Vivekananda Nagar
AKULA · Kumuram Bheem (Asifabad) · RERA P02600011127
VIVEKANANDA NAGAR is a plotted development in ASIFABAD, Asifbad mandal, Kumuram Bheem (Asifabad) district, developed by registered promoter AKULA SRINIVAS GOUD. The RERA-filed land area is 12,059.07 sq mts, and the layout has 41 open residential plots; building or floor configuration is not disclosed. Plot sizes are 126.22–278.02 sq.m (151.0–332.5 sq yd), measured from the layout schedule. The project is registered under TG-RERA number P02600011127, with proposed completion on 03/06/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | VIVEKANANDA NAGAR RERA record |
| Project type / phase | Plotted development; phase or other separately registered portion not disclosed. RERA record RERA filing |
| TG-RERA registration | P02600011127; registered from 03/02/2025 to 03/02/2027. The certificate records a two-year validity period; registration validity is separate from the proposed project completion date. RERA record |
| Registered promoter | AKULA SRINIVAS GOUD on the registration certificate. |
| RERA status | New Project; the supplied certificate records registration. It does not record an extension. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / street | ASIFABAD; the RERA address record gives locality ASIFABAD, while the registration certificate gives locality Sandeep nagar. RERA filing |
| Revenue village | Asifabad Village Revenue Village in the tentative layout approval; the registration certificate records Sandeep nagar. |
| Mandal / district | Asifbad mandal; Kumuram Bheem (Asifabad) district. RERA record RERA filing |
| PIN | 504293 RERA filing |
| Project survey number(s) | Sy. No. 47/2 RERA record Land records |
| RERA-filed site area | 12,059.07 sq mts total and net area in the RERA land details. RERA filing |
| Layout-plan area statement | The layout-plan details show Total Layout Area 12059.38, Net Layout Area 11629.49, and ROAD AFFECTED AREA /ROAD WIDENING AREA 429.89. The plan’s land-use table prints net layout as 11629.48. |
| Boundaries | East: ROAD; west, north and south: LAND OF OTHERS. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | Asifabad Municipality; tentative layout approval 0001/LO/3158/2025, dated 03 February, 2025. The approval document also identifies TS-DTCP and file no. G1/354/LS/2020. Approvals record |
| Approval validity / works deadline stated in approval | Approval records validity up to 03 February, 2027 and requires infrastructure and amenities to be completed within two years from approval. This is an approval condition, not the RERA registration validity. |
| Approved built-up area | The layout-plan parameters state proposed built-up area excluding parking 0.00 and including parking 0.00; no plotted-home building design is provided in the supplied project record. |
| Plot count | 41 plots, as stated in the tentative approval and layout plan. |
| Building / floor configuration | Not disclosed; this is a plotted layout, and no building-floor schedule is supplied. RERA filing |
| Plot-layout roads and land reservations | Drawing-derived road widths are 9.144, 10.05 MT, and 18.00 MT. The tentative approval states roads 18 mts and above. |
Offering and status
| Item | Record |
|---|---|
| Offering | Open residential plots; the layout drawing records 41 plots. |
| Plot-size range | Software-measured from the layout’s plot schedule: 126.22–278.02 sq.m (151.0–332.5 sq yd); verify against the drawing. Layout record |
| Booking / availability | Booked and available plot counts are not provided in the supplied evidence. |
| Proposed completion | 03/06/2027 in the RERA project information. RERA filing |
| Construction / layout-development stage | TG-RERA amenity entries report several infrastructure items at 25%; these are reported progress figures, not independently verified site observations. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval is tentative layout approval. |
2. The project story
VIVEKANANDA NAGAR is registered with TG-RERA as a plotted-development project, with land recorded under Sy. No. 47/2 and an address in Asifabad, Kumuram Bheem (Asifabad) district. The RERA record describes a 41-plot layout; the tentative layout approval is dated 03 February 2025. RERA record Land records
The filed layout distributes land among plots, roads, open space/park, social infrastructure and utilities. The approval calls for layout infrastructure—including roads, drainage, water supply, electrical lines and street lighting, park development and rainwater-harvesting pits—and requires specified open-space, utility and road areas to be handed over to the municipality by registered gift deed before release of the tentative layout. The supplied record does not establish that these works or handovers have been completed.
