Aliens Hub
ALIENS SMART CITY PVT LTD · Rangareddy · RERA P02400002497
ALIENS HUB is a plotted development in Chennaram, Thalakondapally Mandal, Ranga Reddy District, developed by registered promoter ALIENS SMART CITY PVT LTD. The filed draft layout describes 212 plots across Ac. 33.10 Cents; 160204.00 Sq. Yds.; the record does not state a tower or floor count or plot configurations. The project is registered with TG-RERA under P02400002497, and the promoter’s completion undertaking states 02 August 2023.
More from Aliens Smart City Pvt Ltd · 9 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
14 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | ALIENS HUB RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Not separately identified in the supplied record. The filed layout approval describes a 212-plot layout. |
| TG-RERA registration | P02400002497 RERA record |
| Registration validity | 31/01/2021 to 02/08/2023; the supplied certificate records a two-year validity and says registration may be extended by the Authority. No extension is recorded in the supplied evidence. Registration validity is distinct from the completion undertaking and from any occupancy/completion certificate. Approvals record |
| Registered promoter | ALIENS SMART CITY PVT LTD RERA record Corporate record |
| RERA status | The registration certificate records registration; its stated validity ended on 02/08/2023. Current registration status is not established by the supplied record. Approvals record |
Land and geographic identity
| Item | Supplied record |
|---|---|
| Locality / revenue village | Chennaram; the filed draft layout names Chennaram Gram Panchayat. RERA record RERA filing |
| Mandal | Thalakondapally; the draft layout spells it “Talakondapally.” RERA record |
| District | Ranga Reddy; the draft layout spells it “Rangareddy.” RERA record |
| PIN | 509206 RERA record |
| Project survey numbers / subdivisions | SY NO 30/9, 31/P AND32/P (RERA project identity); the registration certificate lists SY NO 30/9, 31/P, 32/P; the filed draft layout lists 30/P, 31/P, 32/P. RERA record |
| RERA-declared site area | Total area 133951 sqmts; net area 133951.00 sqmts; affected area recorded as 0 sqmts. RERA filing |
| Filed draft-layout area | Ac. 33.10 Cents; 160204.00 Sq. Yds. |
| Boundaries | East, west, north and south are each recorded as OTHER LAND. RERA filing |
Development identity
| Item | Supplied record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); the filed instrument says the draft layout pattern was delegated to Chennaram Gram Panchayat. Approvals record |
| Principal approval number / date | Draft - TLP.No.190/2020/H, approved date 15-09-2020; RERA filing lists plan approval number 190/2020/H. Approvals record RERA filing |
| Approval recorded | Draft Technical Layout Pattern approval for a 212-plot layout, subject to its stated conditions and a subsequent final-layout process. |
| Approved built-up area | 133951 sqmts is recorded as approved built-up area in the RERA filing; the supplied evidence does not explain its measurement basis for this plotted project. RERA filing |
| Buildings / floor configuration | Not disclosed in the supplied evidence; the project is recorded as a plotted layout. RERA filing |
| Parking | A parking count, parking layout and parking allocation are not established by the supplied evidence. |
Offering and status
| Item | Supplied record |
|---|---|
| Unit type and count | Plots; the filed draft layout states 212 plots. RERA record |
| Plot size range / filed unit sizes | RERA-filed plot-size schedule is not available in the supplied evidence. |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Construction / infrastructure progress | The RERA filing reports internal roads and footpaths at 50%, sewerage, storm-water drains and solid-waste management/disposal at 10% each, and several other listed works at 0%. These are filing-reported percentages, not independent site verification. RERA amenities |
| Promoter completion undertaking | Form B records an undertaking that the project shall be completed by 02 August 2023; the supplied extraction renders the declaration date as “Z4thday of DeC2020.” |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied evidence. Document index Approvals record |
2. The project story
ALIENS HUB is registered as a plotted development in Chennaram, Thalakondapally Mandal, Ranga Reddy District. The RERA-filed draft layout describes 212 plots and divides the layout into plotted land, roads, open space and plots reserved for Gram Panchayat mortgage. It is a land-layout offering, not an apartment or multi-storey building project in the supplied record. RERA record
The promoter’s Form B states a completion undertaking of 02 August 2023. The RERA-filed progress figures report partial progress for internal roads and footpaths, sewerage, storm-water drains and solid-waste management/disposal, while the listed percentages for several other works are zero. These are reported figures only; no independent site inspection or completion certification is provided here. The supplied evidence identifies no occupancy or completion certificate. RERA amenities Document index
3. Master plan, architecture & building design
The filed approval is a Draft Technical Layout Pattern for 212 plots in Chennaram, covering the survey numbers stated in the layout document as 30/P, 31/P and 32/P. It records this land-use split:
| Layout component | Filed area | Filed share |
|---|---|---|
| Layout area | Ac. 33.10 Cents; 160204.00 Sq. Yds. | — |
| Plotted area | Ac. 19.676 Cents; 95231.84 Sq. Yds. | 59.45 % |
| Road area | Ac. 10.114 Cents; 48951.76 Sq. Yds. | 30.55 % |
| Open space | Ac. 3.31 Cents; 16020.40 Sq. Yds | 10.00 % |
| Mortgage area | Ac. 3.128 Cents; 15139.52 Sq. Yds. | 15.89 % |
The approval identifies Plot Nos.24 to 38, 40,41 as plots to be mortgaged in favour of the Gram Panchayat. It says the layout is to be demarcated on the ground and the mortgage completed, after which the specified records are to be submitted for release of the draft layout for development works. After those works and conditions are completed, proposals are to be submitted through the Gram Panchayat for final layout approval.
