ORGANO DEPALLE EXTEN is a residential project in DEPALLE, Nawabpet mandal, Mahabubnagar district, developed by registered promoter ORGANO COSMOSGREEN PRIVATE LIMITED. The site area is 192330.34 Sq. Mtrs, with 35 named residential building groups, each Ground Floor + 1 Upper Floor; the RERA unit record lists 194 blocks and 394 1BHK units, with a filed saleable area of 86.44 sq m per unit. The supplied record does not provide a TG-RERA registration number. The proposed completion deadline is 29/07/2029.

More from Organo Cosmosgreen Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 29 Jul 2029
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Depalle, Nawabpet, Mahabubnagar · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameORGANO DEPALLE EXTEN RERA record
Project typeResidential; HMDA’s revised building-permit order describes residential buildings with associated amenity/commercial structures. RERA record
Phase / registered portionNot separately identified in the supplied TG-RERA record; the project is described as a new project. RERA record
TG-RERA registration numberNot available in the supplied record. The plan approval number is not a TG-RERA registration number. RERA record Approvals record
Registration validityNot available; registration number and validity dates were not supplied. RERA record
Registered promoterORGANO COSMOSGREEN PRIVATE LIMITED (company). RERA record Corporate record
RERA statusThe project is labelled “New Project”; no TG-RERA registration number or registration-status certificate is supplied. RERA record

Land and geographic identity

ItemProject record
LocalityDEPALLE RERA record
Revenue villageDeepalle (also rendered “Depalle” in the RERA header). RERA record
Mandal / district / PINNawabpet / Mahabubnagar / 509340 RERA record
Project survey numbers as recorded42, 70, 44, 46, 47, 61, 66, 67, 68, 69 RERA record Land records
Additional survey numbers listed in the HMDA permit40, 43, 52, 59, 60 appear in the permit’s survey-number list; the supplied record does not explain their relationship to the project parcel.
SubdivisionsThe project-level identity lists base survey numbers only; a complete project subdivision schedule is not supplied. RERA record Land records
Site extentHMDA permit: plot area 192330.34 Sq. Mtrs and net plot area 190462.75 Sq. Mtrs. The RERA land record also reports total area 192330.34 sq m, affected area 1867.59 sq m and net area 190462.75 sq m. Land records
Boundaries filedEast: neighbours’ land; west: road; north: neighbours’ land; south: neighbours’ land. RERA record
Cadastral survey measurementsBhu Bharati GIS entries supplied for Survey No. 42 (71606.92 sq m) and Survey No. 47 (73245.73 sq m); these are whole-survey measurements, not a verified measurement of the project’s portions. Cadastral map

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); permit issued through Deepalle Gram Panchayat.
Principal approval2358/HMDA/SWBP/2026, revised building permission, approved 29/07/2026. Approvals record
File / application number017162/HMDA/04398/SWBP/SKP1/2026-REV Approvals record
Approved built-up areaRERA project fields report 37073.01 sq m as approved built-up area. The supplied permit extraction does not provide a complete total built-up-area figure. RERA record
Residential buildingsThe permit lists 35 named residential building groups, each described as Ground Floor + 1 Upper Floor. It also lists a main clubhouse (Ground Floor + 1 Upper Floor), a security block (Ground Floor), and an estate manager & health lounge (Ground Floor).
Building count / RERA blocksRERA fields report 194 total building units; the unit record describes 194 blocks, including 192 homes and 2 amenity units. The permit’s named building groups use a different grouping convention; the supplied record does not provide a reconciliation. RERA record RERA unit table
Sanctioned floors / parking levelsThe extracted permit identifies ground plus one upper floor for residential groups and the clubhouse. It does not establish basement, stilt or podium levels; parking is stated as an area, not a level-by-level schedule.
Unit countsRERA filing: 194 proposed building units (as per agreement) and 194 total building units (as per approved plan). The unit table separately records 394 1BHK units. The supplied record does not explain this count relationship. RERA record RERA unit table

Offering and status

ItemProject record
RERA-filed configuration1BHK; 394 units; filed saleable area 86.44 sq m per unit. RERA unit details RERA unit table
Booked / availablePortal-derived count: 0 booked / 394 available; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageThe project is labelled “New Project.” No independently verified site-progress evidence is supplied. RERA record RERA amenities
Completion deadlineHMDA permit deadline: construction to be completed before 29/07/2029; the Form B declaration also undertakes completion by 29-7-2029.
Commencement deadlineHMDA permit states construction is to commence before 25/01/2027.
Registration validityNot supplied; this is distinct from the building-permit completion deadline. RERA record
Occupancy / completion certificateNo completion or occupancy certificate is supplied; the permit says an occupancy certificate is required before occupation.

