Bsr Enclave Phase II

BAKAM · Mancherial · RERA P01200009619

BSR ENCLAVE PHASE II is a plotted development in SOMAGUDEM, Bellampally mandal, Mancherial district. The registered promoter is BAKAM SRINIVAS RAO. The RERA-filed land area is 7837.60 sq m, and the filed draft layout describes 20 (Twenty Plots); building or floor configuration and plot-size range are not disclosed. The TG-RERA registration is P01200009619, with a proposed completion date of 15/09/2025.

01What we found

Period endedTG-RERA registration ran to 15 Sep 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameBSR ENCLAVE PHASE II RERA record
Project typePlotted development RERA record
Phase / registered portion“Phase II” is in the registered project name. The materials describe a residential plotted layout; a more detailed phase boundary is not disclosed. RERA record
TG-RERA registrationP01200009619 RERA record
Registration validity15/09/2023–15/09/2025; the supplied certificate says registration was for two years and does not record an extension. Registration validity is distinct from the stated completion date. RERA record
Registered promoterBAKAM SRINIVAS RAO on the certificate; the project identity record gives BAKAM. RERA record
RERA statusThe project record labels it “On-Going Project.” The supplied registration certificate records the validity period above; current registration status is not established by that certificate. RERA record

Land and geographic identity

ItemProject record
Locality / streetSOMAGUDEM RERA record RERA filing
Revenue villageAkenpally; approval documents also spell it “Akenpalli” or “Akenapalli.” RERA record RERA filing
Mandal / district / PINBellampally / Mancherial / 504251 RERA record
Project survey numbers and subdivisions3 Paiki b/1/1 and 3 Paiki c/2/2/1 (3/20/3). The layout documents also identify 3/20/3 as per AD SLR. RERA record
RERA-filed site extentTotal area and net area each recorded as 7837.60 sqmts; affected area recorded as 0.00 sqmts. RERA filing
BoundariesEast: RAILWAY LINE; West: NH ROAD; North: OPEN LAND OF K SATYANARAYA; South: APPROVED LAYOUT. RERA filing

Development identity

ItemProject record
Sanctioning authority / principal approvalDistrict Town & Country Planning Officer, Mancherial; Draft TLP No. 12/2023/DTCPO/MNCL, approved date recorded as 15-09-2023. The filing lists plan approval number 12/2023/DTCPO/MNCL. Approvals record
Approved built-up area5805.87 sqmts as recorded in the project filing. A building-specific breakdown is not supplied. RERA filing
Building / floor configurationNot disclosed in the supplied records. This is a plotted layout, not a documented apartment-building scheme. RERA record Document index
RERA-filed plot countNot stated in the supplied project fields. The filed draft layout document describes 20 (Twenty Plots); another filed drawing record describes a 30-plot schedule.
Mortgage area900 sqmts in the project filing. The layout record identifies plots 14, 15, 19 and 20 as mortgaged to Somagudem Gram Panchayat. RERA filing

Offering and status

ItemProject record
OfferingResidential plots; plot-level areas and inventory counts are not supplied in the RERA project fields provided here.
Booked / available countsNot disclosed in the supplied evidence.
Construction stage / progressThe project identity record gives completeness as 80%; the basis, reporting date and independent site-verification status are not supplied. RERA record
Completion datesOriginal and revised proposed completion dates are both 15/09/2025. RERA record
OC / completion certificate statusNo project occupancy certificate is identified in the supplied materials. This is a plotted layout; a layout-work completion record is described separately below. Document index

The project story

BSR ENCLAVE PHASE II is registered as a plotted development in Somagudem, revenue village Akenpally, Bellampally mandal, Mancherial district. The RERA filing identifies the land as survey subdivisions 3 Paiki b/1/1 and 3 Paiki c/2/2/1 (3/20/3) and records a total/net site area of 7837.60 sqmts. The supplied registration certificate names BAKAM SRINIVAS RAO as promoter. RERA record RERA filing

The filed layout material describes residential plots, internal roads and open space. One draft layout approval record states 20 (Twenty Plots) and identifies 1003.00 Sq Yds of open space and 1427.00 Sq Yds of road area. A project-filed drawing also records a 30-plot schedule. The project evidence provided does not establish the final plot inventory for Phase II, nor does it provide plot-by-plot availability or booking status.