The evidence does not supply a detailed final layout drawing, individual plot schedule, internal-road dimensions, utility-land schedule, building design or building-floor plans. The RERA filing records approved built-up area as 133951 sqmts, but does not explain its measurement basis in the supplied material. The draft-layout approval and the RERA-filed area are reported as recorded; no independent measurement is supplied. RERA filing
4. Homes, configurations & floor plans
ALIENS HUB is registered as a plotted development. The supplied evidence does not provide a RERA-filed plot-size schedule, plot-wise inventory, or booked and available plot counts. The filed approval provides the total plot count, but not the individual plot areas. RERA record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 212 (filed draft-layout count) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are listed, but neither has been measured; both are pending scan review. Accordingly, no software-measured plot, room or carpet-area figures are available. Floor plans
The promoter/vendor material lists various plot-size descriptions, including “saleable 200 - 1500+ Sq yds” and individual entries such as 175, 198, 200, 300, 400 and 1665 sq.yrd, as well as “500 sq.ft.” These are promoter-marketed descriptions, not a RERA-filed plot schedule in the supplied evidence. Promoter website
5. Parking & vehicle circulation
The supplied material does not establish sanctioned parking counts, visitor or accessible parking, parking locations, vehicle entry and exit points, internal driveway arrangements, or parking allocation to individual plots. A plot count or a road area in the draft-layout approval does not establish parking provision or exclusive parking rights. Document index
6. Amenities, recreation & open spaces
The RERA filing lists the following project works and progress percentages. These are filing-reported status figures, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Not further specified | RERA-filed project progress RERA amenities | 50% reported; not independently verified |
| Water supply | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Not further specified | RERA-filed project progress RERA amenities | 10% reported; not independently verified |
| Storm-water drains | Not further specified | RERA-filed project progress RERA amenities | 10% reported; not independently verified |
| Green strip / tot lot / park | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Street lighting | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Community buildings | No further description or size supplied | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Treatment and disposal of sewage and sullage water | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Solid-waste management and disposal | Not further specified | RERA-filed project progress RERA amenities | 10% reported; not independently verified |
| Water conservation / rainwater harvesting | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Energy management | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Fire protection and fire safety requirements | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Electrical meter room, sub-station, receiving station | Not further specified | RERA-filed project progress RERA amenities | 0% reported; not independently verified |
| Aggregate recreational open space | No further description supplied; draft-layout approval records open space of Ac. 3.31 Cents; 16020.40 Sq. Yds | RERA-filed project progress RERA amenities; draft-layout approval | 0% reported; not independently verified |
The promoter/vendor material markets facilities including a clubhouse, golf course, nature park, pools, sports and recreation features, camping and an amphitheatre. The supplied evidence does not establish these as sanctioned or delivered facilities for this registered project, so they are not treated here as confirmed project amenities. Promoter website
7. Utilities, building services & safety
The RERA filing includes water supply, sewerage, storm-water drainage, solid-waste management, rainwater harvesting, energy management, fire-safety requirements and electrical meter-room/sub-station/receiving-station works. The reported progress is 0% for water supply, rainwater harvesting, energy management, fire safety and electrical works; 10% for sewerage, storm-water drains and solid-waste management/disposal. No capacities, water sources, treatment specifications, fire-system details, utility designs or independent completion evidence are provided. RERA amenities
No building-specific services such as lifts or escape stairs are disclosed; the project is recorded as plotted development. No accessibility plan, security system, CCTV provision or EV-charging provision is established in the supplied RERA-filed material. RERA record RERA amenities Document index
