Mythri 2
KUNTI YELLANNAGARI · Vikarabad · RERA P02100009569
MYTHRI 2 is a new plotted development of open plots beside Tirumala Venture, Pargi to Shadnagar Road, Pargi, Pargi Mandal, Vikarabad District. The registered promoter is KUNTI YELLANNAGARI KRISHNA REDDY. The registered site extent is 27847.26 sq.mt. and the layout comprises 96 open plots; plot sizes are 80.48–326.72 sq.m. TG-RERA registration number P02100009569 is valid from 4 January 2024 to 4 January 2026, and the promoter’s Form B declares completion by 04.01.2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MYTHRI 2 RERA record |
| Project type / phase | New plotted development; the registered portion is described as a layout with open plots. No separate phase number is disclosed. RERA record RERA filing |
| TG-RERA registration | P02100009569 RERA record |
| Registration validity | 4 January 2024 to 4 January 2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy status. RERA record |
| Registered promoter | KUNTI YELLANNAGARI KRISHNA REDDY (also shown in the project header as KUNTI YELLANNAGARI). RERA record Corporate record |
| RERA status in supplied record | Registered; no extension record is supplied. Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address | Beside Tirumala Venture, Pargi to Shadnagar Road, Pargi, PIN 501501. RERA filing Parties record |
| Revenue village | Pargi (also written as Parigi in approval-document text). RERA filing |
| Mandal / district | Pargi Mandal, Vikarabad District. RERA filing |
| Project survey number(s) and subdivision(s) | 307/PART; the layout documents also write this as 307/PARTOF. RERA record Land records |
| Registered site extent | 27847.26 sq.mt. RERA filing |
| Net / total area | RERA-filed net and total area: 27847.26 sq.mts. The layout drawing separately states “Total net layout 27847.18 sq.mt.” RERA filing |
| Boundaries as filed | North: existing 33 feet road and other land; South: other remaining land in Sy. No. 307; East: other land in Sy. No. 307; West: other land. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority / principal approval | Approval for tentative layout plan, 0009/LO/3124/2024, issued by Parigi Municipality/Municipal Corporation; approval date shown as 01/04/2024 4:57:18 PM. The RERA filing identifies DTCP as the authority for the plan approval. Approvals record |
| Earlier file / application identifiers | File No. G/226/2019; application No. 009532/LO/DTCP/3124/0016/2023. Approvals record |
| Approved built-up area | 0.00 proposed built-up area excluding parking and 0.00 including parking in the filed layout-plan details; the RERA form also lists approved built-up area as 15881.55 sqmts, identified in the layout area statement as plotted area. RERA filing |
| Buildings / floors | No building count or sanctioned floor configuration is disclosed for this plotted layout. |
| Approved / RERA-declared offering | 96 individual sub-plots in the layout plan and 96 plots in the approval extraction. Layout record |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Open plots. The layout drawing’s plot schedule is software-read; the plot count is stated as 96. RERA record Layout record |
| Plot sizes | Software-measured from the layout drawing: 80.48–326.72 sq.m (approximately 96.3–390.8 sq.yd); median 153.28 sq.m (approximately 183.3 sq.yd). Layout record |
| Booked / available | Not disclosed in the supplied project data. |
| Construction / development stage | The RERA amenity record reports internal roads/footpaths and green strip/tot-lot/park at 50%, and sewerage at 30%; other listed infrastructure items show 0% or no reported progress. These are reported progress fields, not independent site verification. RERA amenities |
| Completion undertaking | Promoter’s Form B declares completion by 04.01.2026. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. This is a plotted layout; the record does not establish an OC or completion certificate for the layout. Document index Approvals record |
2. The project story
MYTHRI 2 is registered as a new plotted layout on land identified as Survey No. 307/PART, in Pargi revenue village and mandal, Vikarabad District. The project record describes 96 open plots, with internal roads and areas set aside for parks/open space, utilities and social infrastructure. The layout plan identifies a tot-lot. RERA record RERA filing Layout record
The promoter’s Form B gives 04.01.2026 as the completion undertaking. The supplied RERA progress data is partial: roads/footpaths and park/tot-lot are reported at 50%, and sewerage at 30%; these figures are portal-reported, not independently confirmed by a site inspection. No completion or occupancy certificate is included in the supplied materials. RERA amenities Document index
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or tower development. The layout-plan records identify 96 individual sub-plots and show internal roads, park/open-space land, social-infrastructure land and utility land. The filed layout lists these road widths: 10.06 MT WIDE EXISTING ROAD, 10.06 MT WIDE PROPOSED ROAD, 18.29 M InternalRoad, and 9.14 M InternalRoad.