2. The project story

  • The supplied record describes a large residential development in Deepalle village, Nawabpet mandal, Mahabubnagar district. HMDA’s revised building permit covers numerous low-rise residential building groups alongside a main clubhouse, security block, and estate manager & health lounge. The permit describes the residential groups as ground floor plus one upper floor. RERA record
  • The RERA unit table identifies 1BHK homes, with 394 units recorded and none shown as booked in the portal-derived snapshot; the snapshot has no stated retrieval date. RERA also records 194 proposed building units, a count the supplied materials do not reconcile with the 394-unit configuration entry. These figures are reported as filed, not as independently verified completed inventory. RERA unit table RERA record
  • The permit sets a commencement deadline of 25/01/2027 and a completion deadline of 29/07/2029. No construction-progress inspection, completed-building certificate or occupancy certificate is included in the evidence supplied for this overview. The RERA amenities schedule records 0% progress for its listed items; this is a filed progress figure, not an independent site assessment. RERA amenities

3. Master plan, architecture & building design

  • The HMDA permit records a plot area of 192330.34 Sq. Mtrs, net plot area of 190462.75 Sq. Mtrs, a tot lot of 19477.87 Sq. Mtrs, and total parking area of 8560.77 Sq. Mtrs. The RERA fields separately report approved built-up area of 37073.01 sq m. These are distinct filed measures; the supplied materials do not establish a total FSI-counted area, gross built-up area, or a surveyed building-footprint total. RERA record
  • The permit identifies 35 named residential building groups, each stated as ground floor plus one upper floor. It also identifies the main clubhouse as ground floor plus one upper floor and the security block and estate manager & health lounge as ground-floor structures. The permit gives building heights of 7.35 m for residential blocks and the main clubhouse, 3.98 m for the security block, and 3.75 m for the estate manager & health lounge.
  • The permit’s listed sanctioned building groups are:
  • B11-E1-E7; B11a-E1 to E4; B12-W1-W6; B12a-W1-W4; B12b-W1 TO W5; B13a-E1 TO E8; B14-W1 TO W6; B14a-W1 TI W7; B27-E1 TO E4; B27a-E1 TO E6; B28-W1 TO W4; B28a-W1 TO W6; BLOCK 15a-E1 TO E6; BLOCK 16-W1 TO W6; BLOCK 16a-W1 TO W6; BLOCK 17-E1 TO E6; BLOCK 17a-E1 TO E5; BLOCK 18-W1 TO W6; BLOCK 18a-W1 TO W4; B13-E1 TO E6; BLOCK 21-E1 TO E7; BLOCK 22-W1 TO W7; BLOCK 23-E1 TO E7; BLOCK 24-W1 TO W7; BLOCK 25-E1 TO E3; BLOCK 26-W1 TO W6; BLOCK 26a-W1 TO W4; BLOCK 29-E1 TO E4; BLOCK 29a-E1 TO E6; BLOCK 30-W1 TO W4; BLOCK 30a-W1 TO W6; BLOCK 19-E1 TO E2; BLOCK 19a-E1 TO E5; BLOCK 20-W1 TO W5; and B15-E1 TO E6.
  • A building-permit extraction lists the clubhouse, security block, and estate manager & health lounge as associated structures. The permit also lists tot lot area, parking area, rainwater-harvesting pits and tree planting, but the supplied evidence does not provide a readable site layout from which to describe building footprints, internal road geometry, open-space distribution or phase boundaries.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK394039486.44 sq mNot measured from supplied drawingsNot supplied
  • The filed saleable area is not a drawing-measured carpet area. The floor-plan review record states that no plans were successfully measured; the one drawing-review item is marked failed. No carpet-area, room-dimension, balcony, utility or loading measurement can therefore be reported from the supplied drawing data. RERA unit details Floor plans
  • The available-unit count is portal-derived and has no stated as-of date. RERA unit table
  • The filing also lists the Club House, Health Loungue and Security Block in its unit table as non-sale homes with zero units; they are not included in the home count above. RERA unit table RERA unit table

5. Parking & vehicle circulation

  • HMDA’s permit records 8560.77 Sq. Mtrs as total parking area and requires approved cellar and stilt parking areas to be used exclusively for vehicle parking. The supplied extracts do not specify the number of car or two-wheeler spaces, resident or visitor allocations, accessible spaces, parking layout by level, or unit-specific allotments. A parking-area figure does not establish an individual buyer’s exclusive parking allocation.
  • The permit refers to an 18 mt. road width and requires a minimum approach-road width as shown in the technically approved plans. The extracted material does not provide the driveway, ramp, entrance/exit or pedestrian-circulation layout.