TG-RERA’s amenity entries show 25% for internal roads and footpaths, water supply, sewerage, green strip/tot-lot/park, street lighting, rainwater harvesting and recreational open space. These are filed progress percentages; the evidence does not provide independent site verification. RERA amenities
3. Master plan, architecture & building design
The supplied plan is a residential open-plot layout, not a building or apartment plan. The layout plan records 41 plots and land-use figures of 7702.50 for plotted area, 2463.72 for roads, 1052.61 for organized open space/park, 293.97 for social infrastructure, and 116.68 for utilities; its table gives total net layout as 11629.48 and the stated percentages are 66.23%, 21.19%, 9.05%, 2.53% and 1.00%, respectively. These are drawing-reported figures.
The same drawing lists 0.00 amenity area, alongside “Tot-lot” and “Area for Social Infrastructure Utility” in its amenities/utilities description. The tentative approval identifies the park, social-infrastructure and utility reservations and specifies development works and eventual municipal handover. No building footprint, floor configuration, building count or residential built-up schedule is supplied.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration. The layout drawing states 41 plots; plot sizes below are software-measured from its plot schedule and should be checked against the drawing. The supplied measurement record gives:
| Plot information | Record |
|---|---|
| Plot count | 41 Layout record |
| Measured plot-size range | 126.22–278.02 sq.m (151.0–332.5 sq yd) Layout record |
| Median measured plot size | 178.37 sq.m (213.3 sq yd) Layout record |
| Drawing-measured size bands | 150–200 sq yd: 3 plots; 200–250 sq yd: 33; 250–300 sq yd: 2; 300–400 sq yd: 3 Layout record |
| Common printed plot sizes | 167.23 sq.m: 13 plots; 199.52 sq.m: 10; 178.37 sq.m: 5; 195.02 sq.m: 2 Layout record |
These measurements are software-derived from the layout drawing, not RERA-filed saleable or carpet areas. Booked/available counts, plot-wise prices and allottee-specific plot allocations are not supplied. Layout record
5. Parking & vehicle circulation
The layout plan lists Common Parking Area 0.00 and does not provide a parking-space count or parking allocation. It shows internal roads and road-width entries of 9.144, 10.05 MT and 18.00 MT; the tentative approval specifies 18 mts and above and requires roads to remain open for access to neighbouring sites. No separate visitor parking, accessible parking, vehicle-entry arrangement or EV charging provision is identified in the supplied record.
6. Amenities, recreation & open spaces
The facilities below are taken from the RERA amenity entries or the tentative layout approval. Filed percentages are reported progress, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 1052.61; drawing states 9.05. Approval describes 9.05% open space and requires handover to the municipality. | RERA amenity entry: 25% for aggregate recreational open space and green strip/tot-lot/park. Completion and handover not verified. RERA amenities | |
| Tot-lot | Named in the layout-plan amenities/utilities description; no separate size provided. | No separate progress or verified-completion evidence. | |
| Social infrastructure | 293.97; drawing states 2.53. | No completed facility identified. | |
| Utilities land | 116.68; drawing states 1.00. | Reserved for utilities; no completion confirmation. | |
| Community buildings | No area or facility details supplied. | RERA amenities | RERA amenity entry: 0%. |
| Indoor / sports / other recreation | No separately specified facilities or dimensions supplied. | RERA amenities | Not established in the supplied record. |
7. Utilities, building services & safety
The tentative approval’s required layout works include storm-water drains, underground drainage lines and a common septic tank/STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines, street lights and a transformer; solid-waste management; avenue plantation; park development; and rainwater-harvesting pits. These are approval requirements, not evidence that the facilities have been completed.