8. Location, access & connectivity
The registered project location is Chennaram, Thalakondapally Mandal, Ranga Reddy District, Telangana, PIN 509206. The filed draft-layout document locates the layout at Chennaram Gram Panchayat. RERA record
A separate supplied location record lists nearby points and distances, including Financial District (Nanakramguda) at 1.2 km, IndusInd Bank at 0.4 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, and Nanakramguda Govt primary school at 0.5 km. These are location-record distances; no route or travel-time methodology is supplied. Location record
The promoter/vendor material describes the location as “Srisailam” and lists travel-time claims for various destinations. Those claims are promoter-marketed material, not used here as registered-location or verified connectivity facts. Promoter website
9. Developer & development status
The registered promoter is ALIENS SMART CITY PVT LTD, a private limited company. The supplied corporate record gives GSTIN 36AAKCA0134E1Z6. The RERA-filed Form B is declared by Venkat Prasanna Challa, representing “M/s Aliens smart city Ltd”; the project’s registered promoter name is as recorded above. Corporate record
The RERA filing reports registration from 31/01/2021 through 02/08/2023. Form B records a completion undertaking of 02 August 2023. The supplied evidence does not record an extension, a completion certificate, or an occupancy certificate; it also does not provide an independently verified construction assessment. Approvals record
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate, Form C | Project ALIENS HUB, registration P02400002497, promoter Aliens Smart City Pvt Ltd, stated validity 31/01/2021–02/08/2023. |
| Draft Technical Layout Pattern approval | DTCP instrument Draft - TLP.No.190/2020/H, dated 15-09-2020, for a 212-plot layout; the document describes a subsequent final-layout process and conditions. |
| RERA-filed plan approval number | 190/2020/H. Approvals record |
| Form B declaration | Promoter declaration concerning title basis, encumbrances, project-account arrangements and pending approvals; records a completion undertaking of 02 August 2023. This is a promoter declaration, not independent verification of those matters. |
| Progress disclosures | Fourteen RERA-filed works/facility categories with reported progress percentages, reproduced above. RERA amenities |
| Layout-plan drawing | A layout-plan document is listed in the RERA filing, but the supplied record says it was not extracted. The detailed drawing content therefore cannot be summarized here. Document index |
| Occupancy/completion certificate | No such certificate is identified in the supplied evidence. Document index |
1. Project at a glance
Project identity
Registered project name: ALIENS HUB
Project type: Plotted development / plotted layout
Phase / registered portion: Not separately identified in the supplied record. The filed layout approval describes a 212-plot layout.
TG-RERA registration: P02400002497
Registration validity: 31/01/2021 to 02/08/2023; the supplied certificate records a two-year validity and says registration may be extended by the Authority. No extension is recorded in the supplied evidence. Registration validity is distinct from the completion undertaking and from any occupancy/completion certificate.
Registered promoter: ALIENS SMART CITY PVT LTD
RERA status: The registration certificate records registration; its stated validity ended on 02/08/2023. Current registration status is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Chennaram; the filed draft layout names Chennaram Gram Panchayat.
Mandal: Thalakondapally; the draft layout spells it “Talakondapally.”
District: Ranga Reddy; the draft layout spells it “Rangareddy.”
PIN: 509206
Project survey numbers / subdivisions: SY NO 30/9, 31/P AND32/P (RERA project identity); the registration certificate lists SY NO 30/9, 31/P, 32/P; the filed draft layout lists 30/P, 31/P, 32/P.
RERA-declared site area: Total area 133951 sqmts; net area 133951.00 sqmts; affected area recorded as 0 sqmts.
Filed draft-layout area: Ac. 33.10 Cents; 160204.00 Sq. Yds.
Boundaries: East, west, north and south are each recorded as OTHER LAND.
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); the filed instrument says the draft layout pattern was delegated to Chennaram Gram Panchayat.
Principal approval number / date: Draft - TLP.No.190/2020/H, approved date 15-09-2020; RERA filing lists plan approval number 190/2020/H.
Approval recorded: Draft Technical Layout Pattern approval for a 212-plot layout, subject to its stated conditions and a subsequent final-layout process.
Approved built-up area: 133951 sqmts is recorded as approved built-up area in the RERA filing; the supplied evidence does not explain its measurement basis for this plotted project.