The project record states 80% completeness, but does not identify the underlying measurement date or independent verifier. A separate filed document describes a work-completion certificate dated 26/02/2025 for layout works; this is not evidence of an occupancy certificate. The proposed completion date recorded for the project is 15/09/2025. RERA record

Master plan, architecture & building design

This is a plotted layout, so the available design evidence concerns plot arrangement and land-use allocation rather than apartment plans, towers or floor configurations. The RERA project fields record 7837.60 sqmts total and net land area and 5805.87 sqmts approved built-up area; the records do not explain the built-up-area figure by structure or use. RERA filing RERA filing

The filed Draft Technical Layout Pattern approval Draft TLP. No. 12/ 2023 / DTCPO / MNCL, dated 15-09-2023, describes a 20-plot layout and allocates AC 0-20.72 Cents; 1003.00 Sq Yds to open space, AC 0.29.48 Cents; 1427.00 Sq Yds to roads, and AC 1-43.47 Cents; 6944.00 Sq Yds to plotted area. It identifies plots 14, 15, 19 and 20 as the plots mortgaged to Somagudem Gram Panchayat.

The supplied RERA-filed drawing record also describes a 30-plot schedule and identifies “TOTAL NO.OF PLOTS:30” and “TOTAL NO.OF PLOTS-20.” Its extracted land-use figures are partly unclear, so they should not be treated as a verified final area schedule. No plot-size schedule, final stamped layout drawing, plot dimensions, or surveyed plot-by-plot configuration is supplied for this overview.

Homes, configurations & floor plans

The registered offering is plots, not apartments. The supplied project fields do not provide a plot inventory table, plot-size bands, or plot-wise booked and available counts. The project-filed draft layout approval describes 20 (Twenty Plots), while the supplied drawing extraction also contains a 30-plot schedule; a final unit/plot schedule is not available in the evidence supplied here.

No plot-level RERA saleable areas or measured areas can be reported. The available floor-plan review data says two drawings are present, with 0 measured, 2 scans pending, and no layout sheets; it provides no usable plot measurements. Those drawings therefore do not establish plot dimensions or areas. Floor plans

Parking & vehicle circulation

No parking-space count, visitor provision, accessible parking, parking allocation, or parking allotment terms are established in the supplied project-specific RERA records. The project filing is for a plotted development, and the supplied layout extracts do not provide a verified parking schedule. RERA record Document index

The filed layout approval describes road area of 1427.00 Sq Yds and requires roads to be opened for access to neighbouring sites. The approval material also identifies road-width labels, including 33 Feet Wide Road and 200 WIDE NATIONAL HIGHWAY ROAD; the exact layout circulation arrangement is not available in a readable final plan here.

Amenities, recreation & open spaces

The table below separates project-filed layout features and RERA-recorded amenity entries from completion claims in the supplied documents. The percentages in the amenity record are declared values, not independent verification.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open spaceAC 0-20.72 Cents; 1003.00 Sq Yds in the filed draft layout approvalApproval document requires transfer to the Gram Panchayat by registered gift deed before final layout release; the supplied record does not independently verify transfer.
Green strip / tot lot / parkListed as available, 100%RERA amenitiesRERA amenity record; no independent completion verification supplied.
Avenue plantation / greeneryRequired in the layout approvalApproval condition; completion not independently verified here.
Internal roads & footpathsListed as available, 100%RERA amenitiesRERA amenity record; no independent completion verification supplied.
Street lightingListed as available, 100%; layout document also states lighting and electricity facilities have been providedRERA amenitiesFiled completion assertion; no independent verification supplied.
Community buildings0% recordedRERA amenitiesRERA amenity record.
Recreational open spaceListed as available, 100%RERA amenitiesRERA amenity record; no independent completion verification supplied.

Utilities, building services & safety

The filed layout approval lists side drains, street lighting, electricity facilities, a sewerage disposal system, protected water supply, rainwater-harvesting pits and avenue plantation. It also describes channelization of nalas and storm-water runoff. These are layout-document statements or conditions; the supplied evidence does not provide utility capacities, network drawings, commissioning records or independent verification.