The RERA-filed land-use schedule gives 15881.55 sq.m for plotted area, 8459.52 sq.m for roads, 2507.83 sq.m for organized open space/park, 717.90 sq.m for social infrastructure and 280.38 sq.m for utilities. Amenity area is recorded as 0.00 in the schedule.
The layout materials list proposed infrastructure and works including road formation, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, street lights, avenue planting, park development and rainwater-harvesting pits. These are approval-document requirements/descriptions, not evidence that the works have been completed.
The supplied floor-plan review contains two layout sheets and no building floor plans with flats. Building count, floor configuration, building footprint, height and apartment distribution are therefore not applicable or not disclosed for this plotted development. Floor plans
4. Homes, configurations & floor plans
The offering is plots rather than homes. The layout plan states 96 individual sub-plots. The plot count and sizes below were read by software from the drawing; the source notes that plot sizes should be checked against the drawing. Layout record
| Plot offering | Count | Booked | Available | Software-measured size |
|---|---|---|---|---|
| Open plots | 96 | Not disclosed | Not disclosed | 80.48–326.72 sq.m; median 153.28 sq.m |
The drawing-derived size distribution is: 1 plot in the 0–100 sq.yd band; 63 in 150–200 sq.yd; 20 in 200–250 sq.yd; 8 in 250–300 sq.yd; and 4 in 300–400 sq.yd. These are software-measured bands, not RERA-filed unit-area declarations. Layout record
No apartment configurations, carpet areas, saleable areas, room dimensions or apartment floor plans are supplied. RERA unit table Floor plans
5. Parking & vehicle circulation
The filed layout records 0.00 for common parking area. No parking-space count, visitor or accessible parking allocation, vehicle-ramp arrangement, EV charging provision, or plot-specific parking allocation is disclosed.
The approval material lists internal roads of 18.29 M and 9.14 M, along with an existing and a proposed road each shown as 10.06 MT wide. The tentative-layout conditions require roads to remain open for access to neighbouring sites.
6. Amenities, recreation & open spaces
The layout area schedule sets aside park/open-space, social-infrastructure and utility land. The RERA progress fields indicate reported development status for selected items; they do not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2507.83 sq.m; 9.01% in the layout area schedule | Layout plan and RERA amenity record RERA amenities | Green strip/tot-lot/park reported at 50%; not independently verified complete |
| Tot-lot | Listed as a layout amenity; no size or capacity supplied | Layout-plan extraction | No separate completion evidence |
| Social infrastructure | 717.90 sq.m; 2.58% in the layout area schedule | Layout plan | RERA amenity record lists community buildings at 0% |
| Utility land | 280.38 sq.m; 1.01% in the layout area schedule | Layout plan | No completion evidence supplied |
| Internal roads and footpaths | Road area 8459.52 sq.m; road widths listed in the layout drawings | Layout plan and RERA amenity record RERA amenities | Reported at 50%; not independently verified complete |
A third-party listing mentions a swimming pool, gym, children’s play area, clubhouse and covered car parking, but these items are not established as RERA-filed or approved facilities in the supplied project record. Promoter website
7. Utilities, building services & safety
The tentative-layout approval describes proposed development works including an assured water-supply source, internal water pipelines, an overhead tank, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lights, transformer, solid-waste management and rainwater-harvesting pits. The approval also says the applicant is responsible for carrying out the infrastructure works. These statements describe required/proposed works and do not establish their completion or capacity.