TG-RERA reports 25% progress for water supply, sewerage (chamber, lines, septic tank, STP), street lighting and water conservation/rainwater harvesting. It records 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection/fire-safety requirements, and electrical meter room/sub-station/receiving station. RERA amenities
The supplied record does not state water-source or storage capacities, STP capacity, reuse arrangements, electrical capacity or backup, fire-system details, security provisions, or accessibility design. RERA amenities
8. Location, access & connectivity
The project’s RERA land record places it in Sy. No. 47/2, with locality ASIFABAD, mandal Asifbad, district Kumuram Bheem (Asifabad) and PIN 504293. The tentative layout approval describes Asifabad Village Revenue Village and Asifabad Municipality; the registration certificate records locality Sandeep nagar. Land records RERA filing
The layout drawing identifies road access on its east boundary and internal roads; the tentative approval requires roads to remain open to neighbouring sites. A location dataset lists Ralapet railway station at 2.0 km and an Outer Ring Road sampled interchange at 213.9 km; these are dataset distances, not travel-time claims. RERA filing Location record
9. Developer & development status
The TG-RERA certificate names AKULA SRINIVAS GOUD as promoter. The supplied corporate information does not establish an entity type, corporate registration identifier, registered office or official project contact details; the project record’s promoter field uses “AKULA.” Corporate record RERA record
The proposed project completion date recorded in the RERA project information is 03/06/2027. Separately, the tentative layout approval requires infrastructure and amenities within two years from 03 February, 2025, states validity up to 03 February, 2027, and provides for a possible one-year extension on specific request. No extension or completed handover is documented in the supplied material. RERA filing
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02600011127 | Form C records VIVEKANANDA NAGAR as registered from 03/02/2025 to 03/02/2027. |
| Tentative layout approval, 0001/LO/3158/2025 | Asifabad Municipality approval dated 03 February, 2025 for a tentative residential layout in Sy. No. 47/2, stating 41 plots and layout conditions. The approval states that it is not proof of title. |
| Layout-plan details, file G1/354/LS/2020; application TS/049053/2024 | Layout drawing records plot schedule, land-use statement and road widths; its OCR does not show a completed approval number or approval date. |
| Form B declaration | Filed declaration states that the land is free from encumbrances and sets out title, development and project-fund undertakings; the declarant’s name and date are OCR-rendered unclearly. |
| Allotment-letter form | A partially completed plot allotment-letter form is available; it does not establish an allotment to a named buyer. |
| Floor-plan evidence | No apartment floor plan is supplied; the drawing review records one layout sheet and no flats. Floor plans |
| Occupancy/completion certificate | None supplied. The available approval is tentative layout approval. |
1. Project at a glance
Project identity
Registered project name: VIVEKANANDA NAGAR
Project type / phase: Plotted development; phase or other separately registered portion not disclosed.
TG-RERA registration: P02600011127; registered from 03/02/2025 to 03/02/2027. The certificate records a two-year validity period; registration validity is separate from the proposed project completion date.
Registered promoter: AKULA SRINIVAS GOUD on the registration certificate.
RERA status: New Project; the supplied certificate records registration. It does not record an extension.
Land and geographic identity
Locality / street: ASIFABAD; the RERA address record gives locality ASIFABAD, while the registration certificate gives locality Sandeep nagar.
Revenue village: Asifabad Village Revenue Village in the tentative layout approval; the registration certificate records Sandeep nagar.
Mandal / district: Asifbad mandal; Kumuram Bheem (Asifabad) district.
PIN: 504293
Project survey number(s): Sy. No. 47/2
RERA-filed site area: 12,059.07 sq mts total and net area in the RERA land details.
Layout-plan area statement: The layout-plan details show Total Layout Area 12059.38, Net Layout Area 11629.49, and ROAD AFFECTED AREA /ROAD WIDENING AREA 429.89. The plan’s land-use table prints net layout as 11629.48.
Boundaries: East: ROAD; west, north and south: LAND OF OTHERS.
Development identity
Sanctioning authority / principal approval: Asifabad Municipality; tentative layout approval 0001/LO/3158/2025, dated 03 February, 2025. The approval document also identifies TS-DTCP and file no. G1/354/LS/2020.
Approval validity / works deadline stated in approval: Approval records validity up to 03 February, 2027 and requires infrastructure and amenities to be completed within two years from approval. This is an approval condition, not the RERA registration validity.
Approved built-up area: The layout-plan parameters state proposed built-up area excluding parking 0.00 and including parking 0.00; no plotted-home building design is provided in the supplied project record.
