Sign in

Supraja Sindhu Sarovar Phase - 2

KAMMILI SAMBA SHIVA RAO · Vikarabad · RERA P02100009951

SUPRAJA SINDHU SAROVAR PHASE - 2 is a plotted development in MOMINPET, Mominpet Mandal, Vikarabad District, developed by registered promoter KAMMILI SAMBA SHIVA RAO. The project filing records a land area of 52,103 sq. m, and the draft layout approval describes 182 plots; no plot-size configurations are stated. Its TG-RERA registration is P02100009951, and its proposed completion date is 23/08/2025.

01What we found

Period endedTG-RERA registration ran to 23 Aug 2025 - check its extension on TG-RERA
25documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Morangapally, Mominpet, Vikarabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSUPRAJA SINDHU SAROVAR PHASE - 2 RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase 2; the TG-RERA certificate identifies this phase, but a separate phase-boundary plan was not available in the supplied records RERA record
TG-RERA registrationP02100009951
Registration validity23/10/2021 to 23/08/2025; the certificate states a 3-year, 10-month term. This is the registration period, distinct from the project completion undertaking below.
RERA status in supplied recordRegistered; the certificate records no extension. The supplied record does not establish a current extension or renewed registration.
Registered promoterKAMMILI SAMBA SHIVA RAO RERA record

Land and geographic identity

ItemRecord
LocalityMOMINPET in the RERA filing; the layout approval identifies Morangapally Gram Panchayat. RERA filing
Revenue villageMorangapally (also rendered as Morangapally/Morangapalle in supplied records); the filing identifies Morangapally. RERA record RERA filing
Mandal / district / PINMominpet / Vikarabad / 501202 RERA record
Project survey numbers18/P and 19/P RERA record Land records
Project survey subdivisionsNo further subdivision identifiers are specified in the RERA project identity; the filing uses the parent survey references 18/P and 19/P. RERA filing Land records
Site extentThe project filing records total and net area as 52,103 sq. m. The draft layout approval separately states Ac.12-35 Cents or Ac.12.875 Cents; 62,315.00 Sq. Yds. RERA filing Land records
Boundaries in RERA filingEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityDirector of Town and Country Planning (DTCP); the draft layout document states delegation to Morangapally Gram Panchayat. Approvals record
Principal layout approvalDraft- TLP.No.233/2021/H, dated 23-08-2021; file L.Roc.No.376/2083/2021/e-Panchayat. The document describes this as a draft technical layout-pattern approval. Approvals record
Layout scale182 plots in the draft layout approval
Land-use split stated in the draft approvalLayout area: Ac.12.875 Cents; 62,315.00 Sq. Yds.; open space: 10.00%, Ac.1.287 Cents; 6,229.08 Sq. Yds.; roads: 31.72%, Ac.4.084 Cents; 19,766.56 Sq. Yds.; plotted area: 58.28%, Ac.7.504 Cents; 36,319.36 Sq. Yds.; mortgage area: 15.32%, Ac.1.150 Cents; 5,566.00 Sq. Yds.
Approved built-up areaNot disclosed in the supplied project records; the development is a plotted layout, not a building project. RERA filing
Buildings, floors and parking levelsNo building count, floor configuration, or parking levels are specified in the supplied records. Document index
Plot countThe draft layout approval states 182 plots; a current plot inventory or RERA-reported sale inventory was not supplied.

Offering and status

ItemRecord
Offered productPlots; no plot-size bands or individual plot-area schedule is supplied. RERA record
Booked / available countsNot disclosed in the supplied records. Document index
Construction / site-development stageThe Form-B declaration states that “Site Development work was completed before 23 rd August 2025.” This is a promoter declaration, not independent site verification.
Completion dateThe RERA filing gives 23/08/2025 as the proposed completion date. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. For this plotted project, the records do not establish an OC status by plot or phase. Document index

2. The project story

SUPRAJA SINDHU SAROVAR PHASE - 2 is registered with TG-RERA as a plotted development in revenue village Morangapally, Mominpet Mandal, Vikarabad District, under survey numbers 18/P and 19/P. The project record names MOMINPET as the locality; the layout approval identifies Morangapally Gram Panchayat. The approved layout pattern describes 182 plots, with land also set aside for roads and open space. RERA record RERA filing RERA filing