RERA progress fields report sewerage (chambers, lines, septic tank/STP) at 30%; water supply, storm-water drains, street lighting, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and electrical meter/substation items are recorded at 0%. No capacities, operating status or independent commissioning evidence are supplied. RERA amenities
No building-specific lifts, fire systems, escape stairs, accessibility provisions or security systems are disclosed for this plotted layout. Document index RERA amenities
8. Location, access & connectivity
The registered location is beside Tirumala Venture on Pargi to Shadnagar Road, Pargi, Vikarabad District, Telangana, PIN 501501. The revenue identity is Pargi village and Pargi mandal; the project parcel centroid is recorded at 17.1589189922438, 77.88731536471809. RERA filing RERA record Cadastral map
The layout records an existing 33-foot road along its north boundary and lists an existing road, proposed road and internal roads. The supplied measured connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 56.1 km. No public-transport distance or journey-time measurement is supplied. RERA filing Location record
9. Developer & development status
The registered promoter is KUNTI YELLANNAGARI KRISHNA REDDY, identified in the registration certificate as residing in Pargi, Pargi Mandal, Vikarabad District, PIN 501501. The promoter’s legal-entity type, corporate registration identifier, official contact details and official website are not disclosed in the supplied project record. Corporate record
The promoter’s Form B, dated 21 December 2024, declares legal title to the project land, states that it is free from encumbrances, and undertakes completion by 04.01.2026. These are promoter declarations in the filed document. The RERA amenity fields report partial progress on some works, but there is no independent site-progress assessment or completion certificate in the supplied materials. RERA amenities Document index
10. Approvals, official records & documents
| Identifier / date | P02100009569; valid 04/01/2024–04/01/2026 |
|---|---|
| What the supplied record establishes | Form C registration certificate for MYTHRI 2 and the registered promoter. |
| Identifier / date | 0009/LO/3124/2024; approval date 01/04/2024 4:57:18 PM |
|---|---|
| What the supplied record establishes | Approval for tentative layout plan issued by Parigi Municipality/Municipal Corporation; the RERA filing also identifies DTCP as the plan authority. |
| Identifier / date | File No. G/226/2019; application No. 009532/LO/DTCP/3124/0016/2023 |
|---|---|
| What the supplied record establishes | Identifiers appearing in the filed layout documents. |
| Identifier / date | TS/054380/2023 |
|---|---|
| What the supplied record establishes | Licence number shown in the layout-plan record. |
| Identifier / date | Documents 524065, 524070, 524071 |
|---|---|
| What the supplied record establishes | Layout details, land-use schedule, plot count, roads, reserved areas and mortgage-plot information. |
| Identifier / date | Dated 21 December 2024 |
|---|---|
| What the supplied record establishes | Promoter’s filed undertakings, including the stated completion date and declarations concerning title and project funds. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the documents provided for this review. |
1. Project at a glance
Project identity
Registered project name: MYTHRI 2
Project type / phase: New plotted development; the registered portion is described as a layout with open plots. No separate phase number is disclosed.
TG-RERA registration: P02100009569
Registration validity: 4 January 2024 to 4 January 2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy status.
Registered promoter: KUNTI YELLANNAGARI KRISHNA REDDY (also shown in the project header as KUNTI YELLANNAGARI).
RERA status in supplied record: Registered; no extension record is supplied.
Land and geographic identity
Locality / address: Beside Tirumala Venture, Pargi to Shadnagar Road, Pargi, PIN 501501.
Revenue village: Pargi (also written as Parigi in approval-document text).
Mandal / district: Pargi Mandal, Vikarabad District.
Project survey number(s) and subdivision(s): 307/PART; the layout documents also write this as 307/PARTOF.
Registered site extent: 27847.26 sq.mt.
Net / total area: RERA-filed net and total area: 27847.26 sq.mts. The layout drawing separately states “Total net layout 27847.18 sq.mt.”
Boundaries as filed: North: existing 33 feet road and other land; South: other remaining land in Sy. No. 307; East: other land in Sy. No. 307; West: other land.
Development identity
Sanctioning authority / principal approval: Approval for tentative layout plan, 0009/LO/3124/2024, issued by Parigi Municipality/Municipal Corporation; approval date shown as 01/04/2024 4:57:18 PM. The RERA filing identifies DTCP as the authority for the plan approval.
Earlier file / application identifiers: File No. G/226/2019; application No. 009532/LO/DTCP/3124/0016/2023.
Approved built-up area: 0.00 proposed built-up area excluding parking and 0.00 including parking in the filed layout-plan details; the RERA form also lists approved built-up area as 15881.55 sqmts, identified in the layout area statement as plotted area.
Buildings / floors: No building count or sanctioned floor configuration is disclosed for this plotted layout.
