Svs Gk Phase-V
SVS GK DEVELOPERS AND CONSTRUCTIONS · Hanamkonda · RERA P00300010236
SVS GK PHASE-V is a new plotted-layout project in Madikonda Revenue Village, Khazipet mandal, Warangal Urban district. The registered promoter is SVS GK DEVELOPERS AND CONSTRUCTIONS. The project’s RERA filing records a total site area of 9,307.59 sq.m and a net area of 8,538.05 sq.m; the layout provides 25 plots, with drawing-derived plot sizes of 146.37–804.94 sq.m. TG-RERA registration number P00300010236 is valid 17 September 2025–17 September 2027, and the promoter’s Form B gives the proposed completion date as 17/09/2027.
More from Svs Gk Developers And Constructions · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SVS GK PHASE-V RERA record |
| Project type / registered portion | New plotted-layout project; Phase-V. RERA record RERA filing |
| TG-RERA registration | P00300010236; valid 17 September 2025–17 September 2027, subject to any extension by the Authority. Registration validity is not the project completion deadline. RERA record Approvals record |
| Registered promoter | SVS GK DEVELOPERS AND CONSTRUCTIONS; partnership. RERA record Corporate record |
| RERA status in supplied record | Registered; certificate captured 10 September 2026. Approvals record |
| Project completion date | RERA Form B promoter undertaking: 17/09/2027. The tentative-layout approval also requires infrastructure and amenities to be completed within two years of 17 September 2025. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Madikonda; the registered land is identified as Madikonda Revenue Village. RERA record |
| Mandal | Khazipet (also rendered “Kazipet” in the final-layout document). RERA record |
| District | Warangal Urban in the RERA identity and certificate; the layout approval documents also use Hanumakonda District. RERA record |
| PIN | 506142. RERA record RERA filing |
| All project survey numbers / subdivisions | 312/A1/3/1/2/1; 312/A2/1/1; 312/A2/2/1. RERA record Land records |
| Registered site extent | RERA filing: 9,307.59 sq.m total area, 769.54 sq.m road-affected area and 8,538.05 sq.m net area. RERA filing |
| Layout drawing area statement | 8,538.33 sq.m total net layout, comprising 5,521.24 sq.m plotted area, 1,897.23 sq.m roads, 810.84 sq.m park/open space, 222.93 sq.m social infrastructure and 86.09 sq.m utilities. Layout record |
| Boundaries | East: ROAD; West: OTHERS LAND; North: AGRICULTURE LAND; South: OTHER LAYOUT. RERA filing |
Development identity
| Field | Record |
|---|---|
| Principal layout approval | Tentative layout approval 0132/LO/3006/2025, dated 17 September 2025; the filed drawing identifies TS-DTCP, while the approval document is issued by GWMC. Approvals record |
| Final layout release | Final LP 0293/GWMC/SWFL/2026, dated 25/08/2026, issued by Greater Warangal Municipal Corporation. Approvals record |
| Development form / plot count | Open-plot residential layout; 25 plots. |
| Proposed built-up area | 0.00 excluding parking and 0.00 including parking in the layout-plan parameters; this is a plotted layout, not a filed apartment-building schedule. |
| Buildings, floors and building parking levels | No building count, floor configuration or building-parking-level schedule is supplied. Individual building permissions are addressed separately in the final-layout conditions. |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots in a 25-plot residential layout. |
| Plot sizes | Drawing-derived schedule: 25 plots; 146.37–804.94 sq.m (software-measured from the approved layout drawing; verify against the drawing). Layout record |
| Booking / availability | Booked and available plot counts are not supplied. RERA unit table |
| Development / OC status | The final layout release is recorded, but this is not an occupancy certificate for individual dwellings. The available certificate/document material does not establish completion or occupancy certification of any dwelling on a plot. |
| Completion deadline | Promoter-declared RERA completion undertaking: 17/09/2027. |
2. The project story
SVS GK PHASE-V is a registered plotted residential development at Madikonda, Khazipet, on the three identified survey subdivisions. The approved layout drawing provides for 25 plots, internal and connecting roads, park/open space, social-infrastructure land and utility land. The final layout letter states that each site is for dwelling-unit use and specifies detached, single-family dwelling use; it also says individual building permission is to be considered separately. RERA record
The record shows a tentative layout approval dated 17 September 2025 and a final layout release dated 25 August 2026. The promoter’s Form B gives 17/09/2027 as the project completion date; the tentative approval requires the developer to complete infrastructure and amenities within two years from approval. These dates concern project completion and layout infrastructure, not RERA registration validity or an occupancy certificate for a future home. No independently verified construction-progress measurement is supplied.