The project completion date entered in the RERA filing is 23/08/2025. Separately, the Form-B affidavit signed by the promoter’s managing partners states that site-development work was completed before that date. The supplied material does not include an independent inspection confirming that declaration or an occupancy/completion certificate. RERA record

3. Master plan, architecture & building design

The project is a plotted layout, so the supplied design evidence concerns plot arrangement and layout land use rather than apartment buildings, floors, or building services. The draft layout approval identifies 182 plots and records a layout-area breakdown: 10.00% open space, 31.72% roads, 58.28% plotted area, and a 15.32% mortgage area. The approval gives those areas as 6,229.08 Sq. Yds. open space, 19,766.56 Sq. Yds. roads, 36,319.36 Sq. Yds. plotted area, and 5,566.00 Sq. Yds. mortgage area, respectively.

The approval calls for the open space and roads to be transferred to the Gram Panchayat by registered gift deed before final layout release. It also identifies Plot Nos. 42 to 45 and 48 to 65 as the plots proposed to be mortgaged to the Gram Panchayat as security for layout-development conditions; the supplied evidence does not establish their present release status.

The approval describes infrastructure and landscape works, including road formation, drains, nala channelization, avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal, and protected water supply. These are approval conditions or prescribed works; the supplied records do not independently verify their completion. No detailed drawing-derived plot dimensions, road widths, or plot-size schedule is available.

4. Homes, configurations & floor plans

The offering is plotted land, not apartments. The draft layout approval states a total of 182 plots, but the supplied records do not provide a plot-by-plot schedule, plot-size bands, booked/available counts, or RERA-filed saleable areas. RERA record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots182 (draft-layout approval)Not disclosedNot disclosedNot disclosedNot applicableNot disclosed

The supplied floor-plan dataset contains two drawings, with 0 measured, 2 scans pending, and no apartment plans. Accordingly, no software-measured areas or internal room dimensions can be reported. Floor plans

5. Parking & vehicle circulation

The supplied records do not specify parking-space counts, visitor or accessible parking, parking allocation to individual plots, or EV facilities. The draft layout approval requires roads to be formed and opened for access to neighbouring sites, but no detailed road-width or vehicle-circulation drawing was supplied. A parking bay or exclusive parking right cannot be established from the available evidence. Document index

6. Amenities, recreation & open spaces

The draft layout approval lists open-space planting and rainwater-harvesting pits among its conditions and identifies open space as 10.00% of the stated layout area. The RERA amenity register marks some items “YES,” but the recorded progress figures shown are 0; these entries do not establish completed facilities. RERA amenities

Open space / park / green strip
Description / sizeOpen space: 10.00%, Ac.1.287 Cents; 6,229.08 Sq. Yds.
Evidence sourceDraft layout approval; RERA amenity register RERA amenities
Declared progress / verified statusApproval condition and RERA “YES” entry; progress recorded as 0. No independent completion verification supplied.
Avenue planting / greenery
Description / sizeAvenue plantation in public open spaces
Evidence sourceDraft layout approval
Declared progress / verified statusRequired in approval conditions; completion not independently verified.
Internal roads and footpaths
Description / sizeRoad area: 31.72%, Ac.4.084 Cents; 19,766.56 Sq. Yds.
Evidence sourceDraft layout approval; RERA amenity register RERA amenities
Declared progress / verified statusRERA “YES” entry for internal roads and footpaths; progress recorded as 0. No independent completion verification supplied.
Street lighting
Description / sizeListed as a layout utility
Evidence sourceDraft layout approval; RERA amenity register RERA amenities
Declared progress / verified statusApproval condition and RERA “YES” entry; progress recorded as 0. No independent completion verification supplied.
Rainwater harvesting
Description / sizeRainwater-harvesting pits required
Evidence sourceDraft layout approval; RERA amenity register RERA amenities
Declared progress / verified statusApproval condition and RERA “YES” entry; progress recorded as 0. No independent completion verification supplied.
Community buildings
Description / sizeListed in the RERA amenity register
Evidence sourceRERA amenity register RERA amenities
Declared progress / verified statusProgress recorded as 0; no facility description, size, or completion evidence supplied.