Approved / RERA-declared offering: 96 individual sub-plots in the layout plan and 96 plots in the approval extraction.
Offering and status
Unit type: Open plots. The layout drawing’s plot schedule is software-read; the plot count is stated as 96.
Plot sizes: Software-measured from the layout drawing: 80.48–326.72 sq.m (approximately 96.3–390.8 sq.yd); median 153.28 sq.m (approximately 183.3 sq.yd).
Booked / available: Not disclosed in the supplied project data.
Construction / development stage: The RERA amenity record reports internal roads/footpaths and green strip/tot-lot/park at 50%, and sewerage at 30%; other listed infrastructure items show 0% or no reported progress. These are reported progress fields, not independent site verification.
Completion undertaking: Promoter’s Form B declares completion by 04.01.2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. This is a plotted layout; the record does not establish an OC or completion certificate for the layout.
2. The project story
MYTHRI 2 is registered as a new plotted layout on land identified as Survey No. 307/PART, in Pargi revenue village and mandal, Vikarabad District. The project record describes 96 open plots, with internal roads and areas set aside for parks/open space, utilities and social infrastructure. The layout plan identifies a tot-lot.
The promoter’s Form B gives 04.01.2026 as the completion undertaking. The supplied RERA progress data is partial: roads/footpaths and park/tot-lot are reported at 50%, and sewerage at 30%; these figures are portal-reported, not independently confirmed by a site inspection. No completion or occupancy certificate is included in the supplied materials.
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or tower development. The layout-plan records identify 96 individual sub-plots and show internal roads, park/open-space land, social-infrastructure land and utility land. The filed layout lists these road widths: 10.06 MT WIDE EXISTING ROAD, 10.06 MT WIDE PROPOSED ROAD, 18.29 M InternalRoad, and 9.14 M InternalRoad.
The RERA-filed land-use schedule gives 15881.55 sq.m for plotted area, 8459.52 sq.m for roads, 2507.83 sq.m for organized open space/park, 717.90 sq.m for social infrastructure and 280.38 sq.m for utilities. Amenity area is recorded as 0.00 in the schedule.
The layout materials list proposed infrastructure and works including road formation, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, street lights, avenue planting, park development and rainwater-harvesting pits. These are approval-document requirements/descriptions, not evidence that the works have been completed.
The supplied floor-plan review contains two layout sheets and no building floor plans with flats. Building count, floor configuration, building footprint, height and apartment distribution are therefore not applicable or not disclosed for this plotted development.
4. Homes, configurations & floor plans
The offering is plots rather than homes. The layout plan states 96 individual sub-plots. The plot count and sizes below were read by software from the drawing; the source notes that plot sizes should be checked against the drawing.
| Plot offering | Count | Booked | Available | Software-measured size |
|---|---|---|---|---|
| Open plots | 96 | Not disclosed | Not disclosed | 80.48–326.72 sq.m; median 153.28 sq.m |
The drawing-derived size distribution is: 1 plot in the 0–100 sq.yd band; 63 in 150–200 sq.yd; 20 in 200–250 sq.yd; 8 in 250–300 sq.yd; and 4 in 300–400 sq.yd. These are software-measured bands, not RERA-filed unit-area declarations.
No apartment configurations, carpet areas, saleable areas, room dimensions or apartment floor plans are supplied.
5. Parking & vehicle circulation
The filed layout records 0.00 for common parking area. No parking-space count, visitor or accessible parking allocation, vehicle-ramp arrangement, EV charging provision, or plot-specific parking allocation is disclosed.
The approval material lists internal roads of 18.29 M and 9.14 M, along with an existing and a proposed road each shown as 10.06 MT wide. The tentative-layout conditions require roads to remain open for access to neighbouring sites.