The RERA amenity record lists water supply, sewerage, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. It records storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, and fire protection/fire-safety requirements at 0%. These percentages are RERA-filed status entries, not independent engineering certification in the supplied material. RERA amenities

No water-source or storage capacity, treatment-plant capacity, electrical backup details, EV charging, fire-system specification, CCTV/access-control provision, or accessibility arrangements are documented in the supplied project-specific evidence. RERA amenities Document index

Location, access & connectivity

The registered project location is SOMAGUDEM, Akenpally village, Bellampally mandal, Mancherial district, Telangana, PIN 504251. The RERA-filed land boundaries identify a railway line to the east and NH ROAD to the west. RERA record RERA filing RERA filing

The supplied location data places the cadastral parcel centroid at 19.026525651045215, 79.50670878993265. Its nearest sampled Outer Ring Road interchange is listed at approximately 189.4 km; no other measured distances or verified public-transport details are supplied. Location record

Developer & development status

The registration certificate identifies BAKAM SRINIVAS RAO as the promoter; the project header uses BAKAM. The legal-entity type, corporate identifier, registered office and official contact details are not established in the supplied materials. RERA record Corporate record

The project record describes the development as on-going, gives completeness as 80%, and records original and revised proposed completion dates of 15/09/2025. The supplied information does not explain the method or reporting date for the completeness figure, and it is not an independent site inspection. RERA record

A filed Form B declaration contains a promoter declaration about title, encumbrances, project funds, audit, pending approvals and completion, but the declarant details and completion undertaking are partly illegible. It therefore does not provide a reliably readable completion commitment beyond the project dates recorded in the RERA project fields.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01200009619; valid 15/09/2023–15/09/2025
What the supplied record establishesForm C certificate for BSR ENCLAVE PHASE II; issued 22/05/2025.
Principal layout approval
Identifier / dateDraft TLP. No. 12/ 2023 / DTCPO / MNCL; 15-09-2023
What the supplied record establishesDraft Technical Layout Pattern approval for a 20-plot layout, with stated road, open-space and plotted-area allocation.
Filed layout-plan drawing
Identifier / dateDTLP.NO. 12 /2023/DTCPO/MNCL.
What the supplied record establishesDrawing extraction describes a residential plotted layout and identifies plots 14, 15, 19 and 20 as mortgaged plots; the extraction also contains both 20- and 30-plot counts.
Layout-work completion record
Identifier / dateIr.No. 02/ GPA/2025, dated 26/02/2025; Lr.No. extracted as o1 /GPA /2024, date OCR-rendered 2b/02/2025
What the supplied record establishesThe filed release-deed material refers to completion of layout works and identifies mortgage release documentation.
Promoter declaration (Form B)
Identifier / dateDate partly illegible
What the supplied record establishesContains declarations and undertakings, but the supplied OCR does not reliably identify the complete date or completion period.
RERA-filed title search report
Identifier / dateDated 19-02-2025
What the supplied record establishesAdvocate V. Satyanarayana’s report concerning the promoter’s land and layout; the report’s conclusion is recorded in the document gist.
Encumbrance details
Identifier / dateStatement no. 194979614; searched period recorded as 01-01-1983 to 14-05-2025
What the supplied record establishesProject-filed encumbrance statement extract. A fresh current official record is not included here.

The supplied materials do not identify a project occupancy certificate. The layout-work completion record should not be read as an occupancy certificate.

Other registrations of Bsr Enclave

Frequently asked questions

Is BSR ENCLAVE PHASE II registered with Telangana RERA?

Yes. BSR ENCLAVE PHASE II is registered with the Telangana Real Estate Regulatory Authority as P01200009619; the registration status is On-Going Project.

Who is the developer of BSR ENCLAVE PHASE II?

The promoter named in the RERA registration is BAKAM.

Where is BSR ENCLAVE PHASE II located?

BSR ENCLAVE PHASE II is in SOMAGUDEM, Akenpally, Bellampally, Mancherial, Telangana (504251).

When will BSR ENCLAVE PHASE II be completed?

The promoter's proposed date of completion filed with RERA is 15/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Akenpally