6. Amenities, recreation & open spaces

  • The permit provides the following project-level amenity and site provisions. These are sanctioned or permit-listed provisions, not evidence of completion. The RERA amenities schedule reports 0% progress for its listed items, and no independent completion verification is supplied. RERA amenities
FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Main clubhouseGround Floor + 1 Upper Floor; permit extraction lists commercial area 2501.58 and another listed figure 287.11 without a clear field label in the supplied extractPermit-listed; completion not verified
Health lounge / estate managerGround Floor; permit extraction lists commercial area 295.27Permit-listed; completion not verified
Tot lot / green area19477.87 Sq. MtrsPermit-listed; completion not verified
Trees9515Permit requirement; planting not verified
Green strip / parkRERA amenities schedule lists “Green Strip/TOT LOT/Park”RERA amenities0% filed progress; completion not verified
Community buildingsListed in the RERA amenities scheduleRERA amenities0% filed progress; completion not verified

7. Utilities, building services & safety

  • The RERA amenities schedule marks water supply, sewerage, storm-water drains, solid-waste management and disposal, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed amenity is reported at 0% progress. “Available: YES” is the filed status, not independent confirmation that the service is installed or operating. RERA amenities
  • HMDA’s permit lists 30 rainwater-harvesting pits, requires space for a transformer and a garbage house, and requires a tot lot to be fenced and maintained as greenery. It also includes a dual-piping-system condition and provisions concerning EV-charging infrastructure in parking places. The supplied record does not establish installation, capacity, operational status, water source or storage, STP capacity, sewer connection, electrical backup, lift provision, CCTV, fire-system installation or accessibility features.
  • The permit states that occupancy is not allowed before an occupancy certificate and requires completion-related certifications and safety provisions under its conditions. These are permit conditions; no occupancy certificate or completed fire/life-safety inspection is supplied here.

8. Location, access & connectivity

  • The official project location in the supplied RERA record is DEPALLE, revenue village Deepalle, Nawabpet mandal, Mahabubnagar district, PIN 509340. The HMDA permit likewise identifies Deepalle village and Nawabpet mandal. RERA record
  • The location dataset provides one sampled connectivity point: the nearest sampled Outer Ring Road interchange is listed at approximately 56.3 km. No approach-road names, public-transport details or other verified landmark distances are supplied. The permit refers to an 18 mt. road width but does not identify the road by name in the supplied extraction. Location record

9. Developer & development status

  • The registered promoter is ORGANO COSMOSGREEN PRIVATE LIMITED, identified as a company. The project filing gives GSTIN 36AAECO2730L1ZD; the party data also records company CIN U74210TG2001PTC036719. RERA record Corporate record Parties record
  • The promoter address recorded in the supplied party data is B, KHAIRATABAD, DEPALLE, DEPALLE, Nawabpet, Mahabubnagar, 509340. The available evidence does not provide a verified project contact number, email address or official website contact for buyer enquiries. Parties record
  • The Form B is a promoter declaration made by authorised representative B NAGESH KUMAR, dated 29-7-2026, and undertakes completion by 29-7-2029. HMDA’s permit states commencement before 25/01/2027 and completion before 29/07/2029. No independent construction-progress evidence or occupancy certificate is supplied.

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationProject is labelled “New Project”; a TG-RERA registration number and registration certificate are not available in the supplied record. RERA record
HMDA building permissionRevised building permission under 2358/HMDA/SWBP/2026, dated 29/07/2026, for the residential development and associated structures at Deepalle.
HMDA file / application017162/HMDA/04398/SWBP/SKP1/2026-REV
Building and commencement documentsTwo supplied HMDA permit/commencement-document extractions describe the approved building groups and project conditions; no completion certificate is supplied.
Form B declarationPromoter declaration dated 29-7-2026, signed by the authorised representative, including the stated completion undertaking.
Title and encumbrance submissionsProject-filed title report, encumbrance statement, and mortgage deed are listed in the record; their substantive review belongs in the title and encumbrance sections. Document index
Layout drawingThe supplied RERA document list identifies a layout-approval/building-floor-plan item, but it is marked unextracted; a readable approved layout drawing is not available in this evidence set.
Occupancy certificateNot supplied. HMDA’s permit states that an occupancy certificate is required before occupation.

Frequently asked questions

Is ORGANO DEPALLE EXTEN registered with Telangana RERA?

Yes. ORGANO DEPALLE EXTEN is registered with the Telangana Real Estate Regulatory Authority as P01400011340; the registration status is New Project.

Who is the developer of ORGANO DEPALLE EXTEN?

The promoter named in the RERA registration is ORGANO COSMOSGREEN PRIVATE LIMITED.

Where is ORGANO DEPALLE EXTEN located?

ORGANO DEPALLE EXTEN is in DEPALLE, Nawabpet, Mahabubnagar, Telangana (509340).

When will ORGANO DEPALLE EXTEN be completed?

The promoter's proposed date of completion filed with RERA is 29/07/2029. This is the promoter's declaration, not a guarantee.