Buildings / floor configuration: Not disclosed in the supplied evidence; the project is recorded as a plotted layout.
Parking: A parking count, parking layout and parking allocation are not established by the supplied evidence.
Offering and status
Unit type and count: Plots; the filed draft layout states 212 plots.
Plot size range / filed unit sizes: RERA-filed plot-size schedule is not available in the supplied evidence.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / infrastructure progress: The RERA filing reports internal roads and footpaths at 50%, sewerage, storm-water drains and solid-waste management/disposal at 10% each, and several other listed works at 0%. These are filing-reported percentages, not independent site verification.
Promoter completion undertaking: Form B records an undertaking that the project shall be completed by 02 August 2023; the supplied extraction renders the declaration date as “Z4thday of DeC2020.”
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied evidence.
2. The project story
ALIENS HUB is registered as a plotted development in Chennaram, Thalakondapally Mandal, Ranga Reddy District. The RERA-filed draft layout describes 212 plots and divides the layout into plotted land, roads, open space and plots reserved for Gram Panchayat mortgage. It is a land-layout offering, not an apartment or multi-storey building project in the supplied record.
The promoter’s Form B states a completion undertaking of 02 August 2023. The RERA-filed progress figures report partial progress for internal roads and footpaths, sewerage, storm-water drains and solid-waste management/disposal, while the listed percentages for several other works are zero. These are reported figures only; no independent site inspection or completion certification is provided here. The supplied evidence identifies no occupancy or completion certificate.
3. Master plan, architecture & building design
The filed approval is a Draft Technical Layout Pattern for 212 plots in Chennaram, covering the survey numbers stated in the layout document as 30/P, 31/P and 32/P. It records this land-use split:
| Layout component | Filed area | Filed share |
|---|---|---|
| Layout area | Ac. 33.10 Cents; 160204.00 Sq. Yds. | — |
| Plotted area | Ac. 19.676 Cents; 95231.84 Sq. Yds. | 59.45 % |
| Road area | Ac. 10.114 Cents; 48951.76 Sq. Yds. | 30.55 % |
| Open space | Ac. 3.31 Cents; 16020.40 Sq. Yds | 10.00 % |
| Mortgage area | Ac. 3.128 Cents; 15139.52 Sq. Yds. | 15.89 % |
The approval identifies Plot Nos.24 to 38, 40,41 as plots to be mortgaged in favour of the Gram Panchayat. It says the layout is to be demarcated on the ground and the mortgage completed, after which the specified records are to be submitted for release of the draft layout for development works. After those works and conditions are completed, proposals are to be submitted through the Gram Panchayat for final layout approval.
The evidence does not supply a detailed final layout drawing, individual plot schedule, internal-road dimensions, utility-land schedule, building design or building-floor plans. The RERA filing records approved built-up area as 133951 sqmts, but does not explain its measurement basis in the supplied material. The draft-layout approval and the RERA-filed area are reported as recorded; no independent measurement is supplied.
4. Homes, configurations & floor plans
ALIENS HUB is registered as a plotted development. The supplied evidence does not provide a RERA-filed plot-size schedule, plot-wise inventory, or booked and available plot counts. The filed approval provides the total plot count, but not the individual plot areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 212 (filed draft-layout count) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are listed, but neither has been measured; both are pending scan review. Accordingly, no software-measured plot, room or carpet-area figures are available.
The promoter/vendor material lists various plot-size descriptions, including “saleable 200 - 1500+ Sq yds” and individual entries such as 175, 198, 200, 300, 400 and 1665 sq.yrd, as well as “500 sq.ft.” These are promoter-marketed descriptions, not a RERA-filed plot schedule in the supplied evidence.
5. Parking & vehicle circulation
The supplied material does not establish sanctioned parking counts, visitor or accessible parking, parking locations, vehicle entry and exit points, internal driveway arrangements, or parking allocation to individual plots. A plot count or a road area in the draft-layout approval does not establish parking provision or exclusive parking rights.
