Mewa
MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION · Vikarabad · RERA P02100010408
MEWA is a plotted development in Alampally, Vikarabad Mandal, Vikarabad District, developed by MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION. The RERA filing records a total area of 15983.99 sq. m, and the tentative layout approval identifies 60 plots; plot-size configurations are not stated. The project is registered with TG-RERA under P02100010408, with a proposed completion date of 18th November 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | MEWA RERA record |
| Project type | Plotted development / layout RERA record |
| Phase or registered portion | Phase not separately identified in the supplied record; registration refers to the MEWA project |
| TG-RERA registration | P02100010408 |
| Registration validity | Certificate states 18/11/2022 to 18/11/2024; no extension is recorded in the supplied certificate |
| Registered promoter | MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION |
| RERA status | The filing labels the project “On-Going Project.” The certificate states its registration validity ended on 18/11/2024; registration validity and the project’s completion/occupancy status are separate matters. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Alampally RERA record |
| Revenue village(s) | The RERA certificate identifies Alampally; the tentative layout approval describes the site as Dhannaram Revenue Village. |
| Mandal / district / PIN | Vikarabad / Vikarabad / 501101 |
| Project survey numbers | Sy. Nos. 149 and 150 |
| Subdivisions | The RERA filing names the parent survey numbers, not the project’s specific subdivisions. RERA filing |
| Registered area | RERA filing: total area 15983.99 sq. m, affected area 76.59 sq. m, net area 15907.40 sq. m. RERA filing |
| Tentative layout extent | 3 Acer 37.99 Gts 19117 Sq. Yds |
| Boundaries in RERA filing | East: Road and land in Survey No. 149; west: land in Survey Nos. 151 and 152; north: land in Survey No. 152; south: land in Survey No. 149 of Prameela. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Vikarabad Municipality/Municipal Corporation |
| Principal layout approval | 0006/LO/3042/2022, described as approval for a tentative layout plan, dated 18 November, 2022 |
| Application / portal reference | 002162/LO/DTCP/3042/0012/2021 |
| Plots in tentative approval | 60 No's |
| Approved built-up area / buildings and floors | Not disclosed for this plotted layout in the supplied records. |
| Reserved land stated in approval | Open space (Park): 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%); social infrastructure: 0 Acer 3.95 Gts 479 Sq. Yds (2.52%); utilities: 0 Acer 1.57 Gts 190 Sq. Yds (1%); roads: 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%); plotted area: 2 Acer 2.23 Gts 9950 Sq. Yds (52.3%). |
| Mortgage area in tentative approval | 0 Acer 13.02 Gts 1576 Sq. Yds, stated as 15.72 % of plotted area; the approval identifies plots 45–46 and 53–60 as mortgaged in favour of the Municipality/Municipal Corporation. |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; 60 plots are identified in the tentative layout approval. Plot-size bands and plot-wise areas are not available in the supplied data. Layout record |
| Booked / available | Not disclosed in the supplied project records. |
| Construction / infrastructure progress | No independently verified site-progress assessment is supplied. The RERA filing’s amenity percentages are portal declarations, not independent verification. RERA amenities |
| Completion date | Promoter’s Form B undertakes completion by 18th November 2024; the RERA certificate also states validity ending 18/11/2024. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records; the project is identified as a plotted layout. RERA record Document index |
2. The project story
MEWA is a plotted-layout project registered with TG-RERA as P02100010408, located in the Alampally area of Vikarabad. The RERA filing identifies Sy. Nos. 149 and 150; the tentative layout approval describes the land as being in Dhannaram Revenue Village, Vikarabad Mandal, Vikarabad District.
The tentative approval identifies a layout of 60 plots, with land also allocated to roads, a park/open space, social infrastructure and utilities. It requires the applicant to carry out infrastructure and other works, and states that final layout release and development permissions are subject to completion of the stated development works and release of the mortgaged plots. These are approval conditions, not evidence that the works have been completed.
The promoter’s Form B states a completion undertaking of 18th November 2024. The supplied material does not establish the current on-site completion status or whether a completion certificate has been issued. Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The tentative layout approval identifies 60 plots and reports 52.3% plotted area, 35.14% roads, 9.04% open space/park, 2.52% social infrastructure and 1% utilities. The approval also identifies a mortgage area equal to 15.72 % of plotted area.
