SAS CROWN is a residential apartment project in Golden Mile, Gandipet, Ranga Reddy. The registered promoter is SRIAS DEVELOPERS LLP. The project has a site extent of 18,210.89 sq. m and four proposed building units; the approval record describes three residential towers and a commercial clubhouse, with the towers having 4 Cellars + 1 Ground + 59 upper floors. The TG-RERA unit record lists 258 4BHK and 7 5BHK homes, and registration number P02400002786; the project-information record lists proposed completion as 26/07/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SAS CROWN |
| Project type | Residential apartment project in TG-RERA’s project record RERA record |
| Phase / registered portion | No separate phase name or phase number is disclosed. The registration identifies the project as a whole; the filed project information lists four building units. RERA record RERA filing |
| TG-RERA registration | P02400002786 |
| Registration validity | 26/03/2021 to 26/03/2027; the certificate records a six-year period and no extension. This is registration validity, not the project completion deadline. |
| Registered promoter | SRIAS DEVELOPERS LLP, an LLP RERA record Corporate record |
| RERA status | Registration certificate issued; the registration is shown as valid through 26/03/2027. |
Land and geographic identity
| Item | Project record |
|---|---|
| Filed locality | GOLDEN MILE RERA filing |
| Revenue village | Kokapet Village is named in the filed title and approval documents. “Golden Mile” is recorded as the project locality, not established as the revenue-village name. |
| Mandal / district / PIN | Gandipet, Ranga Reddy, 500075 RERA filing |
| Project survey numbers | 100, 109 and 114; no subdivision numbers are stated in the supplied project identity record. RERA filing |
| Site extent | RERA-filed total area: 18,210.89 sq. m; net area: 18,119.57 sq. m; area affected in road widening/FTL of tanks/nala widening: 22.25 sq. m. RERA filing |
| Approval-document extent | HMDA approval documents also state 18,210.89 Sq. Mt. |
| Filed boundaries | East: OTHERS LAND; West: ROAD; North: ORR ROAD; South: ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the approval records refer to release/sanction by the local authority, identified as Narsingi Municipality / Municipal Corporation. |
| RERA-filed plan approval number | 040421/SKP/R1/U6/HMD RERA filing |
| Principal approval in supplied approval document | HMDA Building Permit Order 014037/BP/HMDA/3825/SKP/2024, approved 12 March, 2026. |
| Buildings shown in the approval document | Three residential towers and one commercial clubhouse. |
| Approved floor configuration in the 2026 approval document | Residential towers: 4 Cellars + 1 Ground + 59 upper floors. Clubhouse: 1 Ground + + 5 upper floors with Mezzanine @Ground, Third Floor. |
| Approved built-up area | The approval extraction lists Total Built up Area 213,960.60 and also separately lists Total Built up Area 273,525.39; the supplied extracts do not explain the basis of these two labels. |
| RERA-declared buildings / homes | Filed land details list 4 total building units and 4 proposed building units. The unit table identifies 258 4BHK and 7 5BHK homes, plus 2 rows labelled “T” that are not classified as homes. RERA filing RERA unit details |
| Parking levels | The approval document shows four cellar levels for each residential tower. The provided record does not give a sanctioned parking-space count. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed home configurations | 4BHK and 5BHK RERA unit details |
| RERA-filed saleable area | 4BHK: 760.17 sq. m; 5BHK: 1401.78 sq. m. RERA unit details |
| Booked / available | 4BHK: 114 booked / 144 available; 5BHK: 4 booked / 3 available. Portal counts have no stated as-of date and should be treated as indicative. RERA unit details |
| Construction stage | TG-RERA progress fields report some infrastructure and building-related items as in progress; these are declared percentages, not independent site verification. RERA amenities |
| Completion date | The RERA Form-B declaration undertakes completion by 29/03/2027. The project identity record separately lists proposed completion as 26/07/2027. These are both recorded dates; their relationship is not established here. RERA filing |
| Occupancy / completion certificate | The supplied 2026 building-permit extraction states that no completion certification is recorded and requires an Occupancy Certificate before occupation. No project OC is supplied. |
2. The project story
- SAS CROWN is registered as a residential apartment project on Plot No. 11 at Kokapet Village, Gandipet Mandal, Ranga Reddy District, on Survey Nos. 100, 109 and 114. The registered locality is Golden Mile. The RERA land record gives a total area of 18,210.89 sq. m and a net area of 18,119.57 sq. m. RERA filing RERA filing
- The supplied HMDA approval record describes three residential towers and a commercial clubhouse. Its 2026 building-permit extraction shows the towers with four cellar levels, a ground floor and 59 upper floors, and the clubhouse with a ground floor and five upper floors, including mezzanine areas as stated in the record.