3. Master plan, architecture & building design
The approved drawing is for an open-plot layout, not a multi-storey building plan. Its stated land-use schedule assigns 5,521.24 sq.m (64.67%) to plots, 1,897.23 sq.m (22.22%) to roads, 810.84 sq.m (9.50%) to organized open space/park, 222.93 sq.m (2.61%) to social infrastructure and 86.09 sq.m (1.01%) to utilities, out of 8,538.33 sq.m total net layout area. The layout parameters separately state net plot area 8,538.05 sq.m. Layout record
The drawing identifies roads of 9.14 m, 12.19 m, 12.20 m, 10.66 m existing, and 45.00 m proposed widths, as well as proposed roads identified as 30.00 m, 40'-0", 80'-0", 100'-0" and 150'-0" wide. It lists 12.20 m internal roads, including road numbers 1–14 except 15, and also references master-plan roads.
The drawing lists a tot-lot, V-CITY Tot lot, garbage pit, well and utility area. There is no building footprint, dwelling design, apartment distribution, floor configuration, FSI-counted area or dwelling-level architectural schedule in the supplied material.
4. Homes, configurations & floor plans
This is a plotted development, so the RERA offering is plots rather than apartment configurations. The layout drawing’s plot schedule states 25 plots and is reported as complete in the drawing-derived data. The plot count and sizes are software-read from the approved drawing, not a separate RERA unit disclosure; verify them against the drawing. Layout record
| Plot information | Record |
|---|---|
| Plots shown | 25 Layout record |
| Smallest / median / largest drawing-derived plot size | 146.37 / 195.47 / 804.94 sq.m; 175.1 / 233.8 / 962.7 sq.yd Layout record |
| Size bands (sq.yd) | 150–200: 4; 200–250: 14; 250–300: 4; 300–400: 2; 500–1000: 1 Layout record |
| Booked / available | Not supplied RERA unit table |
No dwelling floor plans or measured carpet-area figures are available. The supplied floor-plan review records two layout sheets and no dwelling plans with measured areas. Floor plans
5. Parking & vehicle circulation
The layout-plan land-use schedule records 0.00 sq.m as common parking area. No sanctioned parking-space count, visitor or accessible parking provision, vehicle ramp, parking level, EV charging provision or plot-specific parking allocation is supplied. The drawing identifies internal roads, including 12.20 m internal roads; this does not establish a parking allocation or exclusive parking right.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 810.84 sq.m; 9.50% of the drawing’s net-layout area | Layout record | Shown in layout; completion not independently verified |
| Social infrastructure | 222.93 sq.m; 2.61% | Layout record | Land allocated; facility delivery not independently verified |
| Tot-lot / V-CITY Tot lot | Facility labels on layout drawing; no size supplied | Shown/listed; completion not independently verified | |
| Garbage pit | Listed on layout drawing; no size supplied | Shown/listed; completion not independently verified | |
| Utility area | 86.09 sq.m; 1.01% | Layout record | Land allocated; utility installations not independently verified |
The tentative layout approval requires the developer to hand over open space, utilities and roads to the municipality by registered gift deed before release of the tentative layout. The final-layout record refers to a registered gift deed, but its number is illegible in the supplied extraction.
7. Utilities, building services & safety
The tentative-layout approval lists a water reservoir, septic tank/sewerage treatment plant, electric transformer, solid-waste management, overhead tank, storm-water drains, underground drainage lines, street lights, avenue plantation and rainwater-harvesting pits. These are approval-recorded infrastructure items, not independently verified as completed; the approval also requires infrastructure and amenities to be completed within two years of 17 September 2025.
The final-layout conditions require rainwater-harvesting structures and state a minimum 3 m (10'-0") safety distance from high-tension electricity lines when individual residential buildings are approved. Individual building permissions are to be considered separately. No capacities, detailed treatment specifications, electrical-backup system, fire-safety design, security system, accessibility plan or dwelling-level services schedule are supplied.