The RERA filing reports a total site area of 15983.99 sq. m, an affected area of 76.59 sq. m, and a net area of 15907.40 sq. m. The drawing-derived layout record separately gives a land-use-table base of 15907.02 sq. m; its plot count is read from the drawing’s printed plot numbers 1 to 60, and the source cautions that drawing-based figures should be verified against the drawing. RERA filing Layout record
The tentative approval names water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, solid-waste management, overhead tank, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights and rainwater-harvesting pits among the works or utilities. No building count, floor configuration, building footprint, parking levels or residential/commercial building-area split is applicable or established in the supplied layout records.
4. Homes, configurations & floor plans
The offering recorded here is plots, not apartments. The tentative layout approval identifies 60 plots, but plot-wise sizes, size bands, booking status and availability are not disclosed in the supplied data. Layout record
| Plot / land-use item | Record |
|---|---|
| Plots | 60 No's in the tentative layout approval; plot-size range not disclosed |
| Plotted area | 2 Acer 2.23 Gts 9950 Sq. Yds (52.3%) in the approval |
| Roads | 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%) in the approval |
| Open space (Park) | 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%) in the approval |
| Social infrastructure | 0 Acer 3.95 Gts 479 Sq. Yds (2.52%) in the approval |
| Utilities | 0 Acer 1.57 Gts 190 Sq. Yds (1%) in the approval |
Apartment configuration counts, RERA saleable areas and carpet-area measurements are not applicable to the plotted offering on the evidence supplied. The drawing-based record confirms two layout sheets and no apartment floor plans. Floor plans
5. Parking & vehicle circulation
The supplied approval and layout information describes roads and plot access, but does not state parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking arrangement. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall/fencing around the site.
The approval mentions “Road formation with black top” among its sanctioned parameters; the supplied records do not independently verify the road works as completed.
6. Amenities, recreation & open spaces
The table below distinguishes approval-recorded works from portal-reported status. “YES / 100%” in the RERA amenity record is a portal declaration; it is not independent confirmation of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%); the approval records an open-space gift deed in favour of the Municipality. | Reserved in the approval; current delivery not independently verified. | |
| Social infrastructure | 0 Acer 3.95 Gts 479 Sq. Yds (2.52%) | Reserved in the approval; facility type and delivery status not established. | |
| Community buildings | No size or specification supplied. | RERA amenities | Portal record shows 0%; no completed facility verified. |
| Internal roads and footpaths | Road area stated as 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%); approval mentions road formation with black top. | RERA amenities | Portal record says YES / 100% for internal roads and footpaths; not independently verified. |
| Green strip / tot lot / park | Park/open-space area stated above. | RERA amenities | Portal record says YES / 100%; not independently verified. |
| Street lighting | No quantity or specification supplied. | RERA amenities | Portal record says YES / 100%; not independently verified. |
| Solid-waste management and disposal | No capacity or detailed facility specification supplied. | RERA amenities | Portal record says YES / 100%; not independently verified. |
7. Utilities, building services & safety
The tentative layout approval names a water reservoir, overhead tank, internal water-supply pipelines, septic tank, Sewerage Treatment Plant, underground drainage lines, storm-water drains, rainwater-harvesting pits, electric transformer, street lights and solid-waste management. The approval identifies 0 Acer 1.57 Gts 190 Sq. Yds (1%) for utilities and records that utilities land is to be gifted to the Municipality. It does not provide capacities or confirm installation or commissioning.
The RERA amenity record reports water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, rainwater harvesting and an electrical meter room/sub-station/receiving station as YES / 100%. These are filed portal declarations, not independently verified service status. The same record shows 0% for fire protection/fire-safety requirements and energy management; no project-specific fire-system description or clearance is supplied. RERA amenities
Vendor-listed items include borewell water, power backup, CCTV, security, sewage treatment, fire safety and rainwater harvesting, but these are third-party listing claims and are not established as sanctioned or delivered by the supplied project documents. Promoter website
8. Location, access & connectivity
The official RERA record places the project in Alampally, Vikarabad Mandal, Vikarabad District, PIN 501101. The layout approval describes the site as in Dhannaram Revenue Village and requires roads to be opened to provide access to neighbouring sites.
