guarantee.