6. Amenities, recreation & open spaces
The RERA filing lists the following project works and progress percentages. These are filing-reported status figures, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Not further specified | RERA-filed project progress | 50% reported; not independently verified |
| Water supply | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Not further specified | RERA-filed project progress | 10% reported; not independently verified |
| Storm-water drains | Not further specified | RERA-filed project progress | 10% reported; not independently verified |
| Green strip / tot lot / park | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Street lighting | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Community buildings | No further description or size supplied | RERA-filed project progress | 0% reported; not independently verified |
| Treatment and disposal of sewage and sullage water | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Solid-waste management and disposal | Not further specified | RERA-filed project progress | 10% reported; not independently verified |
| Water conservation / rainwater harvesting | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Energy management | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Fire protection and fire safety requirements | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Electrical meter room, sub-station, receiving station | Not further specified | RERA-filed project progress | 0% reported; not independently verified |
| Aggregate recreational open space | No further description supplied; draft-layout approval records open space of Ac. 3.31 Cents; 16020.40 Sq. Yds | RERA-filed project progress; draft-layout approval | 0% reported; not independently verified |
The promoter/vendor material markets facilities including a clubhouse, golf course, nature park, pools, sports and recreation features, camping and an amphitheatre. The supplied evidence does not establish these as sanctioned or delivered facilities for this registered project, so they are not treated here as confirmed project amenities.
7. Utilities, building services & safety
The RERA filing includes water supply, sewerage, storm-water drainage, solid-waste management, rainwater harvesting, energy management, fire-safety requirements and electrical meter-room/sub-station/receiving-station works. The reported progress is 0% for water supply, rainwater harvesting, energy management, fire safety and electrical works; 10% for sewerage, storm-water drains and solid-waste management/disposal. No capacities, water sources, treatment specifications, fire-system details, utility designs or independent completion evidence are provided.
No building-specific services such as lifts or escape stairs are disclosed; the project is recorded as plotted development. No accessibility plan, security system, CCTV provision or EV-charging provision is established in the supplied RERA-filed material.
8. Location, access & connectivity
The registered project location is Chennaram, Thalakondapally Mandal, Ranga Reddy District, Telangana, PIN 509206. The filed draft-layout document locates the layout at Chennaram Gram Panchayat.
A separate supplied location record lists nearby points and distances, including Financial District (Nanakramguda) at 1.2 km, IndusInd Bank at 0.4 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, and Nanakramguda Govt primary school at 0.5 km. These are location-record distances; no route or travel-time methodology is supplied.
The promoter/vendor material describes the location as “Srisailam” and lists travel-time claims for various destinations. Those claims are promoter-marketed material, not used here as registered-location or verified connectivity facts.
9. Developer & development status
The registered promoter is ALIENS SMART CITY PVT LTD, a private limited company. The supplied corporate record gives GSTIN 36AAKCA0134E1Z6. The RERA-filed Form B is declared by Venkat Prasanna Challa, representing “M/s Aliens smart city Ltd”; the project’s registered promoter name is as recorded above.
The RERA filing reports registration from 31/01/2021 through 02/08/2023. Form B records a completion undertaking of 02 August 2023. The supplied evidence does not record an extension, a completion certificate, or an occupancy certificate; it also does not provide an independently verified construction assessment.
10. Approvals, official records & documents
TG-RERA registration certificate, Form C: Project ALIENS HUB, registration P02400002497, promoter Aliens Smart City Pvt Ltd, stated validity 31/01/2021–02/08/2023.
Draft Technical Layout Pattern approval: DTCP instrument Draft - TLP.No.190/2020/H, dated 15-09-2020, for a 212-plot layout; the document describes a subsequent final-layout process and conditions.
RERA-filed plan approval number: 190/2020/H.
Form B declaration: Promoter declaration concerning title basis, encumbrances, project-account arrangements and pending approvals; records a completion undertaking of 02 August 2023. This is a promoter declaration, not independent verification of those matters.
Progress disclosures: Fourteen RERA-filed works/facility categories with reported progress percentages, reproduced above.
Layout-plan drawing: A layout-plan document is listed in the RERA filing, but the supplied record says it was not extracted. The detailed drawing content therefore cannot be summarized here.
Occupancy/completion certificate: No such certificate is identified in the supplied evidence.
Frequently asked questions
Is ALIENS HUB registered with Telangana RERA?
Yes. ALIENS HUB is registered with the Telangana Real Estate Regulatory Authority as P02400002497; the registration status is New Project.
Who is the developer of ALIENS HUB?
The promoter named in the RERA registration is ALIENS SMART CITY PVT LTD.
Where is ALIENS HUB located?
ALIENS HUB is in CHENNARAM, Thalakondapally, Rangareddy, Telangana (509206).
When will ALIENS HUB be completed?
The promoter's proposed date of completion filed with RERA is 02/08/2023. This is the promoter's declaration, not a guarantee.