Plot count: 41 plots, as stated in the tentative approval and layout plan.
Building / floor configuration: Not disclosed; this is a plotted layout, and no building-floor schedule is supplied.
Plot-layout roads and land reservations: Drawing-derived road widths are 9.144, 10.05 MT, and 18.00 MT. The tentative approval states roads 18 mts and above.
Offering and status
Offering: Open residential plots; the layout drawing records 41 plots.
Plot-size range: Software-measured from the layout’s plot schedule: 126.22–278.02 sq.m (151.0–332.5 sq yd); verify against the drawing.
Booking / availability: Booked and available plot counts are not provided in the supplied evidence.
Proposed completion: 03/06/2027 in the RERA project information.
Construction / layout-development stage: TG-RERA amenity entries report several infrastructure items at 25%; these are reported progress figures, not independently verified site observations.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval is tentative layout approval.
2. The project story
VIVEKANANDA NAGAR is registered with TG-RERA as a plotted-development project, with land recorded under Sy. No. 47/2 and an address in Asifabad, Kumuram Bheem (Asifabad) district. The RERA record describes a 41-plot layout; the tentative layout approval is dated 03 February 2025.
The filed layout distributes land among plots, roads, open space/park, social infrastructure and utilities. The approval calls for layout infrastructure—including roads, drainage, water supply, electrical lines and street lighting, park development and rainwater-harvesting pits—and requires specified open-space, utility and road areas to be handed over to the municipality by registered gift deed before release of the tentative layout. The supplied record does not establish that these works or handovers have been completed.
TG-RERA’s amenity entries show 25% for internal roads and footpaths, water supply, sewerage, green strip/tot-lot/park, street lighting, rainwater harvesting and recreational open space. These are filed progress percentages; the evidence does not provide independent site verification.
3. Master plan, architecture & building design
The supplied plan is a residential open-plot layout, not a building or apartment plan. The layout plan records 41 plots and land-use figures of 7702.50 for plotted area, 2463.72 for roads, 1052.61 for organized open space/park, 293.97 for social infrastructure, and 116.68 for utilities; its table gives total net layout as 11629.48 and the stated percentages are 66.23%, 21.19%, 9.05%, 2.53% and 1.00%, respectively. These are drawing-reported figures.
The same drawing lists 0.00 amenity area, alongside “Tot-lot” and “Area for Social Infrastructure Utility” in its amenities/utilities description. The tentative approval identifies the park, social-infrastructure and utility reservations and specifies development works and eventual municipal handover. No building footprint, floor configuration, building count or residential built-up schedule is supplied.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration. The layout drawing states 41 plots; plot sizes below are software-measured from its plot schedule and should be checked against the drawing. The supplied measurement record gives:
Plot count: 41
Measured plot-size range: 126.22–278.02 sq.m (151.0–332.5 sq yd)
Median measured plot size: 178.37 sq.m (213.3 sq yd)
Drawing-measured size bands: 150–200 sq yd: 3 plots; 200–250 sq yd: 33; 250–300 sq yd: 2; 300–400 sq yd: 3
Common printed plot sizes: 167.23 sq.m: 13 plots; 199.52 sq.m: 10; 178.37 sq.m: 5; 195.02 sq.m: 2
These measurements are software-derived from the layout drawing, not RERA-filed saleable or carpet areas. Booked/available counts, plot-wise prices and allottee-specific plot allocations are not supplied.
5. Parking & vehicle circulation
The layout plan lists Common Parking Area 0.00 and does not provide a parking-space count or parking allocation. It shows internal roads and road-width entries of 9.144, 10.05 MT and 18.00 MT; the tentative approval specifies 18 mts and above and requires roads to remain open for access to neighbouring sites. No separate visitor parking, accessible parking, vehicle-entry arrangement or EV charging provision is identified in the supplied record.