6. Amenities, recreation & open spaces
The layout area schedule sets aside park/open-space, social-infrastructure and utility land. The RERA progress fields indicate reported development status for selected items; they do not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2507.83 sq.m; 9.01% in the layout area schedule | Layout plan and RERA amenity record | Green strip/tot-lot/park reported at 50%; not independently verified complete |
| Tot-lot | Listed as a layout amenity; no size or capacity supplied | Layout-plan extraction | No separate completion evidence |
| Social infrastructure | 717.90 sq.m; 2.58% in the layout area schedule | Layout plan | RERA amenity record lists community buildings at 0% |
| Utility land | 280.38 sq.m; 1.01% in the layout area schedule | Layout plan | No completion evidence supplied |
| Internal roads and footpaths | Road area 8459.52 sq.m; road widths listed in the layout drawings | Layout plan and RERA amenity record | Reported at 50%; not independently verified complete |
A third-party listing mentions a swimming pool, gym, children’s play area, clubhouse and covered car parking, but these items are not established as RERA-filed or approved facilities in the supplied project record.
7. Utilities, building services & safety
The tentative-layout approval describes proposed development works including an assured water-supply source, internal water pipelines, an overhead tank, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lights, transformer, solid-waste management and rainwater-harvesting pits. The approval also says the applicant is responsible for carrying out the infrastructure works. These statements describe required/proposed works and do not establish their completion or capacity.
RERA progress fields report sewerage (chambers, lines, septic tank/STP) at 30%; water supply, storm-water drains, street lighting, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and electrical meter/substation items are recorded at 0%. No capacities, operating status or independent commissioning evidence are supplied.
No building-specific lifts, fire systems, escape stairs, accessibility provisions or security systems are disclosed for this plotted layout.
8. Location, access & connectivity
The registered location is beside Tirumala Venture on Pargi to Shadnagar Road, Pargi, Vikarabad District, Telangana, PIN 501501. The revenue identity is Pargi village and Pargi mandal; the project parcel centroid is recorded at 17.1589189922438, 77.88731536471809.
The layout records an existing 33-foot road along its north boundary and lists an existing road, proposed road and internal roads. The supplied measured connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 56.1 km. No public-transport distance or journey-time measurement is supplied.
9. Developer & development status
The registered promoter is KUNTI YELLANNAGARI KRISHNA REDDY, identified in the registration certificate as residing in Pargi, Pargi Mandal, Vikarabad District, PIN 501501. The promoter’s legal-entity type, corporate registration identifier, official contact details and official website are not disclosed in the supplied project record.
The promoter’s Form B, dated 21 December 2024, declares legal title to the project land, states that it is free from encumbrances, and undertakes completion by 04.01.2026. These are promoter declarations in the filed document. The RERA amenity fields report partial progress on some works, but there is no independent site-progress assessment or completion certificate in the supplied materials.
10. Approvals, official records & documents
| Identifier / date | P02100009569; valid 04/01/2024–04/01/2026 |
|---|---|
| What the supplied record establishes | Form C registration certificate for MYTHRI 2 and the registered promoter. |
| Identifier / date | 0009/LO/3124/2024; approval date 01/04/2024 4:57:18 PM |
|---|---|
| What the supplied record establishes | Approval for tentative layout plan issued by Parigi Municipality/Municipal Corporation; the RERA filing also identifies DTCP as the plan authority. |
| Identifier / date | File No. G/226/2019; application No. 009532/LO/DTCP/3124/0016/2023 |
|---|---|
| What the supplied record establishes | Identifiers appearing in the filed layout documents. |
| Identifier / date | TS/054380/2023 |
|---|---|
| What the supplied record establishes | Licence number shown in the layout-plan record. |
| Identifier / date | Documents 524065, 524070, 524071 |
|---|---|
| What the supplied record establishes | Layout details, land-use schedule, plot count, roads, reserved areas and mortgage-plot information. |
| Identifier / date | Dated 21 December 2024 |
|---|---|
| What the supplied record establishes | Promoter’s filed undertakings, including the stated completion date and declarations concerning title and project funds. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the documents provided for this review. |
Frequently asked questions
Is MYTHRI 2 registered with Telangana RERA?
Yes. MYTHRI 2 is registered with the Telangana Real Estate Regulatory Authority as P02100009569; the registration status is New Project.
Who is the developer of MYTHRI 2?
The promoter named in the RERA registration is KUNTI YELLANNAGARI.
Where is MYTHRI 2 located?
MYTHRI 2 is in PARGI TO SHADNAGAR ROAD, Pargi, Vikarabad, Telangana (501501).
When will MYTHRI 2 be completed?
The promoter's proposed date of completion filed with RERA is 04/01/2026. This is the promoter's declaration, not a guarantee.