- The RERA unit record lists 258 4BHK and 7 5BHK homes. Separately, the portal’s infrastructure-progress entries report percentages for items including water supply, sewerage, internal roads and community buildings; these are filed progress declarations, not an independent inspection or confirmation of completion. No occupancy certificate is included in the supplied evidence, and the approval document says an OC is required before occupation. RERA unit details RERA amenities
3. Master plan, architecture & building design
- The supplied HMDA building-permit extraction identifies the site as Plot No. 11, Survey Nos. 100, 109 and 114, in Kokapet Village, Gandipet Mandal, Ranga Reddy District. It records an extent of 18,210.89 Sq. Mt. and three residential towers with a commercial clubhouse.
- The same approval extraction gives the following floor arrangement: each residential tower has 4 Cellars + 1 Ground + 59 upper floors. The clubhouse is recorded as 1 Ground + + 5 upper floors with Mezzanine @Ground, Third Floor. The RERA filing lists four proposed building units, consistent with the three towers and clubhouse identified in the approval record. RERA filing
- The approval extraction lists Total proposed built-up area 213,960.60 and Total Built up Area 273,525.39. The supplied record does not clarify the distinction between these labels; neither is a carpet-area figure. No verified FSI-counted area, building footprint, flats-per-floor schedule, internal-road dimensions, landscape-area schedule or tower-by-tower flat count is supplied.
- The approval conditions include keeping parking or other construction out of setback areas, maintaining open space as greenery, providing a transformer and garbage house, and obtaining an occupancy certificate before occupation. These are approval conditions, not confirmation that the facilities have been completed.
4. Homes, configurations & floor plans
The following home counts and saleable areas are from the TG-RERA unit record. The available portal booking figures have no stated as-of date. RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 258 | 114 | 144 | 760.17 sq. m | 423.6–583.9 sq. m; median 521.4 sq. m—software-measured from drawings, not RERA-filed | 31% supplied for the drawing-measured 4BHK set |
| 5BHK | 7 | 4 | 3 | 1401.78 sq. m | Not supplied | Not supplied |
- The drawing measurement for 4BHK homes is derived by software from the supplied approved floor-plan drawings and is marked for review. It is not a RERA carpet-area disclosure. The drawing set also contains measured 1BHK, 2BHK and 3BHK configurations, but those configurations are not listed as homes in the TG-RERA unit filing; they are therefore not presented as RERA-filed offerings here. Floor plans RERA unit details
- Carpet area is the net usable area within the apartment, while saleable area may include the apartment’s proportionate share of common areas; the two figures are not interchangeable. The supplied measurements do not provide verified unit-by-unit dimensions or an independently checked area schedule. Floor plans RERA unit details
- The portal also contains two units labelled “T,” with a saleable-area entry of 3636.55 sq. m each; the record does not identify their configuration as homes. They are excluded from the home counts above. Clubhouse rows in the unit table are common-area entries, not homes for sale. RERA unit details
5. Parking & vehicle circulation
- The building-permit record shows four cellar levels in each residential tower and states that stilt/cellar areas are to be used exclusively for vehicle parking. It does not provide a sanctioned number of car or two-wheeler spaces, visitor-space count, accessible-parking count, parking allocation by apartment, or a documented exclusive allotment schedule.
- The vendor’s project-information entry describes basement car parking and parking across four levels; this is vendor-supplied information, not a verified parking count or unit allocation. Promoter website
- The supplied evidence does not establish parking-space totals, ramp layout, separate pedestrian circulation, EV-charging quantities, or which parking spaces (if any) are legally allocated to a particular unit. A parking area shown or described does not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The TG-RERA progress record marks the following facilities as available in the project record and gives declared progress percentages. Percentages are filed progress data, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Facility listed; no size or capacity supplied | TG-RERA progress record RERA amenities | 70% declared; not independently verified |
| Green strip / tot lot / park | Facility listed; no area supplied | TG-RERA progress record RERA amenities | 40% declared; not independently verified |
| Aggregate recreational open space | Facility listed; no area supplied | TG-RERA progress record RERA amenities | 0% declared; not independently verified |
- The approval document requires the earmarked open space to be maintained and developed as greenery. The supplied evidence does not include an approved amenity schedule with dimensions or a verified completion record for recreational facilities.