8. Location, access & connectivity
The registered location is Madikonda Revenue Village, Khazipet mandal, Warangal Urban district, PIN 506142. The approved layout drawing shows road access and internal road widths, including a 10.66 MT WIDE EXISTING road and a 45.00 MT WIDE PROPOSED ROAD. The final-layout conditions require internal roads to remain open to provide access to neighbouring lands. RERA record
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 102.2 km. The location geocode is associated with Government Ayurvedic Dispensary, Madikonda (Regular), Madikonda, Kazipet, Hanumakonda. No public-transport details or other verified distance measurements are supplied. Location record
9. Developer & development status
The registered promoter is SVS GK DEVELOPERS AND CONSTRUCTIONS, identified as a partnership. The supplied firm record gives registration number 378 of 2020 at Warangal; the partners listed in the record are Karunakar Goke and Kalpana Goke. The RERA filing identifies KARUNAKAR GOKE as authorized signatory. Corporate record
The promoter’s registered address is recorded as SRI NILAYAM, CHAITHANYAPURI, MADIKONDA, MADIKONDA, Khazipet, Warangal Urban, 506142. The supplied GSTIN is 36AEEFS7512M1ZN. A promoter website is listed as svsgkrealty.com; it is not used here to establish project specifications. Parties record Corporate record Promoter website
The promoter’s Form B states a completion date of 17/09/2027. The layout approval sets an infrastructure-and-amenities completion period of two years from 17 September 2025. No independent construction-progress assessment is supplied.
10. Approvals, official records & documents
| Reference / date | P00300010236; valid 17/09/2025–17/09/2027 |
|---|---|
| What it evidences | Registration of SVS GK PHASE-V and stated registration conditions. |
| Reference / date | File TS/019833/2025; plan 0132/LO/3006/2025; dated 17 September 2025 |
|---|---|
| What it evidences | Tentative open-plot layout plan for the three project survey subdivisions and 25 plots, with stated layout conditions. |
| Reference / date | 0293/GWMC/SWFL/2026; dated 25/08/2026 |
|---|---|
| What it evidences | Final layout release for 25 plots at Madikonda. The cited registered gift-deed number is illegible in the supplied text extraction. |
| Reference / date | Filed promoter declaration |
|---|---|
| What it evidences | Declares project completion by 17/09/2027, 70% separate-account undertaking, audit and other promoter commitments. |
| Reference / date | 378 of 2020, Warangal |
|---|---|
| What it evidences | Acknowledgement of partnership-firm registration; the document does not itself establish project land title. |
No dwelling-building approval or dwelling occupancy certificate is established by these layout records. The supplied architect certificate and final-layout record refer to a layout-related completion/final-layout process; they do not establish occupancy certification for an individual home on a plot.
1. Project at a glance
Project identity
Registered project name: SVS GK PHASE-V
Project type / registered portion: New plotted-layout project; Phase-V.
TG-RERA registration: P00300010236; valid 17 September 2025–17 September 2027, subject to any extension by the Authority. Registration validity is not the project completion deadline.
Registered promoter: SVS GK DEVELOPERS AND CONSTRUCTIONS; partnership.
RERA status in supplied record: Registered; certificate captured 10 September 2026.
Project completion date: RERA Form B promoter undertaking: 17/09/2027. The tentative-layout approval also requires infrastructure and amenities to be completed within two years of 17 September 2025.
Land and geographic identity
Locality / revenue village: Madikonda; the registered land is identified as Madikonda Revenue Village.
Mandal: Khazipet (also rendered “Kazipet” in the final-layout document).
District: Warangal Urban in the RERA identity and certificate; the layout approval documents also use Hanumakonda District.
PIN: 506142.
All project survey numbers / subdivisions: 312/A1/3/1/2/1; 312/A2/1/1; 312/A2/2/1.
Registered site extent: RERA filing: 9,307.59 sq.m total area, 769.54 sq.m road-affected area and 8,538.05 sq.m net area.
Layout drawing area statement: 8,538.33 sq.m total net layout, comprising 5,521.24 sq.m plotted area, 1,897.23 sq.m roads, 810.84 sq.m park/open space, 222.93 sq.m social infrastructure and 86.09 sq.m utilities.
Boundaries: East: ROAD; West: OTHERS LAND; North: AGRICULTURE LAND; South: OTHER LAYOUT.
Development identity
Principal layout approval: Tentative layout approval 0132/LO/3006/2025, dated 17 September 2025; the filed drawing identifies TS-DTCP, while the approval document is issued by GWMC.
Final layout release: Final LP 0293/GWMC/SWFL/2026, dated 25/08/2026, issued by Greater Warangal Municipal Corporation.