The supplied location record gives the cadastral parcel centroid as 17.346005892105612, 77.92116381910705 and lists the nearest sampled Outer Ring Road interchange at approximately 41.4 km. This is a measured location-data distance, not a travel-time estimate. Location record
No project-specific public-transport routes or nearby landmark distances are provided. A vendor listing makes general connectivity claims, but supplies no measured route or distance. Promoter website
9. Developer & development status
The registered promoter is MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION, recorded as an organization of type Societies. The RERA-recorded address is Village: Alampally, Mandal: Vikarabad, District: Vikarabad, Pin: 501101. The supplied records do not establish a corporate identification number, official website or project contact details. Corporate record
The promoter’s Form B is an affidavit-cum-declaration made by MD.SHAREEF, authorized by the association. It declares the land free from encumbrances, states a completion undertaking of 18th November 2024, and includes declarations concerning project funds, approvals and allottee treatment. These are promoter declarations.
The project filing labels MEWA “On-Going Project,” while the supplied registration certificate states its registration validity ended on 18/11/2024. No extension order, independently verified construction assessment or occupancy/completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Reference and scope | P02100010408, Form C; issued 23/12/2025 |
|---|---|
| What it establishes | Records MEWA, the registered promoter and project survey numbers 149 and 150; states validity from 18/11/2022 to 18/11/2024. |
| Reference and scope | Vikarabad Municipality/Municipal Corporation; 0006/LO/3042/2022, dated 18 November, 2022 |
|---|---|
| What it establishes | Tentative layout approval for Sy. Nos. 149 and 150, described as Dhannaram Revenue Village, with 60 plots, reserved areas, infrastructure conditions and mortgaged plots. |
| Reference and scope | 002162/LO/DTCP/3042/0012/2021 |
|---|---|
| What it establishes | Application reference appearing in the tentative layout approval. |
| Reference and scope | Promoter affidavit by MD.SHAREEF, authorized signatory |
|---|---|
| What it establishes | Promoter declarations, including the stated completion undertaking and land-encumbrance declaration. |
| Reference and scope | Two layout sheets; plot count read from printed plot numbers 1–60 Layout record |
|---|---|
| What it establishes | Software-measured/drawing-derived land-use information; plot sizes are not available, and the source cautions that drawing readings should be verified. |
The supplied records do not include a separate final layout-release record, a completion certificate or an occupancy certificate. The tentative approval itself states that development works must be completed and the mortgaged land released before final layout release and development permissions.
1. Project at a glance
Project identity
Registered project name: MEWA
Project type: Plotted development / layout
Phase or registered portion: Phase not separately identified in the supplied record; registration refers to the MEWA project
TG-RERA registration: P02100010408
Registration validity: Certificate states 18/11/2022 to 18/11/2024; no extension is recorded in the supplied certificate
Registered promoter: MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION
RERA status: The filing labels the project “On-Going Project.” The certificate states its registration validity ended on 18/11/2024; registration validity and the project’s completion/occupancy status are separate matters.
Land and geographic identity
Locality: Alampally
Revenue village(s): The RERA certificate identifies Alampally; the tentative layout approval describes the site as Dhannaram Revenue Village.
Mandal / district / PIN: Vikarabad / Vikarabad / 501101
Project survey numbers: Sy. Nos. 149 and 150
Subdivisions: The RERA filing names the parent survey numbers, not the project’s specific subdivisions.
Registered area: RERA filing: total area 15983.99 sq. m, affected area 76.59 sq. m, net area 15907.40 sq. m.
Tentative layout extent: 3 Acer 37.99 Gts 19117 Sq. Yds
Boundaries in RERA filing: East: Road and land in Survey No. 149; west: land in Survey Nos. 151 and 152; north: land in Survey No. 152; south: land in Survey No. 149 of Prameela.
Development identity
Sanctioning authority: Vikarabad Municipality/Municipal Corporation
Principal layout approval: 0006/LO/3042/2022, described as approval for a tentative layout plan, dated 18 November, 2022
Application / portal reference: 002162/LO/DTCP/3042/0012/2021
Plots in tentative approval: 60 No's
Approved built-up area / buildings and floors: Not disclosed for this plotted layout in the supplied records.
Reserved land stated in approval: Open space (Park): 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%); social infrastructure: 0 Acer 3.95 Gts 479 Sq. Yds (2.52%); utilities: 0 Acer 1.57 Gts 190 Sq. Yds (1%); roads: 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%); plotted area: 2 Acer 2.23 Gts 9950 Sq. Yds (52.3%).