- The vendor lists facilities such as a clubhouse, swimming and lap pools, gym, indoor games, courts, gardens and jogging track. These are vendor-provided descriptions and are not established by the supplied approval extracts or the RERA progress table as sanctioned or delivered amenities. Promoter website
7. Utilities, building services & safety
- The building-permit documents require or identify provision for a sewage treatment plant, rainwater harvesting structures, transformer and garbage house. A later approval extraction also lists electric-vehicle charging infrastructure and a dual-piping system. These are documentary provisions; the supplied record does not establish their installed capacity or completion.
- The TG-RERA progress record reports: water supply 90%, sewerage 75%, storm-water drains 80%, electrical meter room/sub-station/receiving station 50%, fire protection and fire-safety requirements 95%, and rainwater harvesting 0%. These are declared progress percentages, not independent verification of installation, operation or statutory compliance. RERA amenities
- The supplied documents do not establish the project’s water sources, storage capacity, treatment capacity, backup-power capacity, lift numbers or capacities, fire-system test results, waste-segregation arrangements, CCTV coverage, or accessible circulation as completed. The approval record requires an occupancy certificate before occupation.
8. Location, access & connectivity
- The registered project location is Golden Mile, at Kokapet Village, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500075. The RERA-filed boundary record identifies ORR ROAD to the north and roads to the west and south. The supplied cadastral-parcel centroid is 17.41528, 78.35459. RERA filing RERA filing Location record
- The supplied location data lists Financial District (Nanakramguda) at 1.2 km, an unnamed bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, an unnamed park at 1.2 km, Nanakramguda Government Primary School at 0.5 km, IndusInd Bank at 0.4 km, and ADP at 0.0 km. These are the distances in the supplied location record; no travel times or route conditions are provided. Location record
9. Developer & development status
- The registered legal promoter is SRIAS DEVELOPERS LLP, an LLP. Its listed GSTIN is 36AEBFS6982C1ZV. The project record gives the promoter’s office address as 5TH FLOOR 504, MODERN PROFOUND TECH PARK, WHITE FEILD ROAD, KOKAPET VILLAGE, GOLDEN MILE, Gandipet, Ranga Reddy, 500075. Corporate record RERA filing RERA filing
- The project’s Form-B declaration, signed by G VENKATESWAR RAO representing the LLP, states completion by 29/03/2027. The project-information record separately lists 26/07/2027 as the proposed completion date; the supplied data does not explain how these dates relate. Neither completion date is an occupancy certificate. RERA filing
- RERA progress fields give declared progress percentages for selected infrastructure and building-related items, but no independently verified site inspection or consolidated physical construction-completion percentage is supplied. No project occupancy certificate is included in the evidence. RERA amenities
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C registers SAS CROWN, registration P02400002786, valid 26/03/2021–26/03/2027. |
| RERA-filed plan approval reference | 040421/SKP/R1/U6/HMD is recorded in the project information. RERA filing |
| HMDA technical approval | Technical Approval No. 040421/5KP/R1/U6/HMDA/09112020, approved 26/03/2021, covering Survey Nos. 109 and 114 in its extracted particulars; the document describes four proposed blocks and records conditions for local-authority sanction/release and occupancy certification. |
| HMDA Building Permit Order | 014037/BP/HMDA/3825/SKP/2024, approved 12 March, 2026, for Plot No. 11 and Survey Nos. 100, 109 and 114; the supplied extraction describes three residential towers and a commercial clubhouse. |
| Approval conditions / services | The supplied building-permit records include conditions addressing construction to approved plans, open space, parking areas, rainwater harvesting, STP, transformer/garbage-house provision and an OC before occupation. |
| Form-B declaration | Promoter declaration concerning title, encumbrances, RERA obligations and the completion undertaking of 29/03/2027. This is a promoter declaration, not an independent title determination. |
| Occupancy / completion certificate | No project OC or completion certificate is supplied; the 2026 approval extraction records completion certification as false and requires an OC before occupation. |
The public HMDA DPMS approved-layout lookup was unavailable in the supplied record, so an independently retrieved approved-layout file is not included here. HMDA
1. Project at a glance
Project identity
Registered project name: SAS CROWN
Project type: Residential apartment project in TG-RERA’s project record
Phase / registered portion: No separate phase name or phase number is disclosed. The registration identifies the project as a whole; the filed project information lists four building units.