Development form / plot count: Open-plot residential layout; 25 plots.
Proposed built-up area: 0.00 excluding parking and 0.00 including parking in the layout-plan parameters; this is a plotted layout, not a filed apartment-building schedule.
Buildings, floors and building parking levels: No building count, floor configuration or building-parking-level schedule is supplied. Individual building permissions are addressed separately in the final-layout conditions.
Offering and status
Offering: Plots in a 25-plot residential layout.
Plot sizes: Drawing-derived schedule: 25 plots; 146.37–804.94 sq.m (software-measured from the approved layout drawing; verify against the drawing).
Booking / availability: Booked and available plot counts are not supplied.
Development / OC status: The final layout release is recorded, but this is not an occupancy certificate for individual dwellings. The available certificate/document material does not establish completion or occupancy certification of any dwelling on a plot.
Completion deadline: Promoter-declared RERA completion undertaking: 17/09/2027.
2. The project story
SVS GK PHASE-V is a registered plotted residential development at Madikonda, Khazipet, on the three identified survey subdivisions. The approved layout drawing provides for 25 plots, internal and connecting roads, park/open space, social-infrastructure land and utility land. The final layout letter states that each site is for dwelling-unit use and specifies detached, single-family dwelling use; it also says individual building permission is to be considered separately.
The record shows a tentative layout approval dated 17 September 2025 and a final layout release dated 25 August 2026. The promoter’s Form B gives 17/09/2027 as the project completion date; the tentative approval requires the developer to complete infrastructure and amenities within two years from approval. These dates concern project completion and layout infrastructure, not RERA registration validity or an occupancy certificate for a future home. No independently verified construction-progress measurement is supplied.
3. Master plan, architecture & building design
The approved drawing is for an open-plot layout, not a multi-storey building plan. Its stated land-use schedule assigns 5,521.24 sq.m (64.67%) to plots, 1,897.23 sq.m (22.22%) to roads, 810.84 sq.m (9.50%) to organized open space/park, 222.93 sq.m (2.61%) to social infrastructure and 86.09 sq.m (1.01%) to utilities, out of 8,538.33 sq.m total net layout area. The layout parameters separately state net plot area 8,538.05 sq.m.
The drawing identifies roads of 9.14 m, 12.19 m, 12.20 m, 10.66 m existing, and 45.00 m proposed widths, as well as proposed roads identified as 30.00 m, 40'-0", 80'-0", 100'-0" and 150'-0" wide. It lists 12.20 m internal roads, including road numbers 1–14 except 15, and also references master-plan roads.
The drawing lists a tot-lot, V-CITY Tot lot, garbage pit, well and utility area. There is no building footprint, dwelling design, apartment distribution, floor configuration, FSI-counted area or dwelling-level architectural schedule in the supplied material.
4. Homes, configurations & floor plans
This is a plotted development, so the RERA offering is plots rather than apartment configurations. The layout drawing’s plot schedule states 25 plots and is reported as complete in the drawing-derived data. The plot count and sizes are software-read from the approved drawing, not a separate RERA unit disclosure; verify them against the drawing.
Plots shown: 25
Smallest / median / largest drawing-derived plot size: 146.37 / 195.47 / 804.94 sq.m; 175.1 / 233.8 / 962.7 sq.yd
Size bands (sq.yd): 150–200: 4; 200–250: 14; 250–300: 4; 300–400: 2; 500–1000: 1
Booked / available: Not supplied
No dwelling floor plans or measured carpet-area figures are available. The supplied floor-plan review records two layout sheets and no dwelling plans with measured areas.
5. Parking & vehicle circulation
The layout-plan land-use schedule records 0.00 sq.m as common parking area. No sanctioned parking-space count, visitor or accessible parking provision, vehicle ramp, parking level, EV charging provision or plot-specific parking allocation is supplied. The drawing identifies internal roads, including 12.20 m internal roads; this does not establish a parking allocation or exclusive parking right.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 810.84 sq.m; 9.50% of the drawing’s net-layout area | Shown in layout; completion not independently verified | |
| Social infrastructure | 222.93 sq.m; 2.61% | Land allocated; facility delivery not independently verified | |
| Tot-lot / V-CITY Tot lot | Facility labels on layout drawing; no size supplied | Shown/listed; completion not independently verified | |
| Garbage pit | Listed on layout drawing; no size supplied | Shown/listed; completion not independently verified | |
| Utility area | 86.09 sq.m; 1.01% | Land allocated; utility installations not independently verified |
The tentative layout approval requires the developer to hand over open space, utilities and roads to the municipality by registered gift deed before release of the tentative layout. The final-layout record refers to a registered gift deed, but its number is illegible in the supplied extraction.