6. Amenities, recreation & open spaces
The facilities below are taken from the RERA amenity entries or the tentative layout approval. Filed percentages are reported progress, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 1052.61; drawing states 9.05. Approval describes 9.05% open space and requires handover to the municipality. | RERA amenity entry: 25% for aggregate recreational open space and green strip/tot-lot/park. Completion and handover not verified. | |
| Tot-lot | Named in the layout-plan amenities/utilities description; no separate size provided. | No separate progress or verified-completion evidence. | |
| Social infrastructure | 293.97; drawing states 2.53. | No completed facility identified. | |
| Utilities land | 116.68; drawing states 1.00. | Reserved for utilities; no completion confirmation. | |
| Community buildings | No area or facility details supplied. | RERA amenity entry: 0%. | |
| Indoor / sports / other recreation | No separately specified facilities or dimensions supplied. | Not established in the supplied record. |
7. Utilities, building services & safety
The tentative approval’s required layout works include storm-water drains, underground drainage lines and a common septic tank/STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines, street lights and a transformer; solid-waste management; avenue plantation; park development; and rainwater-harvesting pits. These are approval requirements, not evidence that the facilities have been completed.
TG-RERA reports 25% progress for water supply, sewerage (chamber, lines, septic tank, STP), street lighting and water conservation/rainwater harvesting. It records 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection/fire-safety requirements, and electrical meter room/sub-station/receiving station.
The supplied record does not state water-source or storage capacities, STP capacity, reuse arrangements, electrical capacity or backup, fire-system details, security provisions, or accessibility design.
8. Location, access & connectivity
The project’s RERA land record places it in Sy. No. 47/2, with locality ASIFABAD, mandal Asifbad, district Kumuram Bheem (Asifabad) and PIN 504293. The tentative layout approval describes Asifabad Village Revenue Village and Asifabad Municipality; the registration certificate records locality Sandeep nagar.
The layout drawing identifies road access on its east boundary and internal roads; the tentative approval requires roads to remain open to neighbouring sites. A location dataset lists Ralapet railway station at 2.0 km and an Outer Ring Road sampled interchange at 213.9 km; these are dataset distances, not travel-time claims.
9. Developer & development status
The TG-RERA certificate names AKULA SRINIVAS GOUD as promoter. The supplied corporate information does not establish an entity type, corporate registration identifier, registered office or official project contact details; the project record’s promoter field uses “AKULA.”
The proposed project completion date recorded in the RERA project information is 03/06/2027. Separately, the tentative layout approval requires infrastructure and amenities within two years from 03 February, 2025, states validity up to 03 February, 2027, and provides for a possible one-year extension on specific request. No extension or completed handover is documented in the supplied material.
10. Approvals, official records & documents
TG-RERA registration certificate, P02600011127: Form C records VIVEKANANDA NAGAR as registered from 03/02/2025 to 03/02/2027.
Tentative layout approval, 0001/LO/3158/2025: Asifabad Municipality approval dated 03 February, 2025 for a tentative residential layout in Sy. No. 47/2, stating 41 plots and layout conditions. The approval states that it is not proof of title.
Layout-plan details, file G1/354/LS/2020; application TS/049053/2024: Layout drawing records plot schedule, land-use statement and road widths; its OCR does not show a completed approval number or approval date.
Form B declaration: Filed declaration states that the land is free from encumbrances and sets out title, development and project-fund undertakings; the declarant’s name and date are OCR-rendered unclearly.
Allotment-letter form: A partially completed plot allotment-letter form is available; it does not establish an allotment to a named buyer.
Floor-plan evidence: No apartment floor plan is supplied; the drawing review records one layout sheet and no flats.
Occupancy/completion certificate: None supplied. The available approval is tentative layout approval.
Frequently asked questions
Is VIVEKANANDA NAGAR registered with Telangana RERA?
Yes. VIVEKANANDA NAGAR is registered with the Telangana Real Estate Regulatory Authority as P02600011127; the registration status is New Project.
Who is the developer of VIVEKANANDA NAGAR?
The promoter named in the RERA registration is AKULA.
Where is VIVEKANANDA NAGAR located?
VIVEKANANDA NAGAR is in ASIFABAD, Sandeep nagar, Asifbad, Kumuram Bheem (Asifabad), Telangana (504293).
When will VIVEKANANDA NAGAR be completed?
The promoter's proposed date of completion filed with RERA is 03/06/2027. This is the promoter's declaration, not a guarantee.