TG-RERA registration: P02400002786
Registration validity: 26/03/2021 to 26/03/2027; the certificate records a six-year period and no extension. This is registration validity, not the project completion deadline.
Registered promoter: SRIAS DEVELOPERS LLP, an LLP
RERA status: Registration certificate issued; the registration is shown as valid through 26/03/2027.
Land and geographic identity
Filed locality: GOLDEN MILE
Revenue village: Kokapet Village is named in the filed title and approval documents. “Golden Mile” is recorded as the project locality, not established as the revenue-village name.
Mandal / district / PIN: Gandipet, Ranga Reddy, 500075
Project survey numbers: 100, 109 and 114; no subdivision numbers are stated in the supplied project identity record.
Site extent: RERA-filed total area: 18,210.89 sq. m; net area: 18,119.57 sq. m; area affected in road widening/FTL of tanks/nala widening: 22.25 sq. m.
Approval-document extent: HMDA approval documents also state 18,210.89 Sq. Mt.
Filed boundaries: East: OTHERS LAND; West: ROAD; North: ORR ROAD; South: ROAD.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the approval records refer to release/sanction by the local authority, identified as Narsingi Municipality / Municipal Corporation.
RERA-filed plan approval number: 040421/SKP/R1/U6/HMD
Principal approval in supplied approval document: HMDA Building Permit Order 014037/BP/HMDA/3825/SKP/2024, approved 12 March, 2026.
Buildings shown in the approval document: Three residential towers and one commercial clubhouse.
Approved floor configuration in the 2026 approval document: Residential towers: 4 Cellars + 1 Ground + 59 upper floors. Clubhouse: 1 Ground + + 5 upper floors with Mezzanine @Ground, Third Floor.
Approved built-up area: The approval extraction lists Total Built up Area 213,960.60 and also separately lists Total Built up Area 273,525.39; the supplied extracts do not explain the basis of these two labels.
RERA-declared buildings / homes: Filed land details list 4 total building units and 4 proposed building units. The unit table identifies 258 4BHK and 7 5BHK homes, plus 2 rows labelled “T” that are not classified as homes.
Parking levels: The approval document shows four cellar levels for each residential tower. The provided record does not give a sanctioned parking-space count.
Offering and status
RERA-filed home configurations: 4BHK and 5BHK
RERA-filed saleable area: 4BHK: 760.17 sq. m; 5BHK: 1401.78 sq. m.
Booked / available: 4BHK: 114 booked / 144 available; 5BHK: 4 booked / 3 available. Portal counts have no stated as-of date and should be treated as indicative.
Construction stage: TG-RERA progress fields report some infrastructure and building-related items as in progress; these are declared percentages, not independent site verification.
Completion date: The RERA Form-B declaration undertakes completion by 29/03/2027. The project identity record separately lists proposed completion as 26/07/2027. These are both recorded dates; their relationship is not established here.
Occupancy / completion certificate: The supplied 2026 building-permit extraction states that no completion certification is recorded and requires an Occupancy Certificate before occupation. No project OC is supplied.
2. The project story
- SAS CROWN is registered as a residential apartment project on Plot No. 11 at Kokapet Village, Gandipet Mandal, Ranga Reddy District, on Survey Nos. 100, 109 and 114. The registered locality is Golden Mile. The RERA land record gives a total area of 18,210.89 sq. m and a net area of 18,119.57 sq. m.
- The supplied HMDA approval record describes three residential towers and a commercial clubhouse. Its 2026 building-permit extraction shows the towers with four cellar levels, a ground floor and 59 upper floors, and the clubhouse with a ground floor and five upper floors, including mezzanine areas as stated in the record.