No clubhouse or indoor recreation facility is identified in the supplied evidence.

7. Utilities, building services & safety

The draft layout approval requires a protected water-supply system, sewerage-disposal system, storm-water drainage and nala channelization, street lighting and electricity facilities, rainwater-harvesting pits, and road formation. These are stated approval requirements; the supplied records do not establish their installation, capacity, operating status, or independent inspection.

The RERA amenity register includes water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and electrical meter/sub-station/receiving-station items, but the listed progress figures are 0 and no supporting system specifications or completion certificates were supplied. No fire-system design, accessibility provisions, CCTV, security plan, or utility-capacity data is available in the supplied records. RERA amenities

8. Location, access & connectivity

The project’s registered geographic identity is Morangapally, Mominpet Mandal, Vikarabad District, Telangana, PIN 501202, in survey numbers 18/P and 19/P. The RERA address fields use MOMINPET as the locality, and the layout approval identifies Morangapally Gram Panchayat. RERA record RERA filing

The supplied location record gives coordinates 17.4907828, 77.8734425 and lists the nearest sampled Outer Ring Road interchange at approximately 41.2 km. No approach-road names, public-transport details, or additional landmark distances are supplied. Location record

9. Developer & development status

The TG-RERA registration identifies KAMMILI SAMBA SHIVA RAO as the registered promoter. The RERA filing describes the promoter organization as a partnership and gives GSTIN 36ACIFS8103N1ZO; the available records do not provide a verified corporate registration number or registered-office contact details. RERA record RERA filing Corporate record

The filing lists M/s. SRI SUPRAJA INFRACON and M/s. SINDHUJA DEVELOPERS as revenue-share landowners/promoter-side parties. The Form-B affidavit names those two firms as promoters and is signed by managing partners Teegala Janga Reddy and Tudi Praveen. These are filing declarations; the supplied record does not include a current site inspection confirming the declared completion of site-development work. Land records Parties record

The RERA filing’s proposed completion date is 23/08/2025. The Form-B declaration states that site-development work was completed before 23 August 2025; no occupancy or completion certificate is present in the supplied documents. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm “C” certificate for P02100009951, issued 11/08/2025; recorded validity 23/10/2021–23/08/2025. The certificate states a 70% separate-account condition and no extension is recorded in the supplied extraction.
Layout approvalDraft Technical Layout Pattern approval Draft- TLP.No.233/2021/H, dated 23-08-2021, issued by the Director of Town and Country Planning; file L.Roc.No.376/2083/2021/e-Panchayat. It identifies survey numbers 18/P and 19/P, 182 plots, and conditions for development and final layout release.
Form-B declarationPromoter affidavit dated 04th, day of AUG 2025, including the promoter’s completion statement and fund-management declarations.
Layout plan / final layout releaseA separate stamped final-layout plan or final-release record is not included in the supplied documents. Document index
Occupancy / completion certificateNo such certificate is included in the supplied documents. Document index
HMDA layout lookupThe supplied HMDA evidence records the public DPMS approved-layout lookup as unavailable; this is an access limitation, not a determination about approval. HMDA

Frequently asked questions

Is SUPRAJA SINDHU SAROVAR PHASE - 2 registered with Telangana RERA?

Yes. SUPRAJA SINDHU SAROVAR PHASE - 2 is registered with the Telangana Real Estate Regulatory Authority as P02100009951; the registration status is New Project.

Who is the developer of SUPRAJA SINDHU SAROVAR PHASE - 2?

The promoter named in the RERA registration is KAMMILI SAMBA SHIVA RAO.

Where is SUPRAJA SINDHU SAROVAR PHASE - 2 located?

SUPRAJA SINDHU SAROVAR PHASE - 2 is in MOMINPET, Morangapally, Vikarabad, Telangana (501202).

When will SUPRAJA SINDHU SAROVAR PHASE - 2 be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Mominpet