Mortgage area in tentative approval: 0 Acer 13.02 Gts 1576 Sq. Yds, stated as 15.72 % of plotted area; the approval identifies plots 45–46 and 53–60 as mortgaged in favour of the Municipality/Municipal Corporation.
Offering and status
Offering: Plots; 60 plots are identified in the tentative layout approval. Plot-size bands and plot-wise areas are not available in the supplied data.
Booked / available: Not disclosed in the supplied project records.
Construction / infrastructure progress: No independently verified site-progress assessment is supplied. The RERA filing’s amenity percentages are portal declarations, not independent verification.
Completion date: Promoter’s Form B undertakes completion by 18th November 2024; the RERA certificate also states validity ending 18/11/2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records; the project is identified as a plotted layout.
2. The project story
MEWA is a plotted-layout project registered with TG-RERA as P02100010408, located in the Alampally area of Vikarabad. The RERA filing identifies Sy. Nos. 149 and 150; the tentative layout approval describes the land as being in Dhannaram Revenue Village, Vikarabad Mandal, Vikarabad District.
The tentative approval identifies a layout of 60 plots, with land also allocated to roads, a park/open space, social infrastructure and utilities. It requires the applicant to carry out infrastructure and other works, and states that final layout release and development permissions are subject to completion of the stated development works and release of the mortgaged plots. These are approval conditions, not evidence that the works have been completed.
The promoter’s Form B states a completion undertaking of 18th November 2024. The supplied material does not establish the current on-site completion status or whether a completion certificate has been issued.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The tentative layout approval identifies 60 plots and reports 52.3% plotted area, 35.14% roads, 9.04% open space/park, 2.52% social infrastructure and 1% utilities. The approval also identifies a mortgage area equal to 15.72 % of plotted area.
The RERA filing reports a total site area of 15983.99 sq. m, an affected area of 76.59 sq. m, and a net area of 15907.40 sq. m. The drawing-derived layout record separately gives a land-use-table base of 15907.02 sq. m; its plot count is read from the drawing’s printed plot numbers 1 to 60, and the source cautions that drawing-based figures should be verified against the drawing.
The tentative approval names water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, solid-waste management, overhead tank, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights and rainwater-harvesting pits among the works or utilities. No building count, floor configuration, building footprint, parking levels or residential/commercial building-area split is applicable or established in the supplied layout records.
4. Homes, configurations & floor plans
The offering recorded here is plots, not apartments. The tentative layout approval identifies 60 plots, but plot-wise sizes, size bands, booking status and availability are not disclosed in the supplied data.
Plots: 60 No's in the tentative layout approval; plot-size range not disclosed
Plotted area: 2 Acer 2.23 Gts 9950 Sq. Yds (52.3%) in the approval
Roads: 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%) in the approval
Open space (Park): 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%) in the approval
Social infrastructure: 0 Acer 3.95 Gts 479 Sq. Yds (2.52%) in the approval
Utilities: 0 Acer 1.57 Gts 190 Sq. Yds (1%) in the approval
Apartment configuration counts, RERA saleable areas and carpet-area measurements are not applicable to the plotted offering on the evidence supplied. The drawing-based record confirms two layout sheets and no apartment floor plans.
5. Parking & vehicle circulation
The supplied approval and layout information describes roads and plot access, but does not state parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking arrangement. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall/fencing around the site.
The approval mentions “Road formation with black top” among its sanctioned parameters; the supplied records do not independently verify the road works as completed.
6. Amenities, recreation & open spaces
The table below distinguishes approval-recorded works from portal-reported status. “YES / 100%” in the RERA amenity record is a portal declaration; it is not independent confirmation of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 0 Acer 14.22 Gts 1720 Sq. Yds (9.04%); the approval records an open-space gift deed in favour of the Municipality. | Reserved in the approval; current delivery not independently verified. | |
| Social infrastructure | 0 Acer 3.95 Gts 479 Sq. Yds (2.52%) | Reserved in the approval; facility type and delivery status not established. | |
| Community buildings | No size or specification supplied. | Portal record shows 0%; no completed facility verified. | |
| Internal roads and footpaths | Road area stated as 1 Acer 15.26 Gts 6686 Sq. Yds (35.14%); approval mentions road formation with black top. | Portal record says YES / 100% for internal roads and footpaths; not independently verified. | |
| Green strip / tot lot / park | Park/open-space area stated above. | Portal record says YES / 100%; not independently verified. | |
| Street lighting | No quantity or specification supplied. | Portal record says YES / 100%; not independently verified. | |
| Solid-waste management and disposal | No capacity or detailed facility specification supplied. | Portal record says YES / 100%; not independently verified. |
7. Utilities, building services & safety
The tentative layout approval names a water reservoir, overhead tank, internal water-supply pipelines, septic tank, Sewerage Treatment Plant, underground drainage lines, storm-water drains, rainwater-harvesting pits, electric transformer, street lights and solid-waste management. The approval identifies 0 Acer 1.57 Gts 190 Sq. Yds (1%) for utilities and records that utilities land is to be gifted to the Municipality. It does not provide capacities or confirm installation or commissioning.