- The RERA unit record lists 258 4BHK and 7 5BHK homes. Separately, the portal’s infrastructure-progress entries report percentages for items including water supply, sewerage, internal roads and community buildings; these are filed progress declarations, not an independent inspection or confirmation of completion. No occupancy certificate is included in the supplied evidence, and the approval document says an OC is required before occupation.
3. Master plan, architecture & building design
- The supplied HMDA building-permit extraction identifies the site as Plot No. 11, Survey Nos. 100, 109 and 114, in Kokapet Village, Gandipet Mandal, Ranga Reddy District. It records an extent of 18,210.89 Sq. Mt. and three residential towers with a commercial clubhouse.
- The same approval extraction gives the following floor arrangement: each residential tower has 4 Cellars + 1 Ground + 59 upper floors. The clubhouse is recorded as 1 Ground + + 5 upper floors with Mezzanine @Ground, Third Floor. The RERA filing lists four proposed building units, consistent with the three towers and clubhouse identified in the approval record.
- The approval extraction lists Total proposed built-up area 213,960.60 and Total Built up Area 273,525.39. The supplied record does not clarify the distinction between these labels; neither is a carpet-area figure. No verified FSI-counted area, building footprint, flats-per-floor schedule, internal-road dimensions, landscape-area schedule or tower-by-tower flat count is supplied.
- The approval conditions include keeping parking or other construction out of setback areas, maintaining open space as greenery, providing a transformer and garbage house, and obtaining an occupancy certificate before occupation. These are approval conditions, not confirmation that the facilities have been completed.
4. Homes, configurations & floor plans
The following home counts and saleable areas are from the TG-RERA unit record. The available portal booking figures have no stated as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 258 | 114 | 144 | 760.17 sq. m | 423.6–583.9 sq. m; median 521.4 sq. m—software-measured from drawings, not RERA-filed | 31% supplied for the drawing-measured 4BHK set |
| 5BHK | 7 | 4 | 3 | 1401.78 sq. m | Not supplied | Not supplied |
- The drawing measurement for 4BHK homes is derived by software from the supplied approved floor-plan drawings and is marked for review. It is not a RERA carpet-area disclosure. The drawing set also contains measured 1BHK, 2BHK and 3BHK configurations, but those configurations are not listed as homes in the TG-RERA unit filing; they are therefore not presented as RERA-filed offerings here.
- Carpet area is the net usable area within the apartment, while saleable area may include the apartment’s proportionate share of common areas; the two figures are not interchangeable. The supplied measurements do not provide verified unit-by-unit dimensions or an independently checked area schedule.
- The portal also contains two units labelled “T,” with a saleable-area entry of 3636.55 sq. m each; the record does not identify their configuration as homes. They are excluded from the home counts above. Clubhouse rows in the unit table are common-area entries, not homes for sale.
5. Parking & vehicle circulation
- The building-permit record shows four cellar levels in each residential tower and states that stilt/cellar areas are to be used exclusively for vehicle parking. It does not provide a sanctioned number of car or two-wheeler spaces, visitor-space count, accessible-parking count, parking allocation by apartment, or a documented exclusive allotment schedule.
- The vendor’s project-information entry describes basement car parking and parking across four levels; this is vendor-supplied information, not a verified parking count or unit allocation.
- The supplied evidence does not establish parking-space totals, ramp layout, separate pedestrian circulation, EV-charging quantities, or which parking spaces (if any) are legally allocated to a particular unit. A parking area shown or described does not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The TG-RERA progress record marks the following facilities as available in the project record and gives declared progress percentages. Percentages are filed progress data, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Facility listed; no size or capacity supplied | TG-RERA progress record | 70% declared; not independently verified |
| Green strip / tot lot / park | Facility listed; no area supplied | TG-RERA progress record | 40% declared; not independently verified |
| Aggregate recreational open space | Facility listed; no area supplied | TG-RERA progress record | 0% declared; not independently verified |
- The approval document requires the earmarked open space to be maintained and developed as greenery. The supplied evidence does not include an approved amenity schedule with dimensions or a verified completion record for recreational facilities.
- The vendor lists facilities such as a clubhouse, swimming and lap pools, gym, indoor games, courts, gardens and jogging track. These are vendor-provided descriptions and are not established by the supplied approval extracts or the RERA progress table as sanctioned or delivered amenities.