7. Utilities, building services & safety
The tentative-layout approval lists a water reservoir, septic tank/sewerage treatment plant, electric transformer, solid-waste management, overhead tank, storm-water drains, underground drainage lines, street lights, avenue plantation and rainwater-harvesting pits. These are approval-recorded infrastructure items, not independently verified as completed; the approval also requires infrastructure and amenities to be completed within two years of 17 September 2025.
The final-layout conditions require rainwater-harvesting structures and state a minimum 3 m (10'-0") safety distance from high-tension electricity lines when individual residential buildings are approved. Individual building permissions are to be considered separately. No capacities, detailed treatment specifications, electrical-backup system, fire-safety design, security system, accessibility plan or dwelling-level services schedule are supplied.
8. Location, access & connectivity
The registered location is Madikonda Revenue Village, Khazipet mandal, Warangal Urban district, PIN 506142. The approved layout drawing shows road access and internal road widths, including a 10.66 MT WIDE EXISTING road and a 45.00 MT WIDE PROPOSED ROAD. The final-layout conditions require internal roads to remain open to provide access to neighbouring lands.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 102.2 km. The location geocode is associated with Government Ayurvedic Dispensary, Madikonda (Regular), Madikonda, Kazipet, Hanumakonda. No public-transport details or other verified distance measurements are supplied.
9. Developer & development status
The registered promoter is SVS GK DEVELOPERS AND CONSTRUCTIONS, identified as a partnership. The supplied firm record gives registration number 378 of 2020 at Warangal; the partners listed in the record are Karunakar Goke and Kalpana Goke. The RERA filing identifies KARUNAKAR GOKE as authorized signatory.
The promoter’s registered address is recorded as SRI NILAYAM, CHAITHANYAPURI, MADIKONDA, MADIKONDA, Khazipet, Warangal Urban, 506142. The supplied GSTIN is 36AEEFS7512M1ZN. A promoter website is listed as svsgkrealty.com; it is not used here to establish project specifications.
The promoter’s Form B states a completion date of 17/09/2027. The layout approval sets an infrastructure-and-amenities completion period of two years from 17 September 2025. No independent construction-progress assessment is supplied.
10. Approvals, official records & documents
| Reference / date | P00300010236; valid 17/09/2025–17/09/2027 |
|---|---|
| What it evidences | Registration of SVS GK PHASE-V and stated registration conditions. |
| Reference / date | File TS/019833/2025; plan 0132/LO/3006/2025; dated 17 September 2025 |
|---|---|
| What it evidences | Tentative open-plot layout plan for the three project survey subdivisions and 25 plots, with stated layout conditions. |
| Reference / date | 0293/GWMC/SWFL/2026; dated 25/08/2026 |
|---|---|
| What it evidences | Final layout release for 25 plots at Madikonda. The cited registered gift-deed number is illegible in the supplied text extraction. |
| Reference / date | Filed promoter declaration |
|---|---|
| What it evidences | Declares project completion by 17/09/2027, 70% separate-account undertaking, audit and other promoter commitments. |
| Reference / date | 378 of 2020, Warangal |
|---|---|
| What it evidences | Acknowledgement of partnership-firm registration; the document does not itself establish project land title. |
No dwelling-building approval or dwelling occupancy certificate is established by these layout records. The supplied architect certificate and final-layout record refer to a layout-related completion/final-layout process; they do not establish occupancy certification for an individual home on a plot.
Frequently asked questions
Is SVS GK PHASE-V registered with Telangana RERA?
Yes. SVS GK PHASE-V is registered with the Telangana Real Estate Regulatory Authority as P00300010236; the registration status is New Project.
Who is the developer of SVS GK PHASE-V?
The promoter named in the RERA registration is SVS GK DEVELOPERS AND CONSTRUCTIONS.
Where is SVS GK PHASE-V located?
SVS GK PHASE-V is in MADIKONDA, Khazipet, Hanamkonda, Telangana (506142).
When will SVS GK PHASE-V be completed?
The promoter's proposed date of completion filed with RERA is 17/01/2028. This is the promoter's declaration, not a guarantee.