The RERA amenity record reports water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, rainwater harvesting and an electrical meter room/sub-station/receiving station as YES / 100%. These are filed portal declarations, not independently verified service status. The same record shows 0% for fire protection/fire-safety requirements and energy management; no project-specific fire-system description or clearance is supplied.
Vendor-listed items include borewell water, power backup, CCTV, security, sewage treatment, fire safety and rainwater harvesting, but these are third-party listing claims and are not established as sanctioned or delivered by the supplied project documents.
8. Location, access & connectivity
The official RERA record places the project in Alampally, Vikarabad Mandal, Vikarabad District, PIN 501101. The layout approval describes the site as in Dhannaram Revenue Village and requires roads to be opened to provide access to neighbouring sites.
The supplied location record gives the cadastral parcel centroid as 17.346005892105612, 77.92116381910705 and lists the nearest sampled Outer Ring Road interchange at approximately 41.4 km. This is a measured location-data distance, not a travel-time estimate.
No project-specific public-transport routes or nearby landmark distances are provided. A vendor listing makes general connectivity claims, but supplies no measured route or distance.
9. Developer & development status
The registered promoter is MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION, recorded as an organization of type Societies. The RERA-recorded address is Village: Alampally, Mandal: Vikarabad, District: Vikarabad, Pin: 501101. The supplied records do not establish a corporate identification number, official website or project contact details.
The promoter’s Form B is an affidavit-cum-declaration made by MD.SHAREEF, authorized by the association. It declares the land free from encumbrances, states a completion undertaking of 18th November 2024, and includes declarations concerning project funds, approvals and allottee treatment. These are promoter declarations.
The project filing labels MEWA “On-Going Project,” while the supplied registration certificate states its registration validity ended on 18/11/2024. No extension order, independently verified construction assessment or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Reference and scope | P02100010408, Form C; issued 23/12/2025 |
|---|---|
| What it establishes | Records MEWA, the registered promoter and project survey numbers 149 and 150; states validity from 18/11/2022 to 18/11/2024. |
| Reference and scope | Vikarabad Municipality/Municipal Corporation; 0006/LO/3042/2022, dated 18 November, 2022 |
|---|---|
| What it establishes | Tentative layout approval for Sy. Nos. 149 and 150, described as Dhannaram Revenue Village, with 60 plots, reserved areas, infrastructure conditions and mortgaged plots. |
| Reference and scope | 002162/LO/DTCP/3042/0012/2021 |
|---|---|
| What it establishes | Application reference appearing in the tentative layout approval. |
| Reference and scope | Promoter affidavit by MD.SHAREEF, authorized signatory |
|---|---|
| What it establishes | Promoter declarations, including the stated completion undertaking and land-encumbrance declaration. |
| Reference and scope | Two layout sheets; plot count read from printed plot numbers 1–60 |
|---|---|
| What it establishes | Software-measured/drawing-derived land-use information; plot sizes are not available, and the source cautions that drawing readings should be verified. |
The supplied records do not include a separate final layout-release record, a completion certificate or an occupancy certificate. The tentative approval itself states that development works must be completed and the mortgaged land released before final layout release and development permissions.
Frequently asked questions
Is MEWA registered with Telangana RERA?
Yes. MEWA is registered with the Telangana Real Estate Regulatory Authority as P02100010408; the registration status is On-Going Project.
Who is the developer of MEWA?
The promoter named in the RERA registration is MINORTY (MUSLIM) EMPLOYEES WELFARE ASSOCIATION.
Where is MEWA located?
MEWA is in Alampally, Vikarabad, Telangana (501101).
When will MEWA be completed?
The promoter's proposed date of completion filed with RERA is 18/11/2024. This is the promoter's declaration, not a guarantee.