7. Utilities, building services & safety
- The building-permit documents require or identify provision for a sewage treatment plant, rainwater harvesting structures, transformer and garbage house. A later approval extraction also lists electric-vehicle charging infrastructure and a dual-piping system. These are documentary provisions; the supplied record does not establish their installed capacity or completion.
- The TG-RERA progress record reports: water supply 90%, sewerage 75%, storm-water drains 80%, electrical meter room/sub-station/receiving station 50%, fire protection and fire-safety requirements 95%, and rainwater harvesting 0%. These are declared progress percentages, not independent verification of installation, operation or statutory compliance.
- The supplied documents do not establish the project’s water sources, storage capacity, treatment capacity, backup-power capacity, lift numbers or capacities, fire-system test results, waste-segregation arrangements, CCTV coverage, or accessible circulation as completed. The approval record requires an occupancy certificate before occupation.
8. Location, access & connectivity
- The registered project location is Golden Mile, at Kokapet Village, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500075. The RERA-filed boundary record identifies ORR ROAD to the north and roads to the west and south. The supplied cadastral-parcel centroid is 17.41528, 78.35459.
- The supplied location data lists Financial District (Nanakramguda) at 1.2 km, an unnamed bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, an unnamed park at 1.2 km, Nanakramguda Government Primary School at 0.5 km, IndusInd Bank at 0.4 km, and ADP at 0.0 km. These are the distances in the supplied location record; no travel times or route conditions are provided.
9. Developer & development status
- The registered legal promoter is SRIAS DEVELOPERS LLP, an LLP. Its listed GSTIN is 36AEBFS6982C1ZV. The project record gives the promoter’s office address as 5TH FLOOR 504, MODERN PROFOUND TECH PARK, WHITE FEILD ROAD, KOKAPET VILLAGE, GOLDEN MILE, Gandipet, Ranga Reddy, 500075.
- The project’s Form-B declaration, signed by G VENKATESWAR RAO representing the LLP, states completion by 29/03/2027. The project-information record separately lists 26/07/2027 as the proposed completion date; the supplied data does not explain how these dates relate. Neither completion date is an occupancy certificate.
- RERA progress fields give declared progress percentages for selected infrastructure and building-related items, but no independently verified site inspection or consolidated physical construction-completion percentage is supplied. No project occupancy certificate is included in the evidence.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registers SAS CROWN, registration P02400002786, valid 26/03/2021–26/03/2027.
RERA-filed plan approval reference: 040421/SKP/R1/U6/HMD is recorded in the project information.
HMDA technical approval: Technical Approval No. 040421/5KP/R1/U6/HMDA/09112020, approved 26/03/2021, covering Survey Nos. 109 and 114 in its extracted particulars; the document describes four proposed blocks and records conditions for local-authority sanction/release and occupancy certification.
HMDA Building Permit Order: 014037/BP/HMDA/3825/SKP/2024, approved 12 March, 2026, for Plot No. 11 and Survey Nos. 100, 109 and 114; the supplied extraction describes three residential towers and a commercial clubhouse.
Approval conditions / services: The supplied building-permit records include conditions addressing construction to approved plans, open space, parking areas, rainwater harvesting, STP, transformer/garbage-house provision and an OC before occupation.
Form-B declaration: Promoter declaration concerning title, encumbrances, RERA obligations and the completion undertaking of 29/03/2027. This is a promoter declaration, not an independent title determination.
Occupancy / completion certificate: No project OC or completion certificate is supplied; the 2026 approval extraction records completion certification as false and requires an OC before occupation.
The public HMDA DPMS approved-layout lookup was unavailable in the supplied record, so an independently retrieved approved-layout file is not included here.
Frequently asked questions
Is SAS CROWN registered with Telangana RERA?
Yes. SAS CROWN is registered with the Telangana Real Estate Regulatory Authority as P02400002786; the registration status is New Project.
Who is the developer of SAS CROWN?
The promoter named in the RERA registration is SRIAS DEVELOPERS LLP.
Where is SAS CROWN located?
SAS CROWN is in GOLDEN MILE, Gandipet, Rangareddy, Telangana (500075).
When will SAS CROWN be completed?
The promoter's proposed date of completion filed with RERA is 26/07/2027. This is the promoter's declaration